Information

Inspection detail

  • Client

  • Property name

  • Property type

  • Conducted on

  • Inspection completed by

  • At the first stage of every inspection you must select the in built GSM tagging tool below. Click 'locate' and use the 'locate me' tab to assign the location, this will select the address you are located at. This is our electronic proof to satisfy insurers that the inspection took place at the location stated.

  • Confirmation of Location (GPS)

Signature

Section 1 - Property inspection

Property exterior and structure (Including Roadways)

  • General visual condition of structure

  • Guttering and downpipes

  • Surface water Drainage

  • Lighting

  • Exits, entrances and emergency provisions clear

  • Paving / pathways

  • Staircases / steps

  • Bin / waste storage areas (external - including compactors)

  • Gates / barriers

  • Boundary walls and fences

  • Roadways and traffic routes

  • Signage and road markings

  • Car parking facilities

  • General cleanliness / litter

  • Trees and landscaping

  • Another Location
  • Area / location

  • Condition

Internal common areas (Housekeeping, building fabrics, signage, heating / cooling, security)

  • Entrance / Reception<br>

  • Is the fire detection system fully operational and fault free?

  • Ground floor

  • Main Stair Well

  • 1st floor

  • 2nd floor

  • 3rd floor

  • 4th floor

  • 5th floor

  • 6th floor

  • 7th floor

  • Additional floors
  • Floor

  • Condition

  • Are there dedicated escape stair wells and final exits?

  • Escape routes clear (including dedicated stair wells)?

  • Final exit doors clear, well signed and fully functioning?

  • Is there a basement?

  • Basement corridors

  • Is there a lift?

  • Is there signage indicating the correct maintenance company?

  • Is the lift emergency phone line functioning correctly?

  • Risers secure and free of waste material

  • Are there common area welfare facilities?

  • Are the welfare facilities in a good, clean and functioning state?

  • Bin / waste storage areas (internal - including compactors)

  • Is there an internal parking or goods storage loading area?

  • Car parking facilities (internal)

  • Loading bay / goods areas (internal)

  • Area / location

  • Another Location
  • Condition

Plant Areas

  • All inspection of plant areas should be STRICTLY VISIBLE INSPECTIONS ONLY. Any obvious signs of damage or wear should be reported to a competent engineer who can then investigate further.

    Asbestos:
    - whilst all precaution has been taken to manage and label all asbestos in the workspaces, you should always be diligent when inspecting plant areas.
    - Do NOT touch plant.
    - Do NOT disturb any surfaces, including walls and old pipe lagging.

    Machinery and plant:
    - Do NOT touch plant, nor interfere with any electronic or mechanical controls
    - Do NOT move beyond the safe, marked and guarded, areas when inspecting moving machinery such as lift plant areas.

  • Tick to add detail of Boiler Room inspection

  • Access secure with warning / information signage in place?

  • General condition

  • All lagging in visibly good condition?

  • Plant item checked
  • Scan code of plant checked

  • Description of plant item checked

  • General visual condition of equipment

  • Tick to add detail of Water Tank Room inspection

  • Access secure with warning / information signage in place?

  • General condition

  • Up to date water hygiene log book present?

  • Plant item checked
  • Scan code of plant checked

  • Description of plant item checked

  • General visual condition of equipment

  • Tick to add detail of Lift Motor Room inspection

  • Access secure with warning / information signage in place?

  • General condition

  • All machinery guards in place and visibly secure?

  • Plant item checked
  • Scan code of plant checked

  • Description of plant item checked

  • General visual condition of equipment

  • Add plant area
  • Area / Description of room

  • Condition

  • Plant item checked
  • Scan code of plant checked

  • Description of plant item checked

  • General visual condition of equipment

Roof

  • Tick to add detail of roof inspection

  • Access secure with warning / information signage in place?

  • Strict operation of fall arrest system evident?

  • 'Safe' walkways clearly demarcated?

  • Edge protection in visibly good condition?

  • Fragile surfaces clearly marked?

