  • Task Observed: Purpose: To verify electrical energy isolations risk controls are effective.

  • Supervisor / Observers

COMMENT / CORRECTIVE ACTION

  • Comment / Corrective Action / Responsible Person / Risk Ranking / Due Date / Date Completed

  • Photo

COMMENT / CORRECTIVE ACTION

  • Comment / Corrective Action / Responsible Person / Risk Ranking / Due Date / Date Completed

  • Photo

Planning and Behaviours:

General

  • 1. Is there evidence of inductions, qualifications and competency for Operators and Electrical Isolation Officers?

  • Comments

  • 2. Has a risk assessment on 'live' work been completed and authority obtained, proving it the lesser risk compared to working on de-energised plant?

  • Comments

  • 3. Are safe behaviours being demonstrated, i.e. not complacent/distracted/ rushing?

  • Comments

  • 4. Has a HV switching program been used and is it signed and approved by the responsible electrical person?

  • Comments

Clothing and Protection:

  • 5. Are personnel involved in the task wearing appropriate PPE and relevant flame retardant clothing to correct standards, e.g. anti-static, ARC 1 or 2 as required?

  • Comments

Emergency and Rescue:

  • 6. Are emergency procedures, rescue plans & equipment available and maintained in accordance with scheduled tests?

  • 7. Are electrical systems designed and maintained to detect faults, eliminate overriding and provide protective settings?

  • Comments

  • 8. Have personnel been trained in Low Voltage rescue and are LV rescue kits available in location?

  • Comments

  • 9. Are Safety Switches (RCD's or ELCBs) in place and tested as scheduled?

  • Comments

Testing and Verification:

  • 10. Testing equipment is calibrated maintained and compatible for the installation being tested?

  • Comments

  • 11. Has ‘Test Before You Touch’ been completed and confirmed with Responsible Person?

  • Comments

  • 12. Are energy sources and isolation points identified & labelled, including equipment feeding or receiving energy also requiring isolation?

  • Comments

Isolation and Access:

  • 13. Is plant and equipment isolated to prevent unauthorised access or inadvertent operation, e.g. effective lockout/ tag out and / or isolation locks?

  • Comments

  • 14. Are steps applied in sequence and communicated allowing authorised persons to remove locks/danger tag, e.g. Group Lock Outs, shift change and removing lock/tag of others if unable or incapacitated?

  • Comments

  • 15. Design uses ‘whole circuit isolation’ and not a stop button on a control panel – i.e. power and control isolations?

  • Comments

  • 16. Has verification been performed to ensure plant is safe to re-energise?

  • Comments

  • 17. Have access and /or electrical work permits been issued as required and are all controls in place as specified?

Supervisor Checks:

  • 18. Are maintenance schedules implemented for installations & systems?

  • Comments

  • 19. Has a 'responsible person' been identified, completed Permits/planning documents and available for supervision?

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.