Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Last Inspection conducted

  • Prepared by

  • Location
  • Inspection Party

Operational Status at time of inspection

  • Type of dam: Earth with clay core

  • Dam height: 31.1 m

  • Storage Level Gauge board (m), FSL=25.40m

  • Storage Level mAHD, FSL = 302.95 m

  • Capacity at FSL 16500 ML

  • Type of spillway: Excavated bywash

  • Consequence Category

  • Water in Storage ML

  • release via spillway

  • Other Comments

  • Photos

  • Sketch of deficincies

Conditions at time of inspection

  • Weather

  • Estimated Max Temperature degrees celsius

  • Sky

  • Wind

  • Rain

  • Days since last rain

  • Other Comments

  • Photos

  • Sketch

Dam Safety Management

  • O&M Manual on Site

  • O&M Manual Reviewed

  • Dam Safety Emergency Plan on Site

  • Dam Safety Emergency Plan reviewed

  • Drawings on site

  • Operator Knowledge

  • Operator training

  • Other Comments

  • Photos

  • Sketches

Crest

  • Cracks

  • Vegetation

  • Sink Holes

  • Subsidence

  • Overtopping

  • Wheel ruts

  • Other deficiencies/comments for the crest.

  • Take photos of any deficiencies found on crest

  • Sketch

Downstream Face

  • Cracks

  • Slips

  • Erosion

  • Vegetation

  • Animal Activity

  • Bulges

  • Subsidence

  • Seepage

  • Berm

  • Other deficiencies/comments for the downstream face

  • Take photos of any deficiencies found on downstream slope

  • Add drawing

Upstream Face

  • Cracks

  • Slips

  • Erosion

  • Vegetation

  • Subsidence

  • Animal Activity

  • Bulges

  • Wave Effects

  • Rock Facing

  • Take photos of any deficiencies found on upstream face

  • Other deficiencies/comments for the upstream face

Abutments

  • Cracks

  • Slips

  • Erosion

  • Vegetation

  • Subsidence

  • Seepage

  • Take any photos of abutment observations

  • Other deficiencies/comments for abutments

Area Downstream of Dam

  • Slips

  • Vegetation

  • Seepage

  • Comments

  • Photos

  • Sketch

Spillway

  • Labyrinth Weir

  • Training Walls

  • Channel floor

  • Joints

  • Erosion

  • Rockfall

  • Other comments

  • Photos

  • Sketch

Inlet/Outlet works

  • Valves

  • Screens

  • Pipework

  • Operating Mechanism

  • Other comments

  • Photos

  • Sketch

Outlet Works Operation

  • Valve Schematic

    HindmarshValves.png
  • Top valve HD1 status

  • Top Valve HD1 tested

  • Top Valve HD1 last tested

  • Top Valve HD1 test satisfactory

  • Other comments

  • Photos

  • Bottom valve HD2 status

  • Bottom valve HD2 tested

  • Bottom valve HD2 last tested

  • Bottom valve HD2 test satisfactory

  • Other comments

  • Photos

  • 300 diam scour gate valve HD3 status

  • 300 diam scour gate valve HD3 tested

  • 300 diam scour gate valve HD3 last tested

  • 300 diam scour gate valve HD3 test satisfactory

  • Other comments

  • Photos

Catch Drain

  • Vegetation

  • Debris

  • Spillways

  • Catch Dam

  • Concrete channel

  • Access road

  • Other comments

  • Photos

  • Sketch

Access to Dam

  • Right Abutment

  • Left abutment

  • Other access to dam notes

  • Sketch

  • Access to dam photos

Reservoir

  • Landslips around rim

  • Boat Ramp

  • Other comments

  • Sketch

  • Photos

Communications

  • Telemetry

  • Telephones

  • Radios

  • Other comments

  • Sketch

  • Photos

Power Supply

  • Normal

  • Standby

  • Other comments

  • Sketch

  • Photos

Instrumentation

  • Standpipes

  • Vibrating wire piezometers

  • Seepage weirs

  • Survey Marks

  • Survey Pillars

  • Gauge board

  • Other comments

  • Photos

  • Sketch

Surveillance

  • Consequence Category

  • Rainfall

  • Rainfall observation frequency meets ANCOLD guidelines

  • Storage Level

  • Storage Level Observation frequency meets ANCOLD guidelines

  • Seepage

  • Seepage Observation frequency meets ANCOLD guidelines

  • Seepage Analysis

  • Seepage Analysis observation frequency meets ANCOLD guidelines

  • Pore Water Pressure

  • Pore water pressure observation frequency meets ANCOLD guidelines

  • Surface Displacement

  • Surface Displacement observation frequency meets ANCOLD guidelines

  • Internal displacement

  • Internal displacement observation frequency meets ANCOLD guidelines

  • Seismological

  • Seismological observation frequency meets ANCOLD guidelines

  • Telemetry

  • Telemetry observation frequency meets ANCOLD guidelines

  • Visual Inspections

  • Visual Inspection observation frequency meets ANCOLD guidelines

  • Other comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.