Title Page

  • Premises

  • Inspector’s Name

  • Location
  • Date

Construction Site SHEW Inspection

  • INSTRUCTIONS
    ----------------------
    1. Please answer all the questions below.
    2. Add photos and notes by clicking on the paperclip icon
    3. To add a Corrective Action click on the paperclip icon then "Add Action," provide a description, assign to a member, set priority, and due date
    4. Complete audit by providing digital signature
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Welfare Facilities

  • Does the contractor have access to suitable welfare provisions?

Site Documentation

  • Has the supplier been subjected to formal evaluation and approval? (Leadec or Bosch)

  • Have documented RAMS including COSHH Assessments been produced for the works being undertaken?

  • Have the contractors undertaken a formal site induction delivered by the responsible Bosch person?

  • Does the contractor have in date training records for the works they are carrying out? (Gas safe; Electrical qualified; Legionella; Fire Warden / Extinguisher)

  • If carrying out any intrusive works on a building constructed before the year 2000, are they Asbestos Awareness Trained as a minimum?

  • If applicable (any building constructed before the year 2000) has the contractor been provided with a copy of the asbestos register?

  • Has the contractor signed in?

  • Are contractors wearing ID badges?

  • Has a permit been issued by a Bosch responsible person? If yes was the permit issued at the place of work by a person competent in the task that the permit is been issued for?

  • If applicable, has a fail safe isolation process been implemented?

  • If carrying out hot work activities, are a minimum of 2 x fire extinguishers located within arms reach? (one must be water or foam)

  • Does the contractor know the relevant Bosch emergency procedures for the site being worked at?

  • If portable mains fed electrical tools are in use, are they within an in date current Portable Appliance Test frequency?

  • Are the contractors neat in appearance?

  • If applicable, are calibration or service records available for the tools or equipment being used?

  • Are noise and vibration exposure details know for any power tools?

  • Are vibration exposure details being recorded for those people using high risk hand held vibrating equipment?

  • Are records available for weekly PUWER inspections?

  • Are records available on site for lifting equipment & accessories? (Lifting Equipment 12 x monthly; Lifting accessories 6 x monthly; Any lifting equipment used for persons 6 x monthly)

Work Area

  • Fully stocked and in date First Aid Box, Eye wash & Burns kit

  • Fire Extinguisher(s) adequate, correct locations, in date, signage?

  • Enough barriers of a sufficient standard to demark work area ensuring an exclusion zone is in place?

  • Adequate, secure storage containers (may include shipping containers/Plant safe/Strong boxes)

  • Adequate amount of Drip trays / Plant Nappies & Spill kits available in the correct locations?

  • Gloves and goggles in each spill kit

  • Chemicals, liquids and lubricants stored on Storage Bunds

  • Gas Cylinder Cage in use where required

  • All HERAS fencing double clipped and correctly footed?

Work at Height

  • Are work at height activities being undertaken safely?

  • Is the correct work at height equipment being utilised following the work at height hierarchy? (i.e. Ladders as the last resort)

  • If ladders are being used are they the correct type? Tall enough for the task in hand? Records of weekly inspections? (Scaff Tag)

  • If working off a ladder, is the ladder being used safely? Is the person maintaining a minimum of 3 x points of contact?

  • If applicable, has scaffolding been erected following a design, or TG20 compliance sheet?

  • Has a scaffolding hand over certificate been issued?

  • Are formal weekly scaffolding inspections being carried out and records held on site?

  • Has a documented formal rescue plan been produced, held on site?

  • PASMA Towers - Has the mobile tower been installed correctly by a PASMA trained person?

  • Are the wheels locked on the mobile tower?

  • Is a tag attached to the tower identifying the date it was erected and the dates of the weekly inspections?

  • If using MEWPS / Scissor Lifts / Mobile Powered Access equipment has a suitable exclusion zone been implemented?

  • Is the MEWP within it's six monthly Thorough Examination?

  • Are users of MEWPS trained? (IPAF certificate?

  • If applicable are formal harness / lanyard inspection records available?

  • If working at height near overhead cranes etc have these been isolated (lock out/tag out)?

Personal Protective Equipment

  • Are contractors wearing the correct PPE for the tasks being undertaken? (Safety footwear; Impact Glasses; Gloves; Hard Hat; Hi-Viz; Hearing Protection; RPE Mask)

  • Persons using RPE (masks) have been fit tested?

Task Specific Inspection Checklist

Site permits in place and operational

  • Confined Space

  • Permit To Dig

  • Working at Height

  • Hot Works

  • Isolation Permit

  • Electrical Permit

  • DSEAR

Excavations

  • CAT & Genny scans completed using calibrated eqt (Ground Penetrating Radar on larger jobs/areas)

  • Soil, spoil, vehicles, plant and storage away from sides of excavation

  • Excavation battered back / stepped

  • Trench box / Shoring

  • Suitable access and egress

  • Fall arrest & rescue arrangements if significant depth

  • Arrangements for casualty evacuation

  • Excavation daily inspection

  • Signage / Barriers (edge protection)

Task Specific Inspection Checklist

Confined Space Entry

  • Permit to enter open, safety equipment operational

  • Harnesses, tripods, winches, gas monitors tagged and in date

  • Adequate Rescue Plan

  • Tripod & Winch LOLER certification

Traffic Management

  • Traffic / Pedestrian Plan if required

  • Pedestrian routes clearly demarcated including crossing points

  • Movement of plant controlled

  • Banksman appointed

Access & Egress

  • Adequate Lighting

  • General access and egress sufficient

  • Access stairways suitable and unobstructed

  • Protection of the public commensurate with location and risk

  • Overhead Obstructions – Power cables (Safe systems to GS6 standard implemented)

Lifting Operations

  • Lifting Plan

  • Signaller / Slinger Appointed / banksman

  • Lifting equipment LOLER certificated

  • For mobile cranes we are using a CPA Contracted Lift unless Stonbury has supplied an Appointed Person

Demolition

  • Demo Plan

  • Asbestos Refurbishment & Demolition Survey undertaken and acted upon

  • Temporary Works - Ensure stability of structure(s)

  • Disconnection of services Isolations in place and permits issued

Environmental Controls

  • Waste Carriers Licence available for vehicles carrying waste

  • Waste Transfer/ Consignment Notes available for vehicles carrying waste

  • Noise / Dust / Vibration / Contamination controls

Completion

  • Inspection Signed Off By : (Name & Signature)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.