Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Last Inspection conducted
-
Prepared by
-
Location
-
Inspection party
- Peter Tsoukalas, Senior Asset Planner Dams headworks
- Stewart Dahms, Acting Asset Plann Dams Headworks
- Eric Pepe, C&M Millbrook
- Alex Przygoda, C&M Millbrook
- Andrew Vredenburg, C&M South Para
- Darryl Jones, Dist Leader Millbrook/Sth Para
- Hamish Jack, C&M, Sth Para
- Darren Mack, C&M, Sth Para
- Rob Poole, Asset Planner Dams Headworks
- Dylan Ribbons,Acting Asset Plann Dams Headworks
Add member
-
Name
-
Position
-
Company
Operational Status at time of inspection
-
Dam details
-
Consequence Category
-
Storage Level Gauge board (m), FSL=6.35m
-
Storage Level mAHD, FSL = 407.50 m
-
Water in Storage ML, capacity at FSL = 480ML
-
Releases via outlet ML/day
-
release via spillway
-
Other Comments
-
Photos
-
Sketch of deficincies
Conditions at time of inspection
-
Weather
-
Estimated Max Temperature degrees celsius
-
Sky
-
Wind
-
Rain
-
Days since last rain
-
Other Comments
-
Photos
-
Sketch
Dam Safety Management
-
O&M Manual on Site
-
O&M Manual Reviewed
-
Dam Safety Emergency Plan on Site
-
Dam Safety Emergency Plan reviewed
-
Drawings on site
-
Operator Knowledge
-
Operator training
-
Other Comments
-
Photos
-
Sketches
Crest
-
Cracks
-
Vegetation
-
Sink Holes
-
Subsidence
-
Overtopping
-
Wheel ruts
-
Other deficiencies/comments for the crest.
-
Take photos of any deficiencies found on crest
-
Sketch
Downstream Face
-
Cracks
-
Slips
-
Erosion
-
Vegetation
-
Animal Activity
-
Bulges
-
Subsidence
-
Seepage
-
Other deficiencies/comments for the downstream face
-
Take photos of any deficiencies found on downstream slope
-
Sketch
Upstream Face
-
Cracks
-
Slips
-
Erosion
-
Vegetation
-
Subsidence
-
Animal Activity
-
Bulges
-
Wave Effects
-
Rock Facing
-
Take photos of any deficiencies found on upstream face
-
Other deficiencies/comments for the upstream face
Abutments
-
Cracks
-
Slips
-
Erosion
-
Vegetation
-
Subsidence
-
Seepage
-
Take any photos of abutment observations
-
Other deficiencies/comments for abutments
-
Sketch
Area Downstream of Dam
-
Slips
-
Vegetation
-
Seepage
-
French drains
-
V notch weir
-
Drainage works from WFP
-
Comments
-
Photos
-
Sketch
Outlet Works
-
Concrete
-
Screen
-
Pipework
-
Valves
-
Valve chamber
-
Valve chamber access
-
Sump pump
-
Other comments
-
Photos
-
Sketch
Outlet Works Operation
Downstream 1219mm diameter valve
-
Valve Status
-
Valve tested
-
Valve last tested
-
Valve test satisfactory
-
Other comments
-
Photos
-
Sketch
Inlet works
-
Headwall
-
Screen
-
Concrete channel
-
Other comments
-
Photos
-
Sketch
Spillway
-
Concrete Apron
-
Training Walls
-
Excavated slopes
-
Erosion
-
Vegetation
-
Other comments
-
Photos
-
Sketch
Instrumentation
-
Survey Marks
-
Survey Pillars
-
Standpipes
-
Hydraulic piezometers
-
Gauge board
-
Other comments
-
Photos
-
Sketch
Access to Dam
-
Right Abutment
-
Left abutment
-
Access to dam photos
-
Other access to dam notes
-
Sketch
Reservoir
-
Landslips around rim
-
Boat Ramp
-
Other comments
-
Sketch
-
Photos
Communications
-
Telemetry
-
Telephones
-
Radios
-
Other comments
-
Sketch
-
Photos
Power Supply
-
Normal
-
Standby
-
Other comments
-
Sketch
-
Photos
Surveillance
-
Consequence Category
-
Rainfall
-
Rainfall observation frequency meets ANCOLD guidelines
-
Storage Level
-
Storage Level Observation frequency meets ANCOLD guidelines
-
Seepage
-
Seepage Observation frequency meets ANCOLD guidelines
-
Seepage Analysis
-
Seepage Analysis observation frequency meets ANCOLD guidelines
-
Pore Water Pressure
-
Pore water pressure observation frequency meets ANCOLD guidelines
-
Surface Displacement
-
Surface Displacement observation frequency meets ANCOLD guidelines
-
Internal displacement
-
Internal displacement observation frequency meets ANCOLD guidelines
-
Seismological
-
Seismological observation frequency meets ANCOLD guidelines
-
Telemetry
-
Telemetry observation frequency meets ANCOLD guidelines
-
Visual Inspections
-
Visual Inspection observation frequency meets ANCOLD guidelines
-
Other comments