Information
-
* Company Name
-
* Work Site (Location)
-
* Work Site (ESA)
-
* Company Officer’s Name
-
* Date of Inspection
Section 1
-
SECTION 1. Project Manager or their representative is to complete this form.
Information
-
Separable Portion
-
Work Order Number
-
Company’s Representative Name
-
Company’s Representative Phone No (incl. Area Code)
-
Company Officer’s Phone No (incl. Area Code)
-
Company employee – Business unit & LOB (e.g. Network Construction / Wideband)
-
Company employee - State
- NSW
- VIC
- QLD
- WA
- SA
- TAS
- NT
- ACT
-
WBS / Network Number / Activity Number
-
Brief Description of the Works
Special Qualifications for Inspection? Y - Yes N - No NA - Not Applicable
-
Electrician
-
Licence No.
-
Registered Builder
-
Licence No.
-
Rigger / Dogman
-
Licence No.
-
Confined Spaces
-
Licence No.
Inspection timing I - Initial, Inspection carried out on contractor commencing work for the company. D - During, Inspection carried out whilst contractor is working on site. C - Completion, Inspection carried out following practical completion.
-
Please select one symbol below that can describe the timing of this inspecion
Section 2
Occupational Health & Safety P - Pass F - Fail NA - Not Applicable
Health and Safety Systems
-
Site Induction records
-
Workplace inspection records
-
Emergency procedures
-
Documented safe work procedures (JSA)
-
Personal Protective Equipment including Gas detection and EME monitoring (e.g. Radman)
-
Licences/competency records
Electrical
-
Power tools in good condition
-
Tools and leads inspected and tagged
-
No cable trip hazards
-
Lock-out procedures/danger tags in place
-
Earth leakage systems used
Housekeeping
-
Work areas free from rubbish & obstructions
-
Free from slip/trip hazards
-
Floor openings covered
-
Stock/material stored safely
Mobile Plant and Equipment
-
Plant and equipment in good condition
-
Daily safety inspection procedures/checklists
-
Operators trained
-
Operators accredited / licensed
-
Warning and instructions displayed
-
WLL (or SWL) of lifting or carrying equipment displayed
Calibration
-
Test gear used for final commissioning & acceptance within calibration
Prevention of Falls
-
All work platforms have secure handrails, guarding or fence panels
-
Harness and lanyard or belts provided
-
All floor penetrations covered or barricaded
-
Unsafe areas signposted and fenced
-
Safe work procedures are in use
Hazardous Substances
-
Stored appropriately
-
Containers labelled correctly
-
MSDS sheets
-
Chemical register developed
-
Appropriate emergency/first aid equipment-shower, eye bath, extinguishers
Ladders
-
Ladders in good condition
-
Ladders not used to support planks for working Platforms
-
Correct angle to structure 1:4
-
Extended 1.0 metre above top landing
-
Ladders securely fixed at top
-
Metal ladders not used near live exposed Electrical equipment
First Aid
-
First aid kit on site & in date
-
First aiders identified in induction
Section 2 cont.
Fire Control
-
Fire fighting equipment serviced/tagged
-
Emergency exit signage
-
Exit doors easily opened from inside
-
Exit pathways clear of obstruction
-
Alarm/communication system-adequate
-
Flammable storage procedures
-
Emergency personnel identified
-
Emergency telephone numbers displayed
Welding
-
Gas bottles securely fixed to trolley
-
Fire extinguisher near work area
-
LPG bottles within 10 year stamp
-
PPE provided and worn
-
Hot Work permit system used
Excavations
-
Excavation >1.5m deep is benched, battered or shored
-
Shoring is stable
-
Documented inspection of shoring system
-
Angle of battering is sufficient to prevent collapse
-
Excavated and other material or plant is > 1m from excavation edge
-
Electrical hazards underground/overhead
-
Excavation well secured
-
Signage displayed
-
Clear and safe access around excavation
-
Separate access and egress points from excavation
-
Safe work procedure in place
Confined Spaces
-
Risk assessment undertaken
-
Communication and rescue plan in place
-
Safety equipment in good working condition
-
Suitable training provided to employees
-
Confined space permit used
Public Protection
-
Appropriate barricades, fencing, hoarding, gantry, Secure in place
-
Signage in place
-
Suitable lighting for public access
-
Footpaths clean and free from debris
-
Dust and noise controls in place
-
Site access controlled
-
Traffic control procedures in place
Section 3
Quality Management P - Pass F - Fail NA - Not Applicable
Equipment Check
Rack
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Subrack
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Pigtail
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Cables (RF, Power, Alarm , Communications, Optic)
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Manholes
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Pits
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Trench/Plough/Directional Drilling
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
FAP
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
AC Distribution Board
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Battery
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Feeder
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Antenna
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Structure
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Shelter
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Other
-
Labelled correctly?
