Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Quality Checklist
Daily Quality Checklist
-
Cavities re set and correct
-
Overall cavity size checked and Ok
-
Walls plumb and level
-
Brickwork and Blockwork to Gauge
-
Snotts in cavity cleaned off and pointed (full fill )
-
Insulation installed correctly no gaps
-
All mortor joints filled
-
Brickwork top and tailed
-
Work Brushed off at right time not too early so avoiding mortar smears
-
Material waste in segregated skips
-
Saving and collecting in unused materials where necessary
-
Correct lintels installed with correct bearing
-
Levels at right height
-
Walls built accurately and to drawings
-
Setting out of windows and doors correct and accurate
-
Expansion joints installed inc foam and tie
-
DPC is in place and installed correctly
-
Ties installed correctly
-
Work area tidy
-
Any incorrect wrong work is identified and corrected
Signed off by:
-
CMR Signature:
-
Date: