1. For efficiency, have all tools/materials known to be needed for the scheduled maintenance ready prior to starting 2. Communicate with supervisors/operators of the scheduled maintenance to be performed. Briefly discuss how the equipment is running and if there are any problems that they know of that need to be addressed. Inform them of the pending LOTOTO of the machine 3. Do a walk around, checking the general condition for any obvious damage/deficiencies. 4. Perform systems check; making sure safety devices, bin arms, rollers, etc. are functioning properly. 5. Perform LOTOTO procedures. Procedures should be in the document box located on the machine. Perform “Group LOTOTO” procedures if more than one person is working on the machine. 6. Perform all scheduled maintenance 7. If replacement parts are necessary, look for them in inventory first. Parts that need to be ordered, must be cleared through the proper supervisor’s/managers. 8. Take all necessary precautions if LOTO locks are to be removed for testing purposes. Replace them after the test run has been performed 9. Replace all guards upon completing the service 10. Inform all necessary personnel of the intent to remove the LOTO locks prior to removing them. 11. Do final systems check 12. Inform all pertinent parties, that the machine is ready to go back into production and/or and problems that would affect the safe operation of the equipment (i.e., parts that need to be ordered)

Untitled Page

WEEKLY

  • Perform a systems check of machine functions

  • Perfrom check of all emergency stops, (back door, point of operation guard, front door cover, and laser).

  • General exterior cleaning of excess grease

  • Perform LOTOTO

  • Remove millscale from the machine

  • Guide and transmission device cleaning

  • Filter units cup cleaning

  • Bending unit lubrication

  • Lubrication of cutting unit

  • Bending unit lubrication 3 D

  • Traction unit lubrication

  • Lubrication of the horizontal straightener unit

  • Lubrication of the vertical straightener unit

  • Lubrication of the motorized wire change

  • Lubrication of the flap

  • Lubrication of the prestraightener assembly

  • Lubrication of payoff spindle

  • Central mandrel check

  • Checking motorised payoff spindle traction wheel

  • Check the adjustable wire guide

  • Automatic lubrication control unit

  • Checking and if necessary replacing the wire guide holes at the mouth of the external straightener

  • Traction and measuring wheels check

  • Check that the bolts which secure the blades are tightened correctly (fixed and mobile)

  • Perform a systems check of safety devices and machine functions

  • Replace all guards and safety devices. Collect all tools from the area

  • Inform personnel around the area that LOTO Locks are being removed

Parts Ordering/Notes or Comments

  • Serviced or Replaced any parts?

  • Parts Ordered

  • Notes/Comments

  • Add signature

  • Select date

  • Is this a Monthly Inspection?

  • Cleaning the dataplates and indicator lights

  • Cleaning the cooling fan filters

  • Electrical cabinet cleaning

  • Check the state of wear of the wheels of the prestraightener

  • Check and, if necessary, replace the rollers of the prestraightener

  • Checking reduction unit oil level

  • Check the correct tightening of the external and internal straightener guides

  • Straightening and traction wheels turning over

  • Check of the distance between movable and fixed blades

  • Check of the motor brake wear status (for threephase motors only)

  • Add signature

  • Select date

  • Is this a Quarterly Inspection?

  • Check Primary and Secondary Pulling unit Gear box oil

  • Check gear box oil on traction, bending and shear reduction units

  • Add signature

  • Select date

  • Is this a Bi-Annual Inspection?

  • Checking that the yellow lines marking off the operator area are visible and if necessary restore them

  • Replacing the fixed blade

  • Replacing the mobile blade

  • Check the supports of the prestorage flap

  • Check correct tightening of prestorage flap bolts

  • Changing the cooling fan filters

  • Check oil level of the hydraulic power unit (Prestraightening assembly)

  • Verification of the accumulator precharge (Prestraightening assembly)

  • Flexible hose check (Prestraightening assembly)

  • Add signature

  • Select date

  • Is this an Annual Inspection?

  • Replacing reduction unit oil

  • Checking the earthing system

  • Check the physical and chemical condition of the oil

  • Replacing hydraulic power unit oil

  • Add signature

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.