Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Photo of Construction Permit

Permit / Notifications Requirements

  • Is a Notification required?

  • Did the Contractor notified the DoL regarding the construction work?<br>CR 4(1)

  • Was the notification send to DoL 7 days prior to the start of the construction work?<br>CR 4(1)

  • Is the Notification available on site?

  • Is a Permit from DoL required?

  • Has a permit been obtained for the construction work by the Client?<br>CR 3(1)

  • Did the Client appointed a Construction Health & Safety Agent?<br>CR 5(5)

  • Is the permit displayed on the entrance gate?<br>CR 3(4)

  • Is a copy of the permit in all the Principle Contractors Health & Safety Files<br>CR 3(6)

Legal Appointments: The following appointments might be required - verify against the actual work to be done on site

  • Construction Health & Safety Agent (if required)<br>CR 5(5)

  • Is the CHSA properly registered with the SACPCMP?<br>Verify the registration certificate

  • Any additional comments

  • Designer - Principle Contractor & Client appointments<br>CR 6

  • Principle Contractor<br>CR 5(1)(k)

  • Sub-Contractors<br>CR 7(1)(c)(v)

  • List the Sub-contractors at the time of the audit

  • Section 16.2 Appointees<br>S16.2

  • Competent person for Machinery<br>GMR 2(1)

  • Construction Manager<br>CR 8(1)

  • Assistant Construction Manager<br>CR 8(2)

  • Construction Supervisors<br>CR 8(7)

  • Assistant Construction Supervisors<br>CR 8(8)

  • Construction Health & Safety Officer<br>CR 8(5)

  • Is the CHSO registered with the SACPCMP

  • Employee Health & Safety Representatives<br>Sec 17

  • Employer Health & Safety Representatives<br>Sec 17

  • First Aiders<br>GSR 3

  • Incident Investigator<br>GAR 9

  • Person responsible for conducting Risk Assessments<br>CR 9(1)

  • Fall Protection Plan - Responsible person for developing & maintaining<br>CR 10(1)

  • Temporary Works Designer<br>CR 12(1)

  • Temporary Works Supervisor<br>CR 12(2)

  • Excavation Supervisor<br>CR 13(1)(a)

  • Demolition Supervisor<br>CR 14(1)

  • Scaffold Erector<br>CR 16(1)

  • Suspended Platform Supervisor<br>CR 17(1)

  • Rope Access Supervisor<br>CR 18(1)(a)

  • Material Hoist Supervisor<br>CR 19(8)

  • Bulk Mixing Plant Supervisor<br>CR 20(1)

  • Explosive Actuated Fastening Devices Issuer & Inspector<br>CR 21(2)(b)

  • Tower Crane Erection Supervisor<br>CR 22(a)

  • Lifting Machine Operator<br>GMP

  • Operators of Construction Vehicles & Mobile Plant<br>CR 23(d)(ii)

  • Responsible Person for Temporary Electrical Installation & related equipment<br>CR 24(d)

  • Stacking & Storage Supervisor<br>CR 28(a)

  • Competent person responsible for fire fighting equipment and emergency evacuation procedures?<br>CR 29(h)

  • Fire & Emergency Co-ordinator<br>GMP

  • Fire Marshall<br>GMP

  • Ladder Inspector<br>GMP

  • Hand Tools Inspector<br>GMP

  • Hazardous Chemical Substance Co-ordinator<br>GMP

Functioning of Health & Safety Representatives

  • Is this Category applicable?

  • Can Contractor proof that the H&S Reps were nominated by employees?<br>Sec 17 & 18

  • Are regular inspections done and are those records available on site?<br>Sec 18

  • Are H&S Reps involved during incident investigations?<br>GAR 9

  • Is there a H&S Representative Committee established and are minutes of the meetings held available on site?<br>GAR 19

Reporting & Investigation of Incidents

  • Are comprehensive incident reports for all fatalities & permanent disability cases sent to the DoL?<br>CR 5(3)

  • Are all Incidents as per Section 24, 25 & GAR 8 reported to the DoL?<br>CR 5(3)

  • Are all incidents requiring medical treatment recorded on Annexure 1 forms and is it properly investigated?<br>GAR 9

