Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Last Inspection conducted

  • Prepared by

  • Location
  • Inspection Party

Operational Status at time of inspection

Operational Status at Time of Inspection

  • Storage Level Gauge board (m)

  • Storage Level mAHD

  • Water in Storage ML

  • Volume taken by treatment plant in 24hrs to 8:00am

  • release via spillway

  • Environmental releases ML/day

  • Other Comments

  • Sketch of deficincies

Conditions at time of inspection

Conditions at time of inspection

  • Weather

  • Estimated Max Temperature degrees celsius

  • Sky

  • Wind

  • Rain

  • Days since last rain

  • Other Comments

Dam Safety Management

Dam Safety Management

  • O&M Manual on Site

  • O&M Manual Reviewed

  • Dam Safety Emergency Plan on Site

  • Dam Safety Emergency Plan reviewed

  • Drawings on site

  • Operator Knowledge

  • Operator Training

  • Other Comments

Crest

Crest (ensure photos are taken of any deficiencies)

  • Cracks ?

  • Vegetation ?

  • Sink Holes ?

  • Subsidence?

  • Overtopping ?

  • Wheel ruts ?

  • Take photos of any deficiencies found on crest

  • Other deficiencies/comments for the crest.

Downstream Face

Downstream face

  • Cracks?

  • Slips ?

  • Erosion ?

  • Vegetation?

  • Animal Activity?

  • Bulges

  • Subsidence ?

  • Wheel ruts in berm

  • Take photos of any deficiencies found on downstream slope

  • Other deficiencies/comments for the downstream face

Upstream Face

Upstream Face

  • Cracks?

  • Slips?

  • Erosion ?

  • Vegetation?

  • Subsidence?

  • Animal Activity ?

  • Bulges ?

  • Wave Effects ?

  • Rock Facing

  • Take photos of any deficiencies found on upstream face

  • Other deficiencies/comments for the upstream face

Abutments

Abutments

  • Slips ?

  • Cracks ?

  • Seepage ?

  • Erosion ?

  • Vegetation

  • Subsidence ?

  • Take any photos of abutment observations

  • Other deficiencies/comments for abutments

Area Downstream of Dam

Area Downstream of Dam

  • Seepage

  • Seepage Chamber

  • Subsidence

  • Bulges

  • Seepage Trench

  • Seepage pump Station

  • Catchdrain downstream dissipator area

  • Scour Channel

  • Drain at downstream toe maximum section

  • Spillway Gate

  • Downstream scour valve chamber

  • Lower Level outlet drain

  • Take any photos of downstream area observations

  • Other Deficiencies/comments for area downstream of dam

Northern Catch Drain

Northern catch Drain

  • Stormwater detention area

  • Concrete lining

  • Vegetation

  • Debris

  • Outlet from drain

  • Dissipator

  • Take any photos of Northern Catch drain

  • Other Observations for Northern Catch Drain

Southern Catch Drain

Southern Catch Drain

  • Concrete Lining

  • Vegetation

  • Debris

  • Outlet from drain

  • Dissipator

  • Photos of Southern Catch drain

  • Other Observations for Southern Catch Drain

Lower Level Outlet tower

Lower Level Outlet tower

  • Electrical

  • Internal walls

  • Leakage

  • Pipework

  • Valves

  • Internal access

  • External access

  • Security

  • Superstructure

  • Photos of lower level outlet tower

  • Other Observations for Lower Level outlet tower

Upper Level Outlet Tower

Upper Level Outlet

  • Hinged flange at scour channel

  • Chamber walls

  • Leakage

  • Internal access

  • Pipework

  • Valve

  • Security

  • Upper Level outlet tower Photos

  • Other Upper Level Outlet Tower observations

Inlet Works

Inlet Works

Gorge Weir

  • Scour Valves

  • Date Inspected

  • Weir level m gauge board

  • Weir Level mAHD

  • Crest

  • Downtstream Face

  • Upstream Face

  • Abutment blocks

  • Area Downstream

  • Outlet Gates

  • Trashrack

  • Photos of Gorge Weir

  • Other Gorge Weir Observations

Aqueduct

Inlet Tunnel

  • Aqueduct Photos

  • Aqueduct Observations

  • Inlet Tunnel observations

  • Other Surveillance observations

Outlet Works Operation

Outlet Works Operation

Upper Level Outlet

  • Upper Level Outlet Valve Status

  • Upper Level outlet tested

  • Upper Level outlet last tested

  • Last Upper Level outlet test satisfactory

  • Photos of Upper Level Outlet

  • Upper Level Outlet Operation comments

Lower Level outlet

  • Lower Level Outlet Valve Status

  • Lower Level Outlet tested

  • Date Lower Level Outlet last tested

  • Last Lower level outlet test satisfactory ?

  • Photos of Lower Level outlet

  • Lower Level outlet operation comments

Downstream Valve

  • Downstream valve tested

  • Date downstream valve last tested

  • Downstream valve Status

  • Last dowsntream valve test satisfactory ?

  • Downstream valve photos

  • Downstream valve observations

  • Outlet works Operation Comments

Access to Dam

Access to dam

  • Right Abutment

  • Left abutment

  • Access to dam photos

  • Other access to dam notes

Reservoir

Reservoir

  • Landslips around rim

  • Boat Ramp

  • Reservoir photos

  • Other Reservoir observations

Communications

Communications

  • Telemetry

  • Telephones

  • Radios

  • Communications photos

  • Other communications observations

Power Supply

Power Supply

  • Standby

  • Normal

  • Power Supply Photos

  • Other Power supply comments

Instrumentation

Instrumentation

  • Take photos of any deficiencies found with the instrumentation

  • Survey Marks

  • Survey Pillars

  • Pneