Audit

ContinueCare at Hendrick automatic transfer switches
Generator #5

LTAC #1 8HE1 Equipment Branch

Used to start generator

LTAC #2 8HC1 Critical Branch

Used to start generator

LTAC #3 8HLS1 Life Safety Branch

Used to start generator

LTAC #4 8LLS1 Life Safety Branch

Used to start generator

LTAC #5 8LE1 Equipment Branch

Used to start generator

LTAC #6 8DLC Critical Branch

Used to start generator

Signature of tech performing test
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.