Information

  • Job # / Job Name

  • Conducted on

  • Prepared by

  • Location
  • Document No.

Quality Control Item

JOB PREP / PROGRESS

  • Verify all material deliveries

  • Machined greased and checked before use

  • Cables checked for damage before and after use

  • Washing with degreaser of areas that are contaminated

  • Floor drains and caps protected and marked

  • Anchor bolts and other obstructions in floor removed to prevent machine damage

  • All tape and masking removed at completion of work

JOB COMPLETION

  • Machines checked for damage before loaded in truck

  • Diamond wear checked and reported to office if new ones are needed

  • Vacuum is emptied and cleaned

  • Hand tools cleaned

  • All miscellaneous items back in place

  • Opened product labeled / dated and left for customer

  • Unopened product returned to store

  • Rental equipment returned

  • Completed final walk thru prior to walking with the customer

Customer Contact

  • Customer walk thru complete and all areas are satisfactory

  • Customer unable to complete walk thru

  • Contact #

  • My signature acknowledges that I have walked this job and have found all workmanship to be of professional quality

  • Foreman's Signature & Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.