Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
FDH
-
Contractor
Construction Checklist
-
AERIAL PLACEMENT
-
Strand properly tensioned
-
Strand properly attached and secured at poles
-
Strand properly guyed and anchored
-
Strand properly bonded and grounded to MGVN or TGR
-
Min clearances met at poles, midspans and crossing locations
-
Fiber is lashed correctly to strand and bug nuts / bonding nuts in place
-
Flat fiber or drops are correctly secured and tensioned with J-hooks and P-clamps
-
Cables have Lit Fiber cable ID wraps at poles
-
Slack loops are correctly positioned and del-tec used to secure to fiber
-
Splice cases are properly hung, bonded, labeled, and cables have ID tags & color tape
-
OFDC's are properly hung, labeled, and cables have ID tags & color tape
-
Stand off brackets, alley arms, flying corners, etc. are properly secured
-
RISER LOCATIONS
-
Duct is secured up the pole with u-clamps
-
Duct sweep at base of pole and strand location is uniform and 36" min bend radius
-
Riser Guards and duct boot are placed and secured to the pole
-
All vacant ducts are capped or sealed
-
DUCTS
-
Correct quantity and size of ducts were placed
-
Correct Footage Reported
-
Duct installed at correct depth
-
Ducts have muletape inside and secured at both ends of duct
-
Duct has tracer wire run outside and along the duct path or inside
-
Fiber warning posts installed approx every 500 ft
-
Trench path and any disturbance has been restored properly
-
VAULTS/FLOWERPOTS
-
Vault set with top level to and matching existing grade
-
Ground around the vault has been properly backfilled, compacted and seeded
-
Vault has a minimum of 6" of tamped gravel base
-
Vault (if splice location) has 5/8" X 8ft ground rod driven into the ground
-
Ducts are sealed at both ends and muletape secured and ground wire visible
-
Ducts not excessively protruding into the vault and layout prevents kinking, etc
-
Slack loop / splice case / OFDC's are properly secured, mounted, and labeled
-
Fiber min / max bend radius is not exceeded
-
Lid is seated properly latched or secured with bolts
-
Fiber warning post placed at vault location (not required at flowerpots)
-
SPLICE CASES/OFDC's:
-
Cables / drops properly secured
-
Cables have color tape identification for feed / distribution
-
### Checklist:
-
On-site Inspection
-
Cables have ID tags and at least one per case has Lit Fiber cable wrap.
-
Case / OFDC is labeled with Vetro / Vitruvi ID number (ex: SC-00007412)
-
All entrance ports sealed and no missing plugs
-
Splice cases are properly bonded / grounded.
-
Case case or OFDC is properly mounted to strand / pole / vault.
-
Cables / drops are secured, neatly organized and not kinked.
-
Areas observed that require additional restoration
-
SIGNATURE OF LIT TEAM MEMBER