Information
-
Job # / Job Name
-
Conducted on
-
Prepared by
-
Location
-
Document No.
Quality Control Item
JOB PREP
-
Verify all material deliveries
-
Is there rental equipment being used at this job?
-
Equipment / Vendor / Serial #
-
Sprinkler heads masked and protected
-
Lifts protected from over spray
-
Masking of items not to be painted completed
-
Ceiling heaters checked for ignition points
-
Safety harness and lanyards inspected before use in lifts
-
Floor protected
-
Everyone has on proper PPE
JOB PROGRESS / WRAP UP
-
Washing or blow down to remove dirt & contaminants complete
-
All failing paint areas properly scraped & primed
-
Painted areas checked for holidays and misses
-
All areas checked for overspray and cleaned as necessary
-
All masking removed including sprinkler heads
-
Floor swept clean and mopped if needed
-
All garbage neatly bagged for disposal
-
Equipment cleaned and ready for return
-
All miscellaneous items back in place
JOB COMPLETION
-
Paint cans dated & labeled for color and area used
-
Equipment been called off / returned?
-
No - why not? Yes - call off confirmation.
-
Returns called in for pick up to supplier
-
Completed final walk thru prior to walking with the customer
-
After photos / take as many as you can (try to get them from the same angle as the before photos)
Customer Contact
-
Customer walk thru complete and all areas are satisfactory
-
Customer unable to complete walk thru
- Spoke on the Phone
- Left Message
-
Contact #
-
My signature acknowledges that I have walked this job and have found all workmanship to be of professional quality
-
Foreman's Signature & Date