Health & Safety Plan & File

  • Did the Principle Contractor submit a comprehensive and detailed H&S plan to the Client & was the plan approved by the Client?<br>CR 7(1)(a) & CR 5(1)(l)

  • Is the H&S plan site & project specific?<br>CR 7(1)(a)

  • Does the Health & Safety Plan complies and addresses all issues as per legal requirements? - Risk Assessments<br>CR 9(1)

  • Are Ergonomic risks addressed in the Health & Safety Plan?<br>CR 9(2)

  • Are employees on site trained on the content of the Health & Safety Plan?<br>CR 9(3)

  • Are the Health & Safety Plans for Principle & Sub Contractors reviewed after incidents and when changes are made in the design?<br>CR 9(7)

  • Are the Health & Safety files kept by the Principle & Sub Contractors on site and is it available for inspection?<br>CR 7(1)(b) & CR 7(2)(b) & CR 5(1)(m)

Fall Protection

  • Is this Category applicable?

  • Is the Fall Protection Plan drafted and contain all the information as per the legal requirement?<br>CR 10(2)

  • Are opening in floors or sides of floors from through or from which persons fall enclosed with handrails<br>CR 10(3)

  • Are the Fall Arrest / Prevention equipment sufficient for the purpose of use and securely attached to a safe point on the structure or plant?<br>CR 10 (4)(c)(i) & (ii)

  • Are Fall Arrest equipment only used in instances where Fall Protection equipment cannot be used?<br>CR 10(4)(d)

  • Are employees trained on the Fall Protection Plan and are the training records available on site?<br>CR 10(2)(c)

Duties of Principle Contractor to Sub-contractor

  • Is this Category applicable?

  • Are periodic site audits conducted of all work performed by Sub-Contractors - at least every 30 days?<br>CR 7 (1)(c)(vii) & CR 5 (1)(o)

  • The Principle Contractor have a list of all Sub-Contractors on site and contains information on accountability, agreements signed and type of work to be performed?<br>CR 7(1)(f)

  • Are contractors stopped when doing work in an unsafe manner or when it is not done in line with the Health & Safety Plans?<br>CR 7(1)(c)(viii)

  • Are all the Health & Safety files of Sub-Contractors approved & signed by the Principle Contractor?<br>CR 7(1)(c)(x)

  • Are Health & Safety Files available on site for all the Sub-Contractors?<br>CR 7(1)(d)

  • Are all the Sub-Contractors registered and in good standing with COIDA or other licensed compensation insurer as per COIDA - is the letters available on site?<br>CR 7(1)(c)(iv)

  • Have all Sub-Contractors been appointed in writing and appointment letters is available on site?<br>CR 7(1)(c)(v)

Medical Certificates of Fitness

  • Are all the employees of the Principle Contractor on site in possession of a valid medical certificate of fitness issued by an OHP?<br>CR 7(8)

  • Are all the medical certificates of fitness issued in the form of Annexure 3?<br>CR 7(8)

  • Does the medical certificate of fitness issued address all possible exposure and job specifications?<br>CR 7(8)

Induction Training ( Staff & Visitors)

  • Do all visitors to the site receive induction training and are those training records kept on site?<br>CR 7(6) & (7)

  • Did all employees employed on site received induction training and are those training records kept on site?<br>CR 7(5) & (7)

Roof Work

  • Is this Category Applicable?

  • Is roof work properly planned?<br>CR 10(5)(a)

  • Are weak areas and openings on the roof covered?<br>CR 10(5)(d)

  • Are roof ladders, duct boards or other safety devices or equipment available that is suitable to the weights of persons performing work?<br>CR 10(5)(e)

  • No roof work are allowed during bad weather?<br>CR 10(5)(c)

  • Where possible, are handrails, barriers & toe boards installed along the side of the roof?<br>CR 10(5)(f)

Temporary Works

  • Is this Category applicable?

  • Are all temporary works erected in accordance with the structural design drawings?<br>CR 12(3)(b)

  • Are all the design drawings & calculations for temporary works kept on site?<br>CR 12(3)(c) & CR 6(2)

  • Are all staff members required to perform work on a temporary works properly trained?<br>CR 12(3)(d)

  • Are all the equipment used in temporary works inspected before use?<br>CR 12(3)(e)

  • Are all temporary works inspected before, during & after placement of concrete and at least daily and a register is kept?<br>CR 12(3)(f)

  • Concrete is only casted after written permission has been granted by the Temporary Works Supervisor?<br>CR 12(3)(g)

  • Are safe means of access provided to all temporary works?<br>CR 12(3)(m)

Excavations

  • Is this Category applicable?

