Title Page
-
Location
-
Conducted on
-
Prepared by
Level I Verification
-
Visual Inspection of Unit for Fit and Finish of Installation
-
Take Photos from multiple angels on both load and unload side
-
Is there damage to the unit? If Yes, provide pictures of damage
-
Assign responsible person to follow up and repair/replace damaged components
-
Level II Verification
-
Unit(s) Placed per drawings
-
Unit(s) Leveled
-
Seismic Anchoring executed as required
-
Inspect door(s) for proper alighment, no binding during open or close, Latch adjusted
Utilities
-
Verify Cold water connected and routed Properly
-
Verify Hot Water connected and routed properly
-
Verify DI Water connected and routed properly (Electric Unit Only)
-
Verify electrical connection is correct and power cord is routed properly
-
Verify Manual Disconnect for non-plug units
-
Verify drain is plumbed and properly positioned to ensure water does not splash out of the floor sink
-
Verify Steam Connection and Condensate
-
Ensure Exhaust is connected properly
-
Ensure Chemical Lines are installed (3 Lines)
Inspect Panels, Trim and enclosure installation for completeness, fit, and finish
-
All components installed properly
-
All Panels and Trim installed
Automation
-
Unit(s) Leveled
-
Verify Alignment
-
Wheel Guides installed
-
All grounds between conveyor sections are connected
-
Ensure Control Panel is mounted and operating properly
Level III Verification
-
Observe operation of door(s) for smooth operation
-
While Unit(s) is in operation, verify no leaks
-
Confirm no foaming
-
Confirm with Customer that customer cycles are added
-
Conduct Final e-stop test
-
Verify Printer Operation (Units with printer option)
-
Record Unit cycle count
Automated Units
-
Verify proper operation of automation
-
Conduct final e-stop test
-
Confirm Racks load and Unload Properly
Inspection Sign Off
-
Add any general inspection comments
-
Signature (provide First Name, Last Name, Position