Title Page
-
Location
-
Conducted on
-
Prepared by
Level I Verification
-
Visual Inspection of Unit for Fit and Finish of Installation
-
Take Photos from multiple angels on both load and unload side
-
Is there damage to the unit? If Yes, provide pictures of damage
-
Assign responsible person to follow up and repair/replace damaged components
Level II Verification
-
Unit(s) Placed per drawings
-
Unit(s) Leveled
-
Unit Anchoring executed as required
Utilities
-
Verify electrical connection is correct and power cord is routed properly
-
Verify Manual Disconnect
Inspect Panels, Trim and enclosure installation for completeness, fit, and finish
-
All components installed properly
-
All Panels and Trim installed
Automation
-
Unit(s) Leveled
-
Verify Alignment
-
Wheel Guides installed
-
All grounds between conveyor sections are connected
-
Ensure Foot Pedal/Remote Open Button Install and operational
Level III Verification
-
Observe operation of door(s) for smooth operation
-
Conduct Final e-stop test
Automated Units
-
Verify proper operation of automation
-
Conduct final e-stop test
-
Confirm Racks load and Unload Properly
Inspection Sign Off
-
Add any general inspection comments
-
Signature (provide First Name, Last Name, Position