Site Info
-
Project
-
Client
-
Date
-
Foundation No.
-
Date of Drilling/Excavation
-
Date of Placement
-
Drawing No.
-
Revision No.
-
Mix Design
-
Batch Plant Identifier
-
Batch Ticket Number(s)
Foundation Details (Remarks, Initial, Date)
-
Design Pier Diameter (ft)
-
Theoretical Concrete Volume (Yd3)
-
Constructed Pier Diameter (ft)
-
Length Drilled/ Excavated Soil (ft)
-
Depth Rock Encountered (ft)
-
Length Drilled/Excavated Rock (ft)
-
Cutting Match Boring Log (Y or N) If No, Describe
-
Actual Concrete Volume (Yd3)
-
Field Added Admixtures (Type & Quantity)
-
Sheer Key Installed (Y or N) If Yes, Note Elevation
-
Earth Grade Elevation (ft)
-
Top of Concrete (TOC) Elevation (ft)
-
Total Pier Length (ft)
-
Causing Utilized___Temp___Permanent (LF)
-
Method of Construction (Wet/Dry, Dewatering req'd, Slurry type, etc.)
-
Reinforcing Steel
-
Vertical#___@___
-
Splice Installed (Y or N), If Yes, Note Elevation
-
Ties #___@___
-
T1
-
T2
-
T3
-
Anchor Bolts
-
Anchor Bolt Orientation Confirmed w/Plans (Y or N)
-
Anchor Bolt Projection (in)
-
Additional Comments
-
Subcontractor (Company)
-
Subcontractor (Signature)
-
Subcontractor (Date)
-
Contractor (Company)
-
Contractor (Signature)
-
Contractor (Date)
-
Owner Rep/Testing/Inspector (Company)
-
Owner Rep/Testing/Inspector (Signature)
-
Owner Rep/Testing/Inspector (Date)