  • Adequate lighting and way-finding?

  • Adequate emergency warning information (signage, sounded, beacons etc.)?

  • General condition

Hazards noted arising from tenant behaviour / visible within tenant demise

  • Tick to add hazard

  • Area / location

  • Condition

  • Another Location
  • Area / location

  • Condition

Hazards relating to Neighbouring property / shared areas

  • Tick to add area inspected

  • Area / location

  • Condition

  • Another Location
  • Area / location

  • Condition

Section 2 - Fire door checks

  • Guidance about fire door checks

    A fire door is defined as a door or shutter, together with it's frame and furniture, provided for the passage of people, air or goods which when closed is intended to restrict the passage of fire and/or smoke to a predictable level of performance.
    BS9999 recommends at least 6 monthly inspections of fire doors in the building. During the inspection specific components should be reviewed, including:
    - Door leaf
    - Door Frame
    - Door closer (self closing devices)
    - Hinges
    - Intumescent door strip and cold smoke seals
    - Glazing (vision panels)
    - Lock and levers/handles
    - Fire safety signage
    - Hold open devices
    - Gaps around the doors and threshold gaps
    - Panic hardware devices for external final fire exit doors

  • Tick to add door inspection

  • Door location / identifier

  • Door in good condition with no visible holes / damage?

  • Frame in good condition with no visible holes / damage?

  • Intumescent and smoke seals in good condition?

  • Door closes completely and unaided?

  • Gaps between door and frame ( or between double doors) is acceptable?

  • Add a photograph of door assessed (photographs of damage / faults should be added against the relevant question)

  • Additional door
  • Door location / identifier

  • Door in good condition with no visible holes / damage?

  • Frame in good condition with no visible holes / damage?

  • Intumescent and smoke seals in good condition?

  • Door closes completely and unaided?

  • Gaps between door and frame ( or between double doors) is acceptable?

  • Add a photograph of door assessed (photographs of damage / faults should be added against the relevant question)

Section 3 - Management system information

Checks by housekeeper / building manager

  • Is it evident that security / property checks are being carried out?

  • Is it evident that fire suppression system operation checks are being carried out?

  • Are the lift alarm / phones being checked weekly?

  • Are final exit door checks being carried out?

Site documentation / procedure

  • You should confirm that the information referred to in this section is up to date and appropriately displayed or communicated.
    Generally it is expected that the documents will be available on site. This, and their use, should be confirmed during the inspection.
    Where items are not readily available on site but are communicated through other means there must be positive evidence of this.
    If an item is not applicable, this should be explained in notes.

  • Is there a Housekeeper living on site or a Building Manager permanently based on site?

  • Current employer's liability insurance certificate in place with Housekeeper or Building Manager?

  • Fire emergency information available and up to date

  • Vital building information and emergency contact form in place and up to date? (Copy must be present at manned sites)

  • Risk register in place and includes all significant hazards?

  • Property hazard form available and up to date?

  • Asbestos register and management plan available and up to date?

  • Risk assessments for all on site staff activity sufficient and in place?

  • First aid kit readily available and fully stocked?

  • All site accidents reported on central online portal?

Section 4 - Quarterly tasks

  • Select the question set for the current quarter.
    Each question set examines a different high risk area relevant to our core management obligations.
    You should, wherever possible conduct the inspection with relevant contractors, arranging their attendance in advance.
    For each question you should seek positive and specific evidence. If documentation is not available on site, you should confirm it exists remotely. This may be subsequent to the site visit. Notes should be used to indicate where offsite documents are kept.

  • Quarter 1: Jan -Mar

Contractor audit - Engineering / Maintenance

  • Main contractor reviewed

  • Participants (contractor)

  • Are routine checks being carried out in plant areas

  • Are PPMs up to date

  • Are risk assessments available for all maintenance activities?

  • Is there evidence that operatives have received copies and understand the risk assessments / method statements?

  • Are training records up to date for all maintenance personnel?

  • Is there adequate evidence of control and monitoring of subcontractors?