-
Constructed as per Work Order/Design Pack?
-
Mounted/Installed Correctly?
Site / Compound (includes landscaping)
-
Site access road serviceable
-
Perimeter fence secure and in good condition
-
Appropriate signage fitted
-
Debris / Rubbish / Surplus material removed
-
Landscaping/ screening not as per design / work order
-
Reinstatement satisfactory
-
Comments (Provide comments of standard of work etc)
Section 4
Environmental Management P - Pass F - Fail NA - Not Applicable
Vegetation & Weed Management
-
Weed material removed and/or disposed of appropriately?
-
Has machinery wash down been carried out in quarantine areas or as specified?
-
Is the area to be cleared identified correctly and clearly marked?
-
Is clearing and machinery access restricted to the assessed construction footprint?
-
Has digging activities been carried out in a manner that minimises damage to limbs or roots system (i.e. outside the dripline)?
Heritage
-
Is there adequate protection around identified heritage items or places (inc. Aboriginal sites)?
-
Does the identified heritage item show any damage resulting from work activity?
Materials & Stockpiles
-
Are materials and stockpiles stored away from trees?
-
Are materials and stockpiles stored away from drainages or waterways?
-
Are there appropriate protective and sedimentation controls?
Waste & Wastewater
-
Is waste (esp. hazardous) and wastewater (e.g. from pits & during boring activity) being disposed of appropriately?
Soil Management
-
Are erosion sediment controls implemented and operating effectively (e.g. gravel bags, diversion/check banks, sediment fences, sandbags)?
Working near/within/across waterways & water bodies
-
Have approvals been gained and are appropriate measures in place to reduce sedimentation and pollution of the water?
Reinstatement
-
Are trenches being compacted in layers, top soil relayed and the appropriate erosion controls in place (e.g. soil bunds, brush matting, silt fences, check dams)?
Other
-
Is there evidence of spills?
-
Have adequate controls been implemented in high fire risk areas?
-
Have permit conditions been complied with (e.g. EPA, Council DA, noisy work, after hours work)?
-
Does contractor have appropriately trained staff – are there records?
-
Have there been any environmental incidents and have they been managed according to their procedure – are there incident reports?
-
Have any audits/inspections been carried out on the environmental aspects of the project and are there audit/inspections reports?
-
Have environmental assessments of site been undertaken and risks briefed to those entering site?
-
Has the work caused serious / ongoing visual impact?
Section 5
Contract compliance
-
Meets project timelines
- NA
- Unsatisfactory
- Marginal
- Acceptable
- Good
- Superior
-
Contractor Employees’ conduct on site and appearance
- NA
- Unsatisfactory
- Marginal
- Acceptable
- Good
- Superior
-
WINS procedure adhered to and documents available on site
- NA
- Unsatisfactory
- Marginal
- Acceptable
- Good
- Superior
-
Management of Subcontractors
- NA
- Unsatisfactory
- Marginal
- Acceptable
- Good
- Superior
-
Adherence to Quality systems
-
Adherence to Safety systems
-
Adherence to Environmental Systems
-
General Comments (Provide comments of standard of work etc)