Information

  • * Company Name

  • * Work Site (Location)

  • * Work Site (ESA)

  • * Company Officer’s Name

  • * Date of Inspection

Section 1

  • SECTION 1. Project Manager or their representative is to complete this form.

Information

  • Separable Portion

  • Work Order Number

  • Company’s Representative Name

  • Company’s Representative Phone No (incl. Area Code)

  • Company Officer’s Phone No (incl. Area Code)

  • Company employee – Business unit & LOB (e.g. Network Construction / Wideband)

  • Company employee - State

  • WBS / Network Number / Activity Number

  • Brief Description of the Works

Special Qualifications for Inspection? Y - Yes N - No NA - Not Applicable

  • Electrician

  • Licence No.

  • Registered Builder

  • Licence No.

  • Rigger / Dogman

  • Licence No.

  • Confined Spaces

  • Licence No.

Inspection timing I - Initial, Inspection carried out on contractor commencing work for the company. D - During, Inspection carried out whilst contractor is working on site. C - Completion, Inspection carried out following practical completion.

  • Please select one symbol below that can describe the timing of this inspecion

Section 2

Occupational Health & Safety P - Pass F - Fail NA - Not Applicable

Health and Safety Systems

  • Site Induction records

  • Workplace inspection records

  • Emergency procedures

  • Documented safe work procedures (JSA)

  • Personal Protective Equipment including Gas detection and EME monitoring (e.g. Radman)

  • Licences/competency records

Electrical

  • Power tools in good condition

  • Tools and leads inspected and tagged

  • No cable trip hazards

  • Lock-out procedures/danger tags in place

  • Earth leakage systems used

Housekeeping

  • Work areas free from rubbish & obstructions

  • Free from slip/trip hazards

  • Floor openings covered

  • Stock/material stored safely

Mobile Plant and Equipment

  • Plant and equipment in good condition

  • Daily safety inspection procedures/checklists

  • Operators trained

  • Operators accredited / licensed

  • Warning and instructions displayed

  • WLL (or SWL) of lifting or carrying equipment displayed

Calibration

  • Test gear used for final commissioning & acceptance within calibration

Prevention of Falls

  • All work platforms have secure handrails, guarding or fence panels

  • Harness and lanyard or belts provided

  • All floor penetrations covered or barricaded

  • Unsafe areas signposted and fenced

  • Safe work procedures are in use

Hazardous Substances

  • Stored appropriately

  • Containers labelled correctly

  • MSDS sheets

  • Chemical register developed

  • Appropriate emergency/first aid equipment-shower, eye bath, extinguishers

Ladders

  • Ladders in good condition

  • Ladders not used to support planks for working Platforms

  • Correct angle to structure 1:4

  • Extended 1.0 metre above top landing

  • Ladders securely fixed at top

  • Metal ladders not used near live exposed Electrical equipment

First Aid

  • First aid kit on site & in date

  • First aiders identified in induction

Section 2 cont.

Fire Control

  • Fire fighting equipment serviced/tagged

  • Emergency exit signage

  • Exit doors easily opened from inside

  • Exit pathways clear of obstruction

  • Alarm/communication system-adequate

  • Flammable storage procedures

  • Emergency personnel identified

  • Emergency telephone numbers displayed

Welding

  • Gas bottles securely fixed to trolley

  • Fire extinguisher near work area

  • LPG bottles within 10 year stamp

  • PPE provided and worn

  • Hot Work permit system used

Excavations

  • Excavation >1.5m deep is benched, battered or shored

  • Shoring is stable

  • Documented inspection of shoring system

  • Angle of battering is sufficient to prevent collapse

  • Excavated and other material or plant is > 1m from excavation edge

  • Electrical hazards underground/overhead

  • Excavation well secured

  • Signage displayed

  • Clear and safe access around excavation

  • Separate access and egress points from excavation

  • Safe work procedure in place

Confined Spaces

  • Risk assessment undertaken

  • Communication and rescue plan in place

  • Safety equipment in good working condition

  • Suitable training provided to employees

  • Confined space permit used

Public Protection

  • Appropriate barricades, fencing, hoarding, gantry, Secure in place

  • Signage in place

  • Suitable lighting for public access

  • Footpaths clean and free from debris

  • Dust and noise controls in place

  • Site access controlled

  • Traffic control procedures in place

Section 3

Quality Management P - Pass F - Fail NA - Not Applicable

Equipment Check

Rack

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Subrack

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Pigtail

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Cables (RF, Power, Alarm , Communications, Optic)

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Manholes

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Pits

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Trench/Plough/Directional Drilling

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

FAP

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

AC Distribution Board

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Battery

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Feeder

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Antenna

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Structure

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Shelter

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Other

  • Labelled correctly?

  • Constructed as per Work Order/Design Pack?

  • Mounted/Installed Correctly?

Site / Compound (includes landscaping)

  • Site access road serviceable

  • Perimeter fence secure and in good condition

  • Appropriate signage fitted

  • Debris / Rubbish / Surplus material removed

  • Landscaping/ screening not as per design / work order

  • Reinstatement satisfactory

  • Comments (Provide comments of standard of work etc)

Section 4

Environmental Management P - Pass F - Fail NA - Not Applicable

Vegetation & Weed Management

  • Weed material removed and/or disposed of appropriately?

  • Has machinery wash down been carried out in quarantine areas or as specified?

  • Is the area to be cleared identified correctly and clearly marked?

  • Is clearing and machinery access restricted to the assessed construction footprint?

  • Has digging activities been carried out in a manner that minimises damage to limbs or roots system (i.e. outside the dripline)?

Heritage

  • Is there adequate protection around identified heritage items or places (inc. Aboriginal sites)?

  • Does the identified heritage item show any damage resulting from work activity?

Materials & Stockpiles

  • Are materials and stockpiles stored away from trees?

  • Are materials and stockpiles stored away from drainages or waterways?

  • Are there appropriate protective and sedimentation controls?

Waste & Wastewater

  • Is waste (esp. hazardous) and wastewater (e.g. from pits & during boring activity) being disposed of appropriately?

Soil Management

  • Are erosion sediment controls implemented and operating effectively (e.g. gravel bags, diversion/check banks, sediment fences, sandbags)?

Working near/within/across waterways & water bodies

  • Have approvals been gained and are appropriate measures in place to reduce sedimentation and pollution of the water?

Reinstatement

  • Are trenches being compacted in layers, top soil relayed and the appropriate erosion controls in place (e.g. soil bunds, brush matting, silt fences, check dams)?

Other

  • Is there evidence of spills?

  • Have adequate controls been implemented in high fire risk areas?

  • Have permit conditions been complied with (e.g. EPA, Council DA, noisy work, after hours work)?

  • Does contractor have appropriately trained staff – are there records?

  • Have there been any environmental incidents and have they been managed according to their procedure – are there incident reports?

  • Have any audits/inspections been carried out on the environmental aspects of the project and are there audit/inspections reports?

  • Have environmental assessments of site been undertaken and risks briefed to those entering site?

  • Has the work caused serious / ongoing visual impact?

Section 5

Contract compliance

  • Meets project timelines

  • Contractor Employees’ conduct on site and appearance

  • WINS procedure adhered to and documents available on site

  • Management of Subcontractors

  • Adherence to Quality systems

  • Adherence to Safety systems

  • Adherence to Environmental Systems

  • General Comments (Provide comments of standard of work etc)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.