Information
-
MNOPS Case #
-
MNOPS Inspector
-
Inspection Start Date
-
Brief Site Description
-
Operator / Contractor
-
Site Location
-
Personnel Interviewed
Construction Questions
-
Daily/Site Inspection Report
Date/Site
Basic Site Information
-
Date for this inspection
-
Project Synopsis
-
Location
-
(if different from basic site location)
-
Existing Pipe Description [size, type, pressure, etc]
-
New Pipe Description [size, type, pressure, etc]
General Construction Considerations
-
General Construction Considerations?
GSOC Info
-
GSOC Ticket Number
-
Notes
-
Photo
-
Construction Plan Reviewed?
-
Construction Specifications Reviewed?
-
Condition of Pipe Materials?
-
Elimination of Rocks & Debris in Pipe Contact Area?
-
Back-fill Free of Materials That Could Damage Pipe or Coating?
-
Caps on Stockpiled Pipe / Temporary End Caps on Pipe in Ditch and Stored Pipe?
-
Proper Cover?
-
Meter Set / Above Ground Facilities Protected From Damage?
-
Carrier Protected in Casing?
-
Fire Extinguisher Available and Date Checked?
-
Shear Sleeve Installed at Service Tee Outlet?
-
Excess Flow Valve Installed Where Required?
-
Is any directional drilling/boring involved in the project?
-
Does operator's directional drilling/boring procedures include actions to protect their facilities from the dangers posed by drilling and other trench less technologies (i.e. cross bores)?
-
Do records / observations indicate that directional drilling/boring procedures were followed to protect their facilities from the dangers posed by drilling and other trench less technologies (i.e. cross bores)?
-
Following excavation tolerance zone and maintaining clearance?
Steel Pipelines
-
Steel Pipeline?
-
Welder Qualification/Card Checked and Not Expired?
-
Welding Procedures Checked?
-
Weld Inspections and NDT Requirements?
-
Buried pipe examined for external corrosion when exposed?
-
Pipe removed from pipeline examined for internal corrosion?
-
Cathodic Protection Voltage Checked?
-
External Coating; Fittings and Welds Coated or Wrapped?
-
Anode(s) Installed?
-
Test Leads?
-
Pressure Testing?
-
Check duration, pressure, and use of calibrated equipment.
Plastic Pipelines
-
Is there plastic pipe?
-
Frequency of Heating Iron Temperature Checks by Fuser?
-
Reviewed Fuser’s Documentation of Heating Iron Temperature Checks?
-
Pressure Testing / Pretesting?
-
Check duration, pressure, and use of calibrated equipment.
-
Is the date of manufacture on the pipe less than permissible UV exposure for outdoor storage, or does the operator have records for indoor storage?<br>-Medium Density PE (Yellow PE2406/PE2708) shall not be exposed to UV rays, direct or indirect, for longer than 3 years.<br>-High Density PE (Black PE3408/PE4710) shall not be exposed to UV rays, direct or indirect, for longer than 10 years.<br>(provided operator manual has been updated and allows for storage longer than historical two years)
-
Pipe Marking ASTM 2513 or 2517?
-
Joining Qualification/Card Checked and Not Expired?
-
Fusion Procedures Checked?
-
Fuser knows Cooling Time Between Final Fusion & Leak Test/Rough Handling/Handling?
-
Cooling Time Matches Fusion Procedures?
-
Locate Wire Splices Coated/Protected?
Site Sketch or Photo
-
Include Site Sketch?
-
Drawing
-
Include Site Photo(s)?
-
Photo
Notes
-
Record any pertinent notes
Notes
Operator Qualifications / Drug & Alcohol
-
Check OQ? [maintenance/rehab/O&M covered?]
-
Random Check of OQ For Which Person(s) [PHMSA Form 15 – Protocol 9]. Record employee name and covered task,
-
Span of control utilized?
-
Direct Supervision of Any Unqualified Person(s) [192.805(c)]?
-
Employee(s) recognize Abnormal Operating Conditions (AOCs)?
-
Supervisor understands Drug and Alcohol – Reasonable suspicion, accident, training [199] requirements?
Summary / Violations
-
Synopsis
-
Any probable violations observed?
-
Description of Any Probable Violation Found
-
Exit Interview Completed?
-
Photos