  • Are all excavations inspected daily, after blasting, after fall of ground, after damage to supports & after rain. Is a register kept of all inspections?<br>CR 13 (2)(h)

  • Are all excavations sufficiently safeguarded from collapse?<br>CR 13(2)(b)

  • Are excavation accessible to the public safeguarded by 1m high barrier or fence and when poor visibility is present with warning flashing lights?<br>CR 13 (i)(i & ii)

Demolition Work

  • Is this Category applicable?

  • Was a detailed structural engineering survey carried out prior to any demolition work?<br>CR 14(2)

  • Material are not disposed of from heights unless it is done using a chute and that the chute is constructed of sound material and strong enough to handle the load?<br>CR 14(5) & (6) & (7)

  • If asbestos is present, did the contractor submitted a workplan to DoL?<br>CR 14(9)

  • Are the asbestos work done by a DoL approved Asbestos Contractor?<br>CR 14(9)

  • Are monitoring been conducted by an DoL approved AIA during the asbestos demolition process?<br>CR 14(9) & AR 8

  • Has a method statement been drafted and implemented for tasks requiring the use of explosives?<br>CR 14(11)

Scaffolding

  • Is this Category applicable?

  • Are all scaffolding erected & use in compliance with provisions od SANS 10085?<br>SANS 10085 & CR 16

  • Are all scaffolding inspected after erection and before use, weekly, after damage, after rain and before demolition and is a register kept of these inspections?<br>SANS 10085 & CR 16

Suspended Platforms

  • Is this Category applicable?

  • Has a Certificate of System Design been issued by a Professional Engineer for the Suspended Platform in use? <br>CR 17(2)(b)

  • Is an Operational Compliance Plan drafted & implemented that address all the requirements as per CR 17(2)(c)?<br>CR 17(2)(c)

  • Were copies of the Certificate of System Design & Operational Design Drawings submitted to DoL prior to the use of the Suspended Platform? <br>CR 17(3)

  • Are all staff working inside the Suspended Platform wearing full body harnesses? <br>CR 17(6)(c)

  • Are hand & power tools used inside the Suspended Platform secured to prevent movement? CR 17(6)(d)

  • Are a notice indicating the maximum mass load, maximum number of persons & maximum load fitted inside the Suspended Platform? <br>CR 17(7)(c)

  • Is the Suspended Platform inspected and load tested at intervals as per the manufacturer's instruction? <br>CR 17(8)(d)

  • Are all ropes and hooks inspected after assembly & before use and at intervals not exceeding 3 months? <br>CR 17(9)

  • Are daily inspections carried out that cover all issues as per legal requirement? <br>CR 17(10)

  • Are inspections & test records available on site? <br>CR 17(11)

  • Are all the operators of Suspended Platforms trained in the safe use of equipment & body harnesses & emergency procedures? <br>CR 17(12)

  • Are outriggers only moved by competent persons and the installation inspected by a supervisor prior to use? <br>CR 17(13)

  • Are the Suspended Platforms properly secured while not in use as to prevent unauthorised use?<br> <br>CR17(14)

Rope Access Work

  • Is this Category applicable?

  • Are all the rope access staff members properly registered and licensed for the task to be performed?<br>CR 18(1)(c)

  • Are the rope access equipment used safe and in compliance with safety standards?<br>CR 18(2)(a)

  • Is a rescue plan drafted and implemented?<br>CR 18(3)

Material Hoists

  • Is this Category applicable?

  • Were all material hoists erected as per technical standard?<br>CR 19(1)

  • Are all the sides of the material hoist on ground & floor level enclosed up to at least 2.1 meter?<br>CR 19(2)(b)

  • Are gates which is at least 2.1 meter in height installed at all landings?<br>CR 19(2)(c)

  • Are items transported on the material hoists secured as prevent movement?<br>CR 19(4)

  • Are the maximum loading capacity displayed on the material hoist?<br>CR 19(5)

  • Are material hoists inspected daily and is a register kept of all inspections?<br>CR 19(8)

Explosive Actuated Fastening Devices (EAFD)

  • Is this Category applicable?

