Title Page
-
Site conducted
-
CVSG PM EL10 - Generator Maintenance
PM EL10 - Generator System
PM EL10 - GEN
Location
-
Date
-
Facility?
- POB - Port of Brisbane
- GCPH - Gold Coast Private Hospital
- QCH - Queensland Children's Hospital
- Scentre - Westfield Shopping Centre
- Ventia - State School
- CVSG - CV Services Group
- GCUH - Gold Coast University Hospital
- TDS - Tweed Day Surgery
- QPU - Queensland Police Union
- BAC01 - Brisbane Airport - ITB
- BAC02 - Brisbane Airport - DTB
- BACZZ - Brisbane Airport - Other
- MACG - McKenzie Aged Care Facility
- SCUH - Sunshine Coast University Hospital
- Other
-
QCH Facility
- QCH - Main Hospital
- CCHR - Children's Centre Health Research
- CHEP - Central Health Energy Plant
- FDN - Foundation Building
-
Scentre Westfield - Facility?
- Coomera
- North Lakes
- Carindale
- Chermside
- Chermside CHO & ATO
- Helensvale
- Garden City
- Other
-
Ventia State School - Facility?
- Coomera State School
- Murrumba State School
- Augusta State School
- Peregian State School
- Brightwater State School
- Bayview State School
- Woodlinks State School
-
Building Name and Number or Room Name?
-
Name of tradesperson
-
Job Number
-
Discipline?
-
Preventative Maintenance (PM) Inspection Type
Asset
-
Asset Particulars
-
Asset ID Number?
-
Asset Description?
-
Genset Rating in kVA (whole number only)?
-
Component?
- Lighting
- Solar
- Switchboard
- Generator
- Fire Systems
- HVAC
- Transformer
-
Equipment?
- Emergency Lighting
- Internal Lighting
- External Lighting
- Solar Panels
- Inverters
- SWB - Essential
- SWB - Non-Essential
- SWB - Both Essential and Non-Essential
- UPS
- PFC
- MSSB
- Meters
- Generator
- Gen Controls
- Gen Fuel Storage
- Oil Type TF
- Dry Type TF
-
How many general light fittings per floor/sub-circuit?
-
How many external light fittings per floor/sub-circuit
-
How many panels per solar array?
-
How many meters per panel?
-
Manufacturer? (Enter CUSTOM for customised manufacture)
-
Model?
-
Serial Number?
-
Year asset/equipment was installed (approximate)?
Asset Inspection
-
Disconnect Battery
Battery Testing
-
Battery date of install?
-
Check battery connections
- P6 - Excellent (No Priority - monitor >10 years)
- P5 - Good (Low Priority - monitor >4 years)
- P4 - Fair (Medium Priority - Consider action 2-4 years)
- P3 - Poor (High Priority - Consider action 1-2 years)
- P2 - Very Poor (Urgent - Consider action 0-12 months)
- P1 - Dangerous (Emergency - Consider action 48hrs/0-6 months)
- Not Applicable
-
What is required for repair/replacement?
-
Battery Voltage (V - Volts)
-
Battery Charger (V-Volts)
-
Specific Gravity of Battery (Value should be between 1.28 to 1.30 for a fully charged battery)
- Pass - Greater than or equal to 1.28 (100% Charged)
- Fail - Equal to or less than 1.2 (<70% Charged)
- NA - Not Applicable
-
Distilled water added prior to charging? (Approx. mL)
-
Battery Water Levels (check the water level is approx. 12mm above plates)
-
Distilled water added? (Approx. mL)
Fluids & Levels
-
Check Oil level
-
Oil added? (Approx. mL)
-
Check Water level
-
Water added? (Approx mL)
-
Check Fuel level
-
Fuel added? (Approx L)
-
Are there any oil leaks?
-
What is required for repair/replacement?
-
Are there any water leaks?
-
What is required for repair/replacement?
-
Are there any fuel leaks?
-
What is required for repair/replacement?
-
Check the condition of exhaust drains
- P6 - Excellent (No Priority - monitor >10 years)
- P5 - Good (Low Priority - monitor >4 years)
- P4 - Fair (Medium Priority - Consider action 2-4 years)
- P3 - Poor (High Priority - Consider action 1-2 years)
- P2 - Very Poor (Urgent - Consider action 0-12 months)
- P1 - Dangerous (Emergency - Consider action 48hrs/0-6 months)
- Not Applicable
-
What is required for repair/replacement?
