Information

  • HK Project Number

  • Project Name

  • Location
  • Conducted on

  • Prepared by

  • Personnel

  • LEGEND:
    Compliant= 5. Opportunity for improvement= 3 Minor Non compliant= 2. Non compliant= 0 N/A= (No score)

    Non compliance requires an action comment and an RFA HK.FM-33 to be raised

    Minor non compliance requires an Action comment for follow up

Start up Checklist

  • 1.1 Has the Project Initial Quality Review Checklist HK.FM-77 been implemented for this project

  • 1.2 Has the Project Initial Environmental Review checklist HK.FM-88 been implemented for this project

  • 1.3 Is the Master Document Register HK.FM-40 on site and up to date

  • 1.4 Has the Project Specific Major Risk Register HK.FM-95 been implemented for this project

  • 1.5 Are all appropriate forms, registers, HK policy statements, basic rules, safety alerts and posters on display

Site Organisation

  • 2 .01 Is the WHS Management Plan HK.FM-66 being maintained and up to date

  • 2.02 Is the Environmental Management Plan HK.FM-104 being maintained and up to date

  • 2.03 Is the Inspection Test Plan (ITP) HK.FM-63 being maintained

  • 2.04 Are completed documents filed in their correct folders. Namely separate folders for Site Inductions, SWMS. While the WHS Management Plan is to contain JSA reviews, permits, toolbox talks, Plant & Machinery checklist

  • 2.05 Have all workers signed in via a site sign in book or using a site specific sign in procedure

  • 2.06 Is a First Aid Register HK.FM-03 available for use together with an appropriate 1st Aid Kit

  • 2.07 Are 1st Aid personnel nominated and displayed.

  • 2.08 Is there an Emergency Contact Register HK.FM-27 on display

  • 2.09 Is there an up to date Evacuation Plan on site

  • 2.10 Is a Hazardous Chemical Register HK.FM-90 being used and maintained.<br>

  • 2.11 Are permits for Hot Works, Working at Heights and Confined Space being used and maintained

  • 2.12 Is the Plant and Machinery Inspection Checklist HK.FM-94 being used and maintained

  • 2.13 Is there a H&K SDS register on site and accessible for all workers.

  • 2.14 Are Subcontractors presenting with SDS sheets for their own materials coming on site

  • 2.15 Have Site Inductions HK.FM-99 been fully completed <br>

  • 2.16 Have Subcontractor SWMS been presented and signed off by all relevant workers

  • 2.17 Are Subcontractor JSA Review checklists HK.FM-96 being used on all SWMS

  • 2.18 Are toolbox meetings being conducted and recorded on HK.FM-14

  • 2.19 If applicable to this Project, do all Subcontractors have Police or DCSI clearances

  • 2.20 Is an evacuation drill planned and on what date<br>

  • 2.21 Has the drill been carried out on the scheduled date and recorded on HK.FM-24

Site Observations

  • 3.1 Are workers performing their tasks according to their SWMS

  • 3.2 Has all electrical equipment been tested, tagged and up to date.

  • 3.3 Are all electrical leads being managed on site in a safe manner.

  • 3.4 Does the workplace area have adequate lighting.

  • 3.5 Are fire extinguishers located within ready access to an exit.

  • 3.6 Do the extinguishers have a current test tag<br>

  • 3.7 Are gas bottles secured in a trolley or secured to a wall

  • 3.8 Is the site or work area free from rubbish and obstructions.

  • 3.9 Is the site waste being sorted for recycling

  • 3.10 Have hazardous objects, openings or areas been protected or isolated.

  • 3.11 Are materials being stored in a safe and orderly manner

  • 3.12 Are hazardous chemicals labelled and stored correctly

  • 3.13 Are site amenities being kept clean and well maintained.

Evaluation

  • 4.1 Are Site Safety Audits HK.FM-97 being undertaken at the frequency declared in the WHS Management Plan HK.FM-66

  • 4.2 Are Environmental Audits HK.FM-89 being undertaken at the frequency declared in the Environmental Management Plan HK.FM 104

  • 4.3 Have all outstanding issues from the previous audits been dealt with

Auditors Comments:

  • 5.1 Detail any issues from this audit that could be improved

  • 5.2 Detail any issues from this audit that requires an RFA to be raised

  • Close Out Signature .

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.