Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General Information
-
Time Begun
-
Today's Date
-
Location
-
Site Code
-
Service Code
-
Subcontractor
-
Subcontractor
-
Task Observed: Purpose: To verify electrical energy isolations risk controls are effective.
-
Supervisor / Observers
COMMENT / CORRECTIVE ACTION
-
Comment / Corrective Action / Responsible Person / Risk Ranking / Due Date / Date Completed
-
Photo
COMMENT / CORRECTIVE ACTION
-
Comment / Corrective Action / Responsible Person / Risk Ranking / Due Date / Date Completed
-
Photo
Planning and Behaviours:
General
-
1. Is there evidence of inductions, qualifications and competency for Operators and Electrical Isolation Officers?
-
Comments
-
2. Has a risk assessment on 'live' work been completed and authority obtained, proving it the lesser risk compared to working on de-energised plant?
-
Comments
-
3. Are safe behaviours being demonstrated, i.e. not complacent/distracted/ rushing?
-
Comments
-
4. Has a HV switching program been used and is it signed and approved by the responsible electrical person?
-
Comments
Clothing and Protection:
-
5. Are personnel involved in the task wearing appropriate PPE and relevant flame retardant clothing to correct standards, e.g. anti-static, ARC 1 or 2 as required?
-
Comments
Emergency and Rescue:
-
6. Are emergency procedures, rescue plans & equipment available and maintained in accordance with scheduled tests?
-
7. Are electrical systems designed and maintained to detect faults, eliminate overriding and provide protective settings?
-
Comments
-
8. Have personnel been trained in Low Voltage rescue and are LV rescue kits available in location?
-
Comments
-
9. Are Safety Switches (RCD's or ELCBs) in place and tested as scheduled?
-
Comments
Testing and Verification:
-
10. Testing equipment is calibrated maintained and compatible for the installation being tested?
-
Comments
-
11. Has ‘Test Before You Touch’ been completed and confirmed with Responsible Person?
-
Comments
-
12. Are energy sources and isolation points identified & labelled, including equipment feeding or receiving energy also requiring isolation?
-
Comments
Isolation and Access:
-
13. Is plant and equipment isolated to prevent unauthorised access or inadvertent operation, e.g. effective lockout/ tag out and / or isolation locks?
-
Comments
-
14. Are steps applied in sequence and communicated allowing authorised persons to remove locks/danger tag, e.g. Group Lock Outs, shift change and removing lock/tag of others if unable or incapacitated?
-
Comments
-
15. Design uses ‘whole circuit isolation’ and not a stop button on a control panel – i.e. power and control isolations?
-
Comments
-
16. Has verification been performed to ensure plant is safe to re-energise?
-
Comments
-
17. Have access and /or electrical work permits been issued as required and are all controls in place as specified?
Supervisor Checks:
-
18. Are maintenance schedules implemented for installations & systems?
-
Comments
-
19. Has a 'responsible person' been identified, completed Permits/planning documents and available for supervision?
-
Comments