Title Page
-
Document No.
-
Conducted on
-
Location
-
Check Conducted By
- Dev McGlaughlin
- Scott McGlaughlin
Production Report
Production Report
-
Well Site
-
Status
-
Explanation
Pressures
Tank Levels
-
Tank #1
-
Consistency
-
Inches
-
Barrels
-
Tank #2
-
Consistency
-
Inches
-
Barrels
-
Tank #3
-
Consistency
-
Inches
-
Barrels
-
Notes
-
Pictures
Maintenance Report
Maintenance Report
-
All Jack Fittings greased. Replace if necessary.
-
All bolts tightened monthly.
-
Pump rod cool to the touch. No sign of friction.
-
Seals in good condition. Replace if necessary.
-
Gear Box level checked. Top off if necessary.
-
Belts in good condition. No signs of wear.
-
All pipe lines intact. No sign of leakage.
-
Area around tank battery free of debris, weeds.
-
All tank pipes/gas lines intact, no leakage. Separator, drip, gas meter, flare in working order.
Production Report
Production Report
-
Well Site
-
Status
-
Explanation
Pressures
Tank Levels
-
Tank #1
-
Consistency
-
Inches
-
Barrels
-
Tank #2
-
Consistency
-
Inches
-
Barrels
-
Tank #3
-
Consistency
-
Inches
-
Barrels
-
Notes
-
Pictures
Maintenance Report
Maintenance Report
-
All Jack Fittings greased. Replace if necessary.
-
All bolts tightened monthly.
-
Pump rod cool to the touch. No sign of friction.
-
Seals in good condition. Replace if necessary.
-
Gear Box level checked. Top off if necessary.
-
Belts in good condition. No signs of wear.
-
All pipe lines intact. No sign of leakage.
-
Area around tank battery free of debris, weeds.
-
All tank pipes/gas lines intact, no leakage. Separator, drip, gas meter, flare in working order.
Signature
-
Signature