-
Check the condition of air filter
- P6 - Excellent (No Priority - monitor >10 years)
- P5 - Good (Low Priority - monitor >4 years)
- P4 - Fair (Medium Priority - Consider action 2-4 years)
- P3 - Poor (High Priority - Consider action 1-2 years)
- P2 - Very Poor (Urgent - Consider action 0-12 months)
- P1 - Dangerous (Emergency - Consider action 48hrs/0-6 months)
- Not Applicable
-
What is required for repair/replacement?
Cleaning
-
Engine cleaned?
-
Battery terminals cleaned?
-
Drip tray cleaned?
-
Battery reconnected?
Operation
-
Test ATS (building load)
-
ATS start time? (Seconds)
-
Test generator start (no load)
-
Generator run time? (minutes)
-
Frequency (Hz)
-
Voltage - L1 Volts (V)
-
Voltage - L2 Volts (V)
-
Voltage - L3 Volts (V)
-
Engine oil pressure (kPA)
-
Engine Temperature (°C)
-
Engine Vibration
-
Engine Noise
-
Engine Hours (hours & minutes)
Final Checks
-
System left in auto?
-
Re-check all caps?
-
Circuit breakers closed?
-
Generator and Genset system confirmed as returned to normal service?
-
Overall Condition Rating?
- P6 - Excellent (No Priority - monitor >10 years)
- P5 - Good (Low Priority - monitor >4 years)
- P4 - Fair (Medium Priority - Consider action 2-4 years)
- P3 - Poor (High Priority - Consider action 1-2 years)
- P2 - Very Poor (Urgent - Consider action 0-12 months)
- P1 - Dangerous (Emergency - Consider action 48hrs/0-6 months)
- Not Applicable
Repairs
-
Repairs and Repair Codes
-
Select Repair Code Where Applicable Needed for Repair/Replacement of Asset
- RL01 - Light fitting hanging down (LADDER - excluding supply of fitting)
- RL02 - Light fitting hanging down (EWP - excluding supply of fitting)
- RL03 - Broken switch 1-4Gang internal (BAKELITE, SGLE PHASE)
- RL04 - Broken switch 1Gang external (BAKELITE, SGLE PHASE)
- RL05 - Broken switch external IP56 (THREE PHASE)
- RL06 - Replace HiBay with 200W LED HiBay (Including supply of fitting)
- RG01 - Unterminated cable / Loose terminal cabling
- RG02 - Faulty single phase combination circuit breaker-RCD - after hours
- RG03 - Faulty single phase circuit breaker - after hours
- RG04 - Penetration not fire rated (no mastic of fire pillows etc.)
- RG05 - Dry fire isolation - normal hours
- RG06 - Dry fire isolation - after hours
- RG07 - Switchboard covers with dome hex nuts missing
- RG08 - Switchboard schedule missing
- RG09 - Replace 2-way DIN terminals (x3), in lieu of discovering 'hot-joint'
- RG10 - Install & refurbish pole fillers in distribution section
- RP01 - Broken outlet, internal (BAKELITE, SGLE PHASE)
- RP02 - Broken outlet, external (BAKELITE, SGLE PHASE)
- RP03 - Broken outlet, external IP56 (BAKELITE, THREE PHASE >20A)
- RP04 - Broken outlet, external IP56 (BAKELITE, SINGLE PHASE <20A)
- RP05 - Extension lead / appliance requires new plug SINGLE PHASE
- RP06 - Extension lead / appliance requires new plug THREE PHASE
- RE01 - Install link bars for cardiac protected area & test
- RE02 - Upgrade & install earthing (16mm - 6mm) for cardiac protected area & test
- RE03 - Upgrade earth protection in pendant arms with 6.0mm
- RE04 - Install clipsal hinged cover plates to each wall mounted RCD
- RS01 - Replace LV DB 250A or greater
- RS02 - Replace LV DB IP56, 250A or greater
- RS03 - Replace LV MSB IP56, 630A-800A
- RS04 - Replace LV MSB 1000A or greater
- RS05 - Replace LV MCCB
- RS06 - Replace LV ACB
- RS07 - Replace HV ISO/CB
- RS08 - Replace HV SF6 RMU
- RS09 - Replace HV DryAir RMU
- Other
-
Description of the defect with equipment/asset?
-
Work (labour and materials) needed to rectify defect?
-
Add the quantity of repair code(s) required
-
Rectification due by (year)?
-
Estimated budget replacement cost (whole number only - no 'k')?
-
Take additional photos as needed (Include photos of Generator nameplates where present)