  • Are sign in / out and processes being followed?

  • Is a sufficient permit to work process being implemented and maintained?

  • Are sufficient critical spares available on site?

Topic focus - PPE

  • Is there a PPE register and is it up to date?

  • Is an adequate documented inspection regime for the PPE in place?

  • Is there sufficient evidence that PPE is being used correctly and is effective?

  • Has appropriate training /information about the use of PPE been made available?

Topic focus - Electrical safety

  • Is a suitable fixed wiring test program in place and up to date?

  • Have all P1 and P2 recommendations been completed or instructed?

  • Is proof of competency (NECEIC or equivalent) available for all electrical contractors?

  • Is access to electrical risers and switch rooms adequately secure?

  • Is there adequate evidence of control of electrical works (PTW / isolation procedures etc.)?

  • Is a suitable PAT and labelling program in place?

  • Are all on site staff aware of the checks that should be carried out before using portable electrical equipment?

Topic focus - mobile / Portable work equipment (towers, lifting equipment etc)

  • List the equipment identified on site.

  • Is there an adequate inspection and maintenance program in place for all equipment?

  • Is there sufficient evidence that the maintenance inspection regime is effective?

  • Are risk assessments and method statements available for the use of all equipment?

  • Is there evidence that operatives have received copies and understand the risk assessments / method statements?

  • Are operating instructions / procedures available for all equipment?

  • Are the storage arrangements for equipment and accessories acceptable?

  • Have PPE requirements been identified and implemented?

Topic focus - mobile / Portable work equipment (towers, lifting equipment etc)

  • Is there an adequate inspection and maintenance program in place

  • Is there sufficient evidence that the maintenance inspection regime is effective

  • Are risk assessments and method statements available for the use of all equipment

  • Is there evidence that operatives have received copies and understand the risk assessments / method statements?

  • Are operating instructions / procedures available for all equipment

  • Are the storage arrangements for equipment and accessories acceptable

  • Have PPE requirements been identified and implemented?

  • Quarter 2: Apr - Jun

Contractor audit - Security

  • Main contractor reviewed

  • Participants (contractor)

  • Are site assignment instructions in place and up to date?

  • Is an activity log maintained and up to date?

  • Can on site-staff demonstrate sufficient awareness of sign in / out procedures?

  • Can on site-staff demonstrate sufficient awareness of contractor control and permit to work procedures?

  • Can on-site staff demonstrate sufficient awareness of emergency procedures?

  • Are all officers displaying their SIA licence?

  • Are daily walk rounds being completed and logged?

Topic focus - Fire

  • Are all maintenance records up to date?

  • Is the operations manual and emergency information up to date?

  • Are there any unauthorised system isolations or excessive isolations?

  • Are any current system faults known and being addressed?

  • Is there a suitable fire door inspection program in place with records available?<br>(All doors should be assessed 12 monthly, not including fire risk assessment)

  • Is there a currently fire risk assessment with all actions addressed or in progress?

  • Have any significant changes occurred which may require a revision to the fire risk assessment?

  • Have copies of tenant fire risk assessments been provided and are they up to date?

Topic focus - Training

  • Have the training requirements for all site activities been identified?

  • Are training records for all Promise site staff available and up to date (inc. FM / BM)?

  • Are records of contractor training available and up to date?

  • Quarter 3: Jul - Sep

Topic Focus - Water hygiene

  • Is there a current legionella risk assessment and are all actions complete or in progress?

  • Are all daily / weekly checks giving results within acceptable parameters?

  • Have monthly / quarterly water samples been taken and results acted upon?

  • If results are unsatisfactory, has action been taken to resolve this?

  • If results have been unsatisfactory have trends been examined for underlying problems?

  • Are cooling towers in good visible condition?

  • Are water features in good visible condition?

  • Is the management responsibilities information up to date?

  • Are all training records on file and up to date?

  • Have any significant changes occurred which may require a revision to the legionella risk assessment?

  • Has the annual management review been completed?

