Title Page
-
Contract or Project Name:
-
Contract or Number / Ref:
-
Name of Principle Supplier / Contractor:
-
CoGG Contract Superintendent:
-
Name of any Sub-Contractors:
-
Date:
-
Location
GENERAL SAFETY MANAGEMENT SYSTEM
OHS Structure and Systems (policy / procedures, Aims, commitment, etc.)
-
On site copies of the Health and Safety Policy / Procedures including defined responsibilities.
-
Photo of Evidence
-
Reason for Non-conformance
-
Non Conformance to be rectified by:
Safe Work Practices and Procedures (relevant to the contract)
-
On site copies of the SWMS and relevant work instruction / procedures
-
Photo of Evidence
-
Reason for Non-conformance
-
Non Conformance to be rectified by:
Incident Reporting and Investigation
-
On site copy of a accident/incident form / book <br>On site copy of a Hazard reporting form
-
Photo of Evidence
-
Reason for Non-conformance
-
Non Conformance to be rectified by:
Health and Safety Inspections
-
On site copy of a checklist that is used for completing workplace inspections
-
Photo of Evidence
-
Reason for Non-conformance
-
Non Conformance to be rectified by:
Health and Safety Consultation
-
Copy of toolbox meeting minutes, diary notes of consultation activities, reviews to SWMS with sign-off by contractors employees.
-
Photo of Evidence
-
Reason for Non-conformance
-
Non Conformance to be rectified by:
PLANT and EQUIPMENT
Inspections
-
Mobile plant operation applicable to this site?
-
Are daily plant operation checklists recorded?<br>Are maintenance records available for the equipment being used?<br><br>
-
Photo of Evidence
-
Reason for Non-conformance
-
Non-Conformance to be rectified by:
-
Do all operators of mobile plant hold a current and appropriate license?
-
Photo of Evidence
-
Reason for Non-conformance
-
Non-Conformance to be rectified by:
-
Confirm no mobile plant operating on site
Working under power-lines
-
Working under power-lines applicable to this site?
-
Has the SWMS identified this hazard?<br>Has Energy Safe Victoria been notified of the works?<br>Are all persons appropriately trained and are ‘spotters’ being used?<br><br>
-
Photo of Evidence
-
Reason for Non-conformance
-
Non-Conformance to be rectified by:
-
Confirm working under power-lines not applicable to this site
Traffic Management (as per AS1742.3)
-
Is Traffic Management applicable to this site?
-
Mobile plant is being used (e.g. Excavators, Elevated Work Platforms, Trucks, Deliveries) has a traffic management plan been developed, and is it reviewed daily when there is a change or if there is an incident?<br>
-
Photo of Evidence
-
Reason for Non-conformance
-
Non-Conformance to be rectified by:
-
Confirm Traffic Management plan not required
CHEMICALS
Systems of Work
-
Are Chemicals being used on this site?
-
Has a safe system of work been identified in the SWMS? Are the controls on the SWMS being implemented on the worksite?
-
Photo of evidence
-
Reason for Non-conformance
-
Non-conformance to be rectified by:
-
Are current MSDS available for ALL chemicals that are on the worksite?
-
Photo of evidence
-
Reason for Non-conformance
-
Non-conformance to be rectified by:
-
Are all chemicals stored appropriately and not decanted into unlabeled containers
-
Photo of evidence
-
Reason for Non-conformance
-
Non-conformance to be rectified by:
-
Confirm no Chemicals being used on site
MANUAL HANDLING
-
Is Manual handling applicable to this worksite?
-
Has Manual handling been identified in the SWMS?
-
Photo of evidence
-
Reason for non-conformance
-
Non-conformance to be rectified by:
-
Are manual handling controls being applied
-
Photo of evidence
-
Reason for Non-conformance
-
Non-conformance to be rectified by:
PUBLIC SAFETY
-
Is Public safety applicable to this worksite?
-
Are warning signs in place? (i.e. on roads and/or footpaths)
-
Photo of Evidence
-
Reason for non-conformance?
-
Non-conformance to be rectified by?
-
Is the site adequately signed/fenced to prevent uncontrolled public access?
-
Photo of Evidence
-
Reason for non-conformance?
-
Non-conformance to be rectified by?
-
Can the site be controlled after hours?
-
Photo of Evidence
-
Reason for non-conformance?
-
Non-conformance to be rectified by?
-
Are all public surfaces (footpaths, roads etc) free from debris, work activities, stored materials, vehicles etc?
-
Photo of Evidence
-
Reason for non-conformance?
-
Non-conformance to be rectified by?
-
Is lighting suitable for night time public access?
-
Photo of Evidence
-
Reason for non-conformance?
-
Non-conformance to be rectified by?
-
Is safe pedestrian access to shops and residence maintained?
-
Photo of Evidence
-
Reason for non-conformance?
-
Non-conformance to be rectified by?
-
Have appriopriate notices advising of works been distributed to affected traders/residents?
-
Photo of Evidence
-
Reason for non-conformance?
-
Non-conformance to be rectified by?
-
Confirm public safety not applicable to this worksite
ELECTRICAL
-
-
Photo of evidence
-
Is electrical equipment being used on this site?
-
Have safe systems of work been established within the SWMS?
-
Photo of evidence
-
Reason for Non-conformance
-
Non-conformance to be rectified by?
-
Are the controls on the SWMS being implemented on the worksite?
-
Photo of evidence
-
Reason for Non-conformance
-
Non-conformance to be rectified by?
-
Have all electrical items (power tools, extension cords, generators etc) been tested and tagged and is the test up to date?
-
Photo of evidence
-
Reason for Non-conformance
-
Non-conformance to be rectified by?
-
Confirm no electrical equipment is being used on site
OTHER
-
Are other High risk activities associated with these works?
-
Please outline other High risk activites
-
Evidence of compliance
-
Confirm no other high risk activities are to be performed as part of these works