Information
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Commissioning Plan
-
1.1 Is the commissioning plan in place and being adhered to ?
-
1.2 Is the commissioning sequence in accordance with the design specification ?
-
1.3 Does the plan account for access and egress during commissioning; that plant is stable ; the interaction of plant and people, work processes and other people ?
-
1.4 Are environmental factors considered in the plan ?
-
1.5 Does the plan ensure compliance with the electrical wiring standards (AS 3000 ) ?
-
1.6 Are all staff onsite aware of the plan ? Are all workers / Contractors / visitors aware of changed status of works, i.e. Live power, pressure , chemicals etc. ?
-
1.7 If other contractors are required for commissioning, has the contractor ensured that they are aware of the risks and they are inducted property ?
-
1.8. Does the commissioning plan identify new risks , issue, risk mitigations ?
2. Commissioning Team
-
2.1 Has a commissioning team been nominated ? Are the necessary people available ? Are contact details available and visible
-
2.2. Has the commissioning lead and person managing the process been nominated and clarified ? Are contact details available and visible ? Is the person competent ?
3. Risk Assessments
-
3.1. Does the commissioning process require a separate risk assessment ?
-
3.2. For specific OHS&E risk identified in the plan, have the control measures been put in place ?
-
3.3. Does the plan include instructions on the correct use of guarding and other control measures ; how to safety access and operate the plant ; who may use the item of plant ( for example, only authorised or licensed operators ) ; how to carry out inspections, shut down , cleaning , repair and maintenance ; traffic rules, rights of way, clearances and no go areas for mobile plant ; emergency procedures ?
-
3.4. If temporary works are required, have they been implemented ?
-
3.5. Are plans in place for chemical delivery ?
-
3.6. Are guards/ barricades required ? Are they in place ? Where it is not practical to provide guarding and people are required to operate or pas closes to dangerous moving parts , is a safe system of work in place to reduce risk ?
4. Contingencies
-
4.1 Have contingencies been identified in the commissioning plan ? Are they in place ? <br><br>
-
4.2. Do the procedures incorporate systems for handling failures ?
-
4.3. Do the procedures include all energy sources such as gas , water and electrical systems failing at initial start-up ?
-
4.4. Unsafe or damaged lifting equipment, including ropes, slings, chains, hooks?
-
4.5. licensing or proof competency of operators?
-
4.6. Recorded procedures for cleaning, servicing and maintenance?
5. Documentation
-
5.1. Are "As Built " drawings available ? If "As Built" drawings are not available , are drawings marked in red ?
-
5.2. Are the O & M manuals available onsite ? Are they understood by operators ?
-
5.3. Have equipment and plant data and calibration sheets been completed ?
-
5.4. Is the current control strategy available ?
-
5.4. Have necessary certificates been issued ? ( e.g. Certificate of Electrical Safety )
-
5.6. Are pump curves available ?
-
5.7. Are instrument set points being recorded ?
6 Defects List
-
6.1. Is there a defects list? Is it kept up to date ? Any potential safety hazards should be actioned immediately.
7. Training
-
7.1. Is there a need to train the end user and maintenance personnel in either the use or maintenance of the new plant or equipment ?
-
7.2. Can the training be isolated from other work still occurring on site ?
-
7.3. Does the training commence only when the plant and equipment is fully commissioned and all testing complete ?
-
7.4. If training can commence prior to commissioning, does it need to be isolated ?
8 Signage
-
8.1. Has the contractor declared that commissioning activities are taking place onsite ? Are there signs indicating that commissioning is taking place
-
8.2. Are there appropriate signs present indicating that electrical switchboard is live ?
-
8.3. Are locks and tags available ?
9. Handover- Prior to handover of the site , ensure appropriate processes are in place to allow for the transfer of relevant safety information, including the following
-
Technical instructions
-
Safety of the end user, including any personal training
-
Safety of building maintenance personal.
-
Requirements for licensing, notifications, permits etc
-
Final inspection report including safety reports, commissioning data, handover certification, engineering sign offs, occupancy permits, the risk register and identification of any remaining safety risks.
General Comments
-
Enter any comments or corrective action / follow ups here
Sign Off
-
Gippsland Water Responsible Officer
-
On site representative
-
Auditor's signature