Information

  • Audit Title

  • Document No.

  • Client / Site

  • Location
  • Applicant

SUBJECT LAND

  • Lot/DP:

  • Owner:

  • Description of Development:

DA/CDC/CC CERTIFICATE NO.

  • DA/CDC/CC NO:

  • Date of Issue:

PREVIOUS INSPECTIONS CARRIED OUT

  • Internal Sewer

  • Footings

  • Floor Slab

  • Internal Water

  • External Sewer

ONGOING MATTERS FOR BUILDER/CONTRACTOR TO CHECK (IF CDC)

  • Builder's sign

  • Sediment and erosion controls

  • Builder's toilet

  • Downpipes installed (CDC)

  • Protection of public space by fencing or hoarding

  • Protection and support of adjoining buildings

  • Is site compliant with conditions of Development Application

BUILDING SURVEYOR'S CHECKLIST

Frame

  • Check floor plan with Approval

  • Underfloor access

  • Sub-floor ventilation & clearance

  • Antcapping and damp-proof course

  • Floor bearers/Joists spacing/size/Crippling

Two-Storey Construction

  • Deep floor joists/blocking, spacing size

  • Wet area flooring / grade flooring

  • Timber grades / sizes and supports

  • Straightening of studs

  • Blocking to corner junctions

  • Bracing

  • Hold down of roof and walls

  • Wall sisilation

  • Insulation provided

  • Ceiling heights

  • Ensure compliance with accessibility requirements of AS1428.1 (Circulation spaces / room sizes)

  • Heads and lintels

  • Steel sizes

  • Flashing of windows and doors

  • Sufficient support under point loads

  • Wall ties in place along with brickwork

  • Roof / Trusses / Bracing under load

  • Roof Sisilation / gap at ridge

  • Fixing of roofing / Batten size / Spacing

  • Cavities / Weep holes clean

  • Engaged piers in single-brick walls

Split-Level Construction

  • Cut Fill, retaining wall / subsoil drainage

  • Engineer's design, beam / Lintel / Retaining wall

  • Builder on site

  • Inspection report left on site

  • No builder's rubbish - levelled out

Summary

  • Result

  • Building Surveyor

  • Conducted on

  • Signature

  • Accreditation Number

  • Compliance Certificate Issued

  • Notes: Any engineers detail on tie down bracing etc over rules all other manufacturer details.

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.