Topic focus - COSHH

  • Are there adequate, secure storage arrangements for all chemicals?

  • Are spill kits provided at suitable locations and all full / in date?

  • Is appropriate PPE available?

  • Are current safety data sheets and risk assessments readily accessible for all chemicals present?

  • Is there evidence that operatives have received copies and understand the risk assessments / method statements?

  • Is there sufficient evidence that COSHH assessments are being followed?

  • Are training records available for all relevant staff?

Topic focus - Asbestos

  • Has the potential or presence of asbestos been confirmed (minimum management survey of common areas in property built pre 2000)?

  • Are responsibilities for managing ACMs defined ( KF and tenant)?

  • Is an asbestos register available and communicated to contractors?

  • Is an annual re-inspection carried out (If required)?

  • Are any ACMs currently showing signs of damage / need of repair?

  • Quarter 4: Oct - Dec

Contractor Audit - Cleaning

  • Main contractor reviewed

  • Participants (contractor)

  • Are risk assessments for all activities in place?

  • Is there evidence that operatives have received copies and understand the risk assessments / method statements?

  • Have emergency procedures been communicated to all cleaning staff

  • Are storage areas tidy and secure?

  • Are chemical storage arrangements acceptable and MSDS available on site?

  • Is there adequate control of cleaning chemicals on site?

  • Is there evidence of control of slip / trip risks?

  • Are standards of cleaning generally acceptable?

  • Are catering facilities adequately cleaned ( inc. extract ducts and deep cleans)?

Contractor audit - Window cleaning

  • Main contractor reviewed

  • Participants (contractor)

  • Are suitable risk assessments and method statements available on site?

  • Is there evidence that operatives have received copies and understand the risk assessments / method statements?

  • Are emergency rescue plans available on site for all work at height?

  • Are training records up to date for use of work equipment (cradles etc.)?

  • Is the general standard of cleaning acceptable?

Topic focus - Work at height

  • Is there an adequate maintenance and inspection regime for all work at height equipment and accessories (cradles, fall arrest, eye bolts etc)?

  • Does all equipment have a current valid thorough examination certificate?

  • Are training records for operatives available, and up to date?

  • Are suitable risk assessments and method statements available for all associated works?

  • Is there evidence that operatives have received copies and understand the risk assessments / method statements?

  • Is a sufficient permit to work process being implemented and maintained?

  • Is there evidence that safe systems of work are being followed in full?

  • Are emergency rescue plans available on site for all work at height?

  • Is there evidence that operatives have received training and understand their role in emergency rescue?

  • Is there a suitable maintenance and inspection regime for all site ladders ( fixed and portable)?

  • Are storage arrangements for ladders adequate Inc. security to prevent unauthorised use?

Topic focus - Waste

  • Are carriers licences available and up to date?

  • Are all waste transfer notes retained and available?

  • Is there adequate segregation of hazardous waste?

  • Is there an adequate maintenance and inspection regime for compactors / bailers?

  • Are operating instructions for any compactors / bailers clearly displayed?

  • Are there adequate arrangements to prevent misuse of compactors / bailers?

  • Is waste adequately stored and controlled to prevent fire risks or vermin?

Section 5 - Meter readings

Electricity meter readings

  • Meter number

  • Location / Tenant

  • Meter reading

  • Add photo of meter

  • Additional meter
  • Meter number

  • Meter reading

  • Add photo of meter

Gas meter readings

  • Meter number

  • Location / Tenant

  • Meter reading

  • Add photo of meter

  • Additional meter
  • Meter number

  • Meter reading

  • Add photo of meter

Water meter readings

  • Meter number

  • Location / Tenant

  • Meter reading

  • Add photo of meter

  • Additional meter
  • Meter number

  • Location / Tenant

  • Meter reading

  • Add photo of meter

Section 6 - Additional findings

Additional findings / hazards

    Add additional findings / actions
  • Area / location

  • Description of hazard

  • Action required and priority

Comments

  • General comments

  • Onsite staff comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.