  • Are all the EAFD's in compliance and safe for use?<br>CR 21(1)

  • Are all EAFD's inspected daily and is a register kept of all the inspections?<br>CR 21(2)(b)

  • Are records kept of all EAFD's and cartridges issued?<br>CR 21(2)(g)

Lifting Machines & Cranes

  • Is this Category applicable?

  • Are all lifting tackle inspected at intervals not exceeding 3 months and registers kept for such inspections?<br>DMR 18

  • Are all lifting machines inspected by an LME & LMI at intervals not exceeding 6 months and registers kept for such inspections?<br>DMR 18

  • Are all lifting machines load tested by LME & LMI at intervals not exceeding 12 months and registers kept for such load testing?<br>DMR 18

  • Are the operators of lifting machines and cranes properly trained and are the training records available on site?<br>CR 22(e)

Construction Vehicles & Mobile Plant

  • Is this category applicable?

  • Are all operators trained and competent to operate the equipment? CR 23(1)(d)

  • Are all the vehicles and mobile plant fitted with signalling and reverse signalling devices? CR 23(1)(f) & (j)

  • Are all vehicles and mobile plant fitted with structures preventing items falling onto the operator? CR 23(1)(h)

  • Are all vehicles and mobile plant inspected daily and is a register of such inspections available on site? CR 23(1)(k)

  • Are vehicles and mobile plant used for the transportation of staff fitted with seats for each person being transported? CR 23(2)(i)

Electrical Equipment

  • Are Electrical Certificate of Compliance available for all temporary switchboards or electrical connections used?<br>EIR 7

  • Are all temporary electrical installations inspected weekly by a competent persons and is a register kept of such inspections?<br>CR 24(d)

  • Are all portable electrical equipment inspected daily and is a register kept of such inspections?<br>CR 24(e)

Use & Storage of Flammable Liquids

  • Is this Category applicable?

  • Are all flammable liquids properly & safely stored on site?<br>CR 25(a)

  • Are smoking prohibited near the flammable storage facility?<br>CR 25(b)

  • Are there sufficient fire fighting equipment installed in close vicinity of the flammable storage and are the symbolic signs in place?<br>CR 25(c)

  • Are no more of 1 days quantity of flammable liquids issued from the store?<br>CR 25(d)

  • Are all flammable liquid containers kept close when not in use?<br>CR 25(e)

  • When decanting, are all the metal containers bonded and earthed?<br>CR 25(f)

  • Are flammable containers stored separately from other flammable materials such as rags, paper etc...<br>CR 25(g)

Work Performed Close to Water

  • Is this Category applicable?

  • Are fall protection & fall arrest or life jackets made available to staff who perform work in close proximity to water?<br>CR 26

Housekeeping & General Safeguarding of Site

  • Are good housekeeping practices implemented and maintained on the site?<br>CR 27

  • Is the construction site properly fenced off with controlled entrance?<br>CR 27(f)

  • Are nets & catch platforms erected above areas where persons pass as to prevent items from falling onto them?<br>CR 27(g)

Stacking & Storage

  • Are good stacking & storage practices implemented and maintained on the site? (check for demarcation, cleanliness, inspections)<br>CR 28

  • Stacking heights do not exceed 3 times the smallest dimension of the underlying base?<br>GSR 8

Fire Precaution

  • Are sufficient quantities & correct type of fire fighting equipment available on site?<br>CR 29

  • Are all the fire fighting equipment inspected by a competent person and is a register kept of such inspections?<br>CR 29(h)

  • Are Fire Marshalls appointed and properly trained?<br>CR 29(I)

  • Is an evacuation plan drafted & implemented?<br>CR 29(l)

  • Is there a fire siren available on site?<br>CR 29(m)

Toilets & Change Room Facilities

  • Is this Category applicable?

  • Are there at least 1 shower available for every 15 staff members?<br>CR 30(1)(a)

  • Are there at least 1 toilet available for every 30 staff members?<br>CR 30(1)(b)

  • Are there change facilities for each sex?<br>CR 30(1)(c)

  • Are sheltered eating areas available to all staff?<br>CR 30(1)(d)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.