Information
-
Document No. CVL2-OH-FRM-O14
-
Conducted on
-
Prepared by
-
Location
1. Office & Ammenities
LPI ELEMENT 1 - OFFICE AND AMMENITIES
-
Date and Time
-
Area Inspected
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
1. Safety Notice Boards in offices and crib huts and Safety Policy posted in each crib, office or meeting room
-
2. Appointed persons names/photos displayed (i.e. Safety Reps, First Aid attendants
-
3. Fire extinguishers available and correctly identified. <br>Fire extinguishers in service
-
4. Access to fire extinguishers unobstructed?
-
5. Entry and Exit clearly marked
-
6. Access and egress unobstructed?
-
7. Materials stored correctly
-
8. Emergency exit signs installed and working
-
9. Bins provided and regularly emptied? (Include recycle bins)
-
10. Kitchen are clean and tidy
-
11. Electrical equipment in good working order with current inspection tag
-
12. Toilets clean and tidy, hand wash, soap, paper towel
-
13. Tops of cabinets or shelves beside access ways clear of items that may fall
-
14. Waste segregation measures in place and containers labelled
-
15. Appropriate bunding of hazardous materials stored
-
16. Any designated smoking area at least 10m from any opening, door, window
2. First Aid & Facilities
LPI ELEMENT 2 - FIRST AID AND FACILITIES
-
Date and Time of Inspection
-
Area Inspected
-
Name and Signature of Inspector
-
Name and Signature of Inspector
-
Name and Signature of Inspector
-
Name and Signature of Inspector
-
1. Current first aid equipment list in cabinet
-
2. Contents within use by dates
-
3. Emergency Procedures / phone numbers displayed
-
4. Treatments register at facility
-
5. Adequate certified first aid personnel available for all shifts
-
6. Facility easily identified
-
7. Certified first aid personnel display a green cross on hard hat?
-
8. Equipment stored correctly
-
9. Medical waste disposed of correctly
-
Facility clean and tidy
-
11. Current Inspection tag on electrical equipment
-
12. Are portable eye wash units available at each workfront.
3. Workshop
LPI ELEMENT 3 - WORKSHOP
-
Inspection Date & Time
-
Area Inspected
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
1. Work areas tidy
-
2. Regular disposal of waste
-
3. Walkways unobstructed
-
4. Adequate lighting for work being carried out
-
5. Sharp objects covered / protected
-
6. Fire extinguishers identified, checked, unobstructed
-
7. RCDs on all electrical equipment
-
8. Current inspection tag on all electrical equipment
-
9. Tools and Equipment stored correctly
-
10. Guarding fitted to equipment
-
11. Sparks contained / welding screens used
-
12. PPE correct for task
-
13. Materials stored correctly
-
14. Tools and equipment correct for task
-
15. Additional PPE available
-
16. Spill kits available
-
17. Eye wash station (or equivalent) readily available and serviceable?
4. Housekeeping, Access/Egress
LPI ELEMENT 4 - HOUSEKEEPING, ACCESS/EGRESS
-
Date and Time
-
Area Inspected
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
1. Materials stacked safely and correctly
-
2. Laydown areas clean and tidy
-
3. Signage erected to identify hazardous storage / disposal areea
-
4. Signs and barricading erected and maintained around hazard areas
-
5. Solid barricading erected around potential fall areas
-
6. Barricading complies with site requirements (i.e. Hard barricading where required).-
-
7. Sharp objects capped (e.g. star pickets and reobar)
-
8. High housekeeping standards maintained
-
9. Bin locations prominent, adequate and emptied regularly
-
10. Waste segregation measures in place and containers labelled
-
11. Access and egress points clear of obstruction
-
12. Access to elevated work areas complies with site requirements
-
13. Handrails installed on ramps and stairs (and where required)
-
14. Sharp edges are covered on walkways/access ways
-
15. Ladders are secured. 1 to 4 metre lean, ladder projects 1 metre above the platform
5. Fall Prevention
LPI 5 - FALL PREVENTION GMR 5 Working at Height - To prevent people and objects falling from height
