Level I Verification
-
Visual Inspection of Unit for Fit and Finish of Installation
-
Is there damage to the unit? If Yes, provide pictures of damage
Level II Verification
-
Unit Placed per drawings
-
Unit Leveled
-
Verify Chemical Lines, Probe wires and Probes are installed and routed in an efficient manner and dressed up
Inspect Panels, Trim and enclosure installation for completeness, fit, and finish
-
All components installed properly
-
Airlines installed, properly routed, and dressed up
-
All wiring complete and dressed up
-
Spray arms, track installed and adjusted, cart guides and stops installed
Utility connections are completed and routed in an efficient manner
-
Electrical
-
Drain
-
Hot Water
-
Steam
-
Condensate
-
PRV Piping (electric Unit Only)
Level III Verification
-
While unit is in operation, verify no leaks
-
Verify unit is drying properly at end of cycle
-
Record with Pictures Chemical Manufacturer
-
Confirm with Customer that customer cycles are added
-
Verify displays are properly alligned
-
conduct final E-Stop test
-
Record Unit cycle count
-
Record any additional outstanding issues
Inspection Sign Off
-
Add any general inspection comments
-
Signature