Title Page
-
Site
-
Conducted on
-
Prepared by
-
Client
-
Job Number
-
Document No.
-
Footing purpose
Checks, tests and verification
-
Set out of site correct as per drawing?
-
If scope changed, has PM or client rep approved the changes?
-
If location/size of footing changes, mark up as builts
-
Excavation dimensions (width and depth) correct and free from organic matter, loose material and voids?
-
Steel reinforcing type correct, adequetly lapped, tied, supported and concrete cover achieved?
-
Depth of concrete maintained at piping or conduit penetrations
-
Footing inspected prior to concrete pour. Correct conduits and bends placed in correct location as per drawings
-
Photos of footing prior to concrete pour
-
Conduits emerging at suitable position
-
Proposed finished floor level appears to be correct at this stage of construction
-
Comments/Remarks
-
Photos after concrete pour
-
Sign off