Information
-
Audit Title
-
Conducted on
-
Prepared by
-
Location
-
Contractor responsible for site.
1.0 - Test and Tag
-
1.1 - Have the reports for this site been received by FM?
-
1.2 - Have the reports for this site been saved in DM5?
-
1.3 - Have any failed items been repaired/actioned?
-
1.4 - Select 3 items at random. Are the 3 random items/appliances/tools within current test date as per schedule?
Comments
-
Comments/Remarks/Actions Taken?
2.0 - RCD Testing
-
2.1 - Have the RCD test logs for this site been received by FM?
-
2.2 - Have RCD test logs for this site been saved into DM5?
-
2.3 - Have failed items been repaired?
-
2.4 - Are the RCD's in the switchboards clearly labelled with identification numbers?
Comments
-
Any Comments /Remarks/Actions taken?
Sign Off
-
Auditor's signature