Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Guidelines: - Must be completed every 3 months by area manager - A green audit is 90% or above! Amber is 75-89%. Red 74% or less - Red audits will result in a second audit within 4 weeks - Copy emailed to all managers on site - Action plan completed
Section 1: Documentation
-
Daily duty manager checklists being completed effectively
-
Daily fridge and freezer temperature checks being completed effectively
-
Daily kitchen cleaning checklists being completed effectively
-
Daily hot food checks being accurately completed
-
Weekly probe calibration checks being accurately completed
-
Weekly general manager spot checks being completed
-
Weekly cleaning checklist being completed accurately
-
Weekly food cooling checks being effectively completed
-
Weekly delivery checks being completed
-
All food handlers completed the food handlers questionnaire
-
Alleged food poisoning incidents correctly reported
-
Alleged foreign body incidents correctly reported
-
Maintenance log completed
-
Buffet checks completed if applicable
Section 2: food safety policies
-
COSSH manual in noticeboard
-
No unauthorised cleaning products being used
-
Recorded team member COSSH training
-
Any pest activity reported
-
Pest contractors manual available and regular visits being conducted
-
Personal hygiene rules being followed
-
Food bought from nominated suppliers only
-
Raw food stored below cooked foods
-
All food is in date
-
All food correctly labeled
-
Chopping boards in good condition and correct ones being used
-
In house frozen food given one month and labeled accordingly
-
All food is covered
-
All food is stored off the floor where possible
-
Fridge freezer seals are clean and not damaged
-
Condition of food storage containers is in good
-
No utensils left in food
-
Sanitizer used for surfaces and sides
-
Two probes are available and clean
-
Probe wipes are available
-
Protective clothing worn by team members and it is clean and in good condition
-
Wash basins stocked with liquid soap and hand drying facility
-
Hot water available
-
No glass being stored in the kitchen
-
Wet floor signage available
-
First aid kit stocked as per policy
-
Appropriate PPE available in the kitchen
-
Gas valve in kitchen not obstructed
Section 3: cleanliness
-
Kitchen floor is clean-debris not allowed to build up
-
Kitchen canopies and ceiling clean-dirt not allowed to build up
-
Kitchen equipment is in a clean condition (deduct 5 marks for each item not clean)
-
Team changing area clean and tidy
-
Bin areas clean and tidy
-
Area manager:
-
Duty manager: