Title Page
-
Location
-
Conducted on
-
Prepared by
Level I Verification
-
Visual Inspection of Unit for Fit and Finish of Installation
-
Take Photos from multiple angels on both load and unload side
-
Is there damage to the unit? If Yes, provide pictures of damage
-
Assign responsible person to follow up and repair/replace damaged components
Level II Verification
-
Unit(s) Placed per drawings
-
Unit(s) Leveled
-
Seismic Anchoring executed as required
Utilities
-
Verify Cold water connected and routed Properly
-
Verify DI Water connected and routed properly
-
Verify electrical connection is correct and power cord is routed properly
-
Verify drains are plumbed and properly positioned to ensure water does not splash out of the floor sink
-
Verify Steam Connection and Condensate
-
Ensure Chemical Lines are installed (3 Lines)
Level III Verification
-
While Unit(s) is in operation, verify no leaks
-
Test Steam Bypass Function
Inspection Sign Off
-
Add any general inspection comments
-
Signature (provide First Name, Last Name, Position