Title Page
-
Document No. 18
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Is the electrical complete?
-
Are the light switches clear of a head board - master bedroom?
-
Are the flush boxes clear of the architrave - 65mm / 90mm?
-
Do we know what the head board height is?
-
Do we know what the master bed width is?
-
Are any nogs required for a TV in the master bedroom?
-
Is the cable installed for the garage door power point and opener switch?
-
Is there an alarm?
-
Is there any 2 way / 3 way switching required?
-
Are power points required to be clear of a splashback?
-
Does the rangehood power point need to be in the ceiling?
-
Is the cable installed for the underfloor electric heating?
-
Are the flush boxes marked on the floor? CHECK ALL ARE MARKED.
-
Where is the location of the heated towel wiring in the bathroom - right / left?
-
Where is the location of the heated towel wiring in the ensuite - right / left?