Title Page
-
Inspection date:
-
Employee name:
Checklist
-
Crane Inspected
-
Is the rated load marked on each side of the crane?
-
Is the rated load marked on each side of the hoist or its load block and this marking is clearly legible from the ground?
-
Are stops and bumpers installed securely at both limits of the trolley's travel?
-
Are bridge bumpers present on the crane structure?
-
Are guards for hoisting ropes and moving parts installed?
-
Has the holding brake of the hoist been tested and confirmed to be fully operational?
-
Are there any signs of physical damage or exposed wires in the electrical system?
-
Verified proper function, no interference, and correct clearance of mechanisms:
-
No deformation and cracks on hooks
-
Inspect hoist chain or rope, including end connections for excessive wear, twist, distorted links interfering with proper function, or stretch beyond manufacturer's recommendations
-
No corroded, deformed and cracked structural members
-
No abnormal noise during testing
-
The upper limit switch of each hoist shall be tried out under no load. The block shall be "inched" into the limit or run in at slow speed
-
The controller is not damaged and clean
-
All the inputs of the controller are working correctly
-
Do you want to add any comment?
-
Do you want to attach any media?