Title Page

  • Site conducted

  • Conducted on

  • Location

Daily Coffee Machine Calibration

  • What is the coffee extraction time?

  • Coffee machine/ Coffee Grinder calibrated to 18gm of coffee

  • MANAGER/SUPERVISOR SIGN OFF

Tongs Hourly Cleaning Checklist

  • Wash and Sanitize Donuts Tongs 10am

  • Wash and Sanitize Donuts Tongs 11am

  • Wash and Sanitize Donuts Tongs 12pm

  • Wash and Sanitize Donuts Tongs 1pm

  • Wash and Sanitize Donuts Tongs 2pm

  • Wash and Sanitize Donuts Tongs 3pm

  • Wash and Sanitize Donuts Tongs 4pm

  • Wash and Sanitize Donuts Tongs 5pm

  • Wash and Sanitize Donuts Tongs 6pm

Retail Daily Cleaning Checklist

  • Date

  • All condiments in the coffee area to be stocked (cups, lids, toppings etc)

  • All coffee utensils to be handwashed including drain trays

  • Coffee machine, hot water machine and surrounding areas wiped down

  • Coffee machine put on clean, emptied, bin bag in tray and turned off when finished

  • Outside or Inside area. Clean tables, change bins, sweep floor

  • All counter tops, press doors, handles and shelves to be sanitized and wiped down

  • Carrier bags, donut bags and boxes all fully stocked for next day

  • Sweep area in front of the cabinet

  • Clean around milkshake station restock toppings

  • Clean all around the ice cream machine and clean drip tray

  • Sanitize all blender jugs

  • Bin emptied and bags changed. Leave fresh bins every morning

  • All bin covers/lids cleaned and sanitized

  • Coffee machine screens, till screen, just eat screens, cleaned with glass cleaner

  • Clean and sanitize around topping area and glass containers

  • Floor to be thoroughly swept and scraped in places if necessary, removing all dirt from corners and edges. Including behind bins or blocked areas

  • Floor to be mopped thoroughly until build up and stickiness is gone

  • Office floor, bathroom floor and kitchen floor to be swept and mopped

  • All racks washed in dishwasher. Three washes altogether

  • All utensils and tongs to be washed in dishwasher

  • Silver area scraped, cleaned with purple spray

  • Glass and screen cleaned until no marks are showing

  • All fridges and touch points cleaned

  • Everything removed from dishwasher, cleaned, drained, and rinsed out kitchen counters wiped

  • Comments / Action

  • MANAGER/SUPERVISOR SIGN OFF

Bakery Daily Cleaning Checklist

  • All containers clean

  • Floor swept and moped

  • All shelves cleaned and sanitized

  • Bain Marie containers clean and refilled for next day

  • All prep required for the next day done

  • Microwave inside/outside & door handle clean

  • Fridge inside/outside & door handle clean

  • All containers have shelf life lable

  • HACCP documents filled out

  • Topping Silicon paper re-stocked

  • Piping bags restocked

Weekly Thermometer Calibration Record

  • Date

  • *Place tip of thermometer probe into the steam from a boiling kettle of water and record reading (Should be between 99*c and 101*c)

  • 99*c and 101*c Boiling Water = Enter Measured temperature

  • *Place tip of thermometer probe into crushed ice and little cold water – leave for 5 minutes and then measure reading ( should be between -1*c and +1*c)

  • -1*c and 1*c Ice Water = Enter Measured temperature

  • Comments / Action

  • Manager/Supervisor Sign Off

Weekly Ice Cream Machine Cleaning Checklist

  • Date

  • Ice Cream Machine Deep Cleaned and Fully sanitized?

  • MANAGER/SUPERVISOR SIGN OFF

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.