-
Date and Time
-
Area
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
1. All fall prevention equipment recorded on register.
-
2. Current quarterly inspection tag fitted to all fall prevention equipment
-
3. Equipment is in sound condition with no visible damage
-
4. Range of equipment available is adequate for the work scope/s and is set up correctly
-
5. Equipment inspected prior to use by competent/experienced person
-
6. TRA's specific for high fall potential activity (i.e. written for specific task) - Note: Refer GMR 5
-
7. Grid mesh permits in use for grid mesh removal and reinstallation
-
8. Personnel comply with safety requirements
-
9. Personnel trained and competent in use of all equipment
-
10. Fall arrest systems installed by competent person
-
11. Anchor point/s comply with safety requirements
-
12. Safety harness/es stored correctly when not used
-
13. Safety harness fitted correctly to personnel
-
14. Fall arrest / restraints for all works > 2m
-
15. Step ladders maximum height 1.8m
6. Lifting Operations
LPI ELEMENT 6 - LIFTING OPERATIONS GMR 3. Lifting Operations - To prevent harm to people from the risks associated with lifting operations
-
Date & Time
-
Area
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
1. All lifting equipment is recorded on a register
-
2. SWL marked on all lifting equipment
-
3. Current quarterly inspection tag or colour displayed<br>(GMR 3.4 Cranes and lifting appliances must be regularly inspected, certified, tested and maintained, and comply with current Australian Standards)
-
4. Equipment stored correctly
-
5. Daily pre-start inspections and/or function tests must be completed for cranes and lifting appliances. Where defects are identified, equipment must be immediately tagged out of service. (GMR3.8)
-
6. Slings adequately protected i.e. packing
-
7. Tag lines used on all loads (16mm natural fibre rope)
-
8. Lifting equipment used correctly
-
9. TRA's and start cards reflect tasks, are current and have been reviewed by Safety
-
10. Person(s) authorised and competent to use equipment (GMR3.7)<br>(GMR 3.2 All lifts must be planned and managed by a competent person in accordance with the JHG Lift Planning Matrix)
-
11. PPE is correct for the task
-
12. Materials to be lifted have been correctly stored
-
13. Round soft slings not used as head slings or temporary support of pipes etc
-
14. Round soft slings not used for lifting other than pipework
-
15. Exclusion zones (where applicable) are adequate<br>(GMR 3.10: Physical barriers and/or other suitable controls must be used to exclude unauthorised persons from lifting operations. No loads must be lifted or suspended over people)
7. Cranes
LPI ELEMENT 7 - CRANES GMR 3 Lifting Operations - To prevent harm to people from the risks associated with lifting operations
-
PLANT ID NUMBER:
-
SITE LOCATION:
-
Date and Time
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
1. Exclusion zone erected around slew area
-
2. Outriggers fully extended on timber support
-
3. Adequate ground bearing support / level surface clear of excavations
-
4. Daily checklist completed / Safety devices checked
-
5. Crane Operators / Riggers communication methods clear
-
6. Precautions for lifting overhead in place and known
-
7. Daily inspection / maintenance log books completed by operator
-
8. Operators manual in cab
-
9. Lift log and/or evaluation completed by operator
-
10. Chains removed / secured when travelling
-
11. Rigger / dogman carrying out spotters duties as required e.g. interface with moving load and personnel
-
12. Man cage permit in place and complied with
-
13. Spill kit in or near crane
-
14. Dust mitigation in area
8. Scaffolding
LPI ELEMENT 8 - SCAFFOLDING
-
Date and Time
-
Area Inspected
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
1. Scaftag fitted at all access points and clearly visible
-
2. Access built to requirements
-
3. Scaffold within the 30 day inspection period
-
4. Competent and authorised person erecting/modifying/dismantling scaffold
-
5. Where erecting, modifying
-
-
-
-
-
-
-
-
-
-
9. Electrical Equipment
LPI ELEMENT 9 - ELECTRICAL EQUIPMENT GMR 4. Electrical Safety - to ensure that people are protected from the risk of electric shock
-
Date & Time
-
Area
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
1. Leads elevated above ground level on non-conductive support or material
-
2. Lead stands covered in non-conductive material<br>
-
3. Leads are NOT obstructing access and egress ways
-
4. Are lead plugs in sound condition
-
5. Leads not secured or tied off directly to scaffolding or handrails
-
6. Are all connection and plugs clean and fitting correctly
-
7. Are handles and guards fitted in good condition (e.g. grinders and drills)
-
8. Are the correct disks for the job being used (i.e. grinding disk for grinding and cutting disk for cuttiing)
-
9. Current quarterly inspection tags fitted to all electrical equipnment
-
10. 240v leads do not exceed 30m
-
11. Double adaptors/ Piggy back leads not used
-
12. Are electrical hand tools, machines and leads stored correctly when not in use
-
13. Temporary power boxes located clear of hazards and obstructions
-
14. Are switchboards correctly labelled
-
15. Are RCD`s tested and operational
10. Mobile Plant
LPI ELEMENT 10 - MOBILE PLANT GMR 1 Traffic, Plant and People - To prevent injury caused by the use of mobile plant and vehicles
-
Date and Time
-
Area
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
1. Daily Prestart Inspection (on checklist form) completed by operator
-
2. Faults identified and signed off
-
3. Operator competencies verified , Register current (reviewed quarterly)
-
4. Safety devices fitted and operational - seatbelts, fire extinguisher, reverse alarms, machine guards, brakes
-
5. SWL (Safe Working Load) charts in place and legible
-
6. Vehicles and trucks maintained to manufacturers specifications
-
7. Operators manual on site and available to operator
-
8. Mobile plant being used correctly e.g. use of spotters, not overloaded
-
9. Flashing light (beacon) operational
-
10. Motion alarms fitted and operational
-
11. Mobile plant not blocking access ways
-
12. Spill kit available
-
13. Dust mitigation in area
-
14. Is effective verbal (UHF) communication being used, not just visual cues
-
15. Is there adequate lighting to conduct the task safely?
-
16. Is vehicle authorised to be on the site. Identification decals legible
11. Employee Conduct
LPI ELEMENT 11 - EMPLOYEE CONDUCT
-
Date & Time
-
Area
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
** HAS START CARD BEEN COMPLETED? HAS IT BEEN COMPLETED CORRECTLY
-
1. Employee authorised and qualified to operate the equipment?
-
2. Workplace/site speed limits complied with?
-
3. No throwing / dropping tools, equip, material waste
-
4. Working in compliance with site safety requirements
-
5. Tools being used are right for the job
-
6. Tools are being used correctly
-
7. Individual job planning evident
-
8. Adequate PLUS minimum mandatory PPE for the task is utilised
-
9. Positive Supervisor response to rectifications
-
10. Employee exposed to overexertion
-
11. Eliminate exposure to falling objects
-
12. Eliminate exposure to falling (also see LPI 5 )
-
13. Eliminate exposure to being caught between items/objects
-
14. Eliminate exposure to being struck by object
12. TRA`s and Start Cards
LPI ELEMENT 12 - TRA`S AND START CARDS
-
Date & Time
-
Area
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
1. Start card completed suitably for the task by each team member
-
2. Start Card correctly lists date, task specified and hazards
-
3. Is there a TRA available for the task being carried out
-
4. Is the TRA authorised by the relevant supervisor and HS ?
-
5. Is the TRA immediately accessible
-
6. Is the TRA registered with HS? Is there an Initial Review (JHTC-OH-FRM-122)
-
7. Does the TRA reflect the current job steps?
-
8. Are the hazards correctly identified with the correct controls?
-
9. Was the work group involved in the development of the TRA
-
10. TRA Review - Has the TRA been reviewed and signed by all off the crew? Have any revisions been registered with HS?
-
11. Are TRA`s being re-signed by work crew at each review
-
12. Are controls adequate and in place
-
13. Is the TRA Current
-
14. Does the TRA link to other documentation? Is that attached
-
15. Is there a weatherproof workpack or information box that contains permits, TRA`s etc
20. Electrical Isolations
LPI ELEMENT 20 - ELECTRICAL ISOLATIONS GMR 4. Electrical Safety - To ensure that people are protected from the risk of electrical shock. GMR 8. Isolation - To prevent harm caused by exposure to energy sources.
-
Date & Time
-
Area
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
1. A test for zero energy has been conducted by Competent and Verified person/s prior to commencing works (GMR8.3)
-
2. Retests for zero energy conducted following and break or change in conditions (GMR8.6)
-
3. Working on live conductors assessed bas the only practicable solution and approved by the Client (JKC)
-
4. Minimum of 2 persons when working on live exposed conductors
-
5. All isolation points must be clearly identified, proven, tagged and controlled to prevent inadvertent energising. (GMR8.4)
-
6. Isolations are identified on System Schematic
-
7. Isolations locked and tagged (GMR8.4)
-
8. Persons undertaking Electrical work have been assessed and are competent and authorised to carry out the work
-
9. An isolation list is in place at the work site
-
10. Isolation authorities have been authorised by the client (JKC)
-
11. De-isolations are conducted by competent and authorised person/s
-
12. Personnel are aware that where changes to work practices have been identified, work is to cease, the Supervisor is to be notified and changes are to be recorded in TRA`s and work crews informed
26. Barricading
LPI ELEMENT 26 - BARRICADING
-
Date & Time
-
Area
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
Name and Signature
-
1. Soft/Hard/Rigid barricading maintained to a high standard. i.e. taught and level position, hard barricade ledgers placed end to end. - Specify type of barricading in comments section
-
2. Orange Flagging - General site delineation such as lay down area within an established work area
-
3. Earthen Bunding - no greater than 1 metre from the edge of the hazard/excavation
-
4. Barricading for Working at Height - Prevention of dropped objects
-
5. Barricade requirements for specific work activities: <br>Crane safety, Vehicle / pedestrian protection, scaffolding, steel erection and rigging, EWP`s, excavations, openings in flooring / gridmesh, pneumatic testing
-
6. Signage - appropriate signage communicating Hazard and Activity
-
7. Information Tags - provided on all facets of the barricading, and fully completed
-
8. Designated Access Points - Sign "Designated Access Point - Authorised Entry Only"
Actions required
Actions required. Note any corrective action request (CAR) to be raised in OMS / JHET
-
Audit item number.
-