Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Dam being inspected
Crest (ensure photos are taken of any deficiencies)
-
Any surface cracking?
-
Any visible cave-ins or animal burrows?
-
Low Areas?
-
Horizontal Alignment
-
Ruts and / or puddles
-
Vegetation condition
-
Take photos of any deficiencies found on crest
-
Other deficiencies/comments for the crest.
Upstream slope
-
Any notable slide, slouch, scarp?
-
Damage to the slope protection?
-
Any visible sinkholes or animal burrows?
-
Embankment-abutment contact
-
Erosion?
-
Is there excessive vegetative matter on the upstream slope?
-
Take photos of any deficiencies found on upstream slope
-
Other deficiencies/comments for the upstream face
Downstream Slope
-
Visible wet areas?
-
Any visible seepage? If so, describe its colour (take photo)
-
Any notable slide, slouch, scarp?
-
Embankment-abutment contact
-
Any visible cave-ins or animal burrows?
-
Erosion?
-
Is there excessive vegetative matter on the downstream slope?
-
Take photos of any deficiencies found on downstream slope
-
Other deficiencies/comments for the downstream face
Instrumentation
-
Are they all operational?
-
If a staff gauge is present, is it operational?
-
Are drains unblocked and operational?
-
Are all weirs operational?
-
Where are the records of instrumentation/inspection results kept?
-
Take photos of any deficiencies found with the instrumentation
-
Other deficiencies/comments with the instrumentation
Downstream area
-
Is there any abutment leakage apparent?
-
Is there any apparent seepage from the foundations?
-
Any notable slide, slouch, scarp?
-
Are drains unblocked and operational?
-
Are there any visible hazards visible downstream?
-
Take photos of any deficiencies found on downstream area
-
Other deficiencies/comments for the downstream area
Miscellaneous.
-
Are all reservoir slopes safe? (if applicable)
-
Is there a safe, functioning access path to the dam?
-
Are there any security devices present? If so, are they in working order?
-
Spillway mouth
-
Spillway lining
-
Spillway discharge area
-
Any additional photos?
-
Any additional comments?
Conclusion
-
Name of inspection officer
-
Signature
-
Signed
-
Ensure that the inspection report is registered in ECM under the relevant basin