Site Info

  • Project

  • Client

  • Date

  • Foundation No.

  • Date of Drilling/Excavation

  • Date of Placement

  • Drawing No.

  • Revision No.

  • Mix Design

  • Batch Plant Identifier

  • Batch Ticket Number(s)

Foundation Details (Remarks, Initial, Date)

  • Design Pier Diameter (ft)

  • Theoretical Concrete Volume (Yd3)

  • Constructed Pier Diameter (ft)

  • Length Drilled/ Excavated Soil (ft)

  • Depth Rock Encountered (ft)

  • Length Drilled/Excavated Rock (ft)

  • Cutting Match Boring Log (Y or N) If No, Describe

  • Actual Concrete Volume (Yd3)

  • Field Added Admixtures (Type & Quantity)

  • Sheer Key Installed (Y or N) If Yes, Note Elevation

  • Earth Grade Elevation (ft)

  • Top of Concrete (TOC) Elevation (ft)

  • Total Pier Length (ft)

  • Causing Utilized___Temp___Permanent (LF)

  • Method of Construction (Wet/Dry, Dewatering req'd, Slurry type, etc.)

  • Reinforcing Steel

  • Vertical#___@___

  • Splice Installed (Y or N), If Yes, Note Elevation

  • Ties #___@___

  • T1

  • T2

  • T3

  • Anchor Bolts

  • Anchor Bolt Orientation Confirmed w/Plans (Y or N)

  • Anchor Bolt Projection (in)

  • Additional Comments

  • Subcontractor (Company)

  • Subcontractor (Signature)

  • Subcontractor (Date)

  • Contractor (Company)

  • Contractor (Signature)

  • Contractor (Date)

  • Owner Rep/Testing/Inspector (Company)

  • Owner Rep/Testing/Inspector (Signature)

  • Owner Rep/Testing/Inspector (Date)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.