Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Applicant
2. SUBJECT LAND
-
Lot/DP:
-
Owner:
-
Description of Development:
3. DA/CDC/CC CERTIFICATE NO.
-
DA/CDC/CC NO:
-
Date of Issue:
4. TYPE OF CERTIFICATE
-
Specified building/subdivision work has been completed and complies with plans and specifications
-
- Strip footing
- Frame
- Floor slab
- Wet area flashing
- Sub-floor frame
- Stormwater drainage
- Internal drainage
- External drainage
- Trade waste
- Stackwork
- Plumbing final
- Pool backwash
- Other
-
- Strip footing
- Frame
- Floor slab
- Wet area flashing
- Sub-floor frame
- Stormwater drainage
- Internal drainage
- External drainage
- Trade waste
- Stackwork
- Plumbing final
- Pool backwash
- Other
-
- Strip footing
- Frame
- Floor slab
- Wet area flashing
- Sub-floor frame
- Stormwater drainage
- Internal drainage
- External drainage
- Trade waste
- Stackwork
- Plumbing final
- Pool backwash
- Other
-
Condition(s) has/have been complied with
-
Give details of the specific condition(s) of development consent OR complying development certificate and detail the matter the condition relates to and the standard/instruments that the matter is required to comply with
5. DETERMINATION CERTIFICATE
-
Wagga Wagga City Council certifies that:
-
The above described building/supervision work has been completed and complies with the attached plans and specifications and the above described aspects of development complies with the prescribed requirement referred to above
-
The above condition(s) has/have been complied with
-
The compliance certificate is REFUSED for the following reasons
-
INSPECTION DATE OF BUILDING/SUBDIVISION WORKS
-
Signature
-
Issue Date
-
Given to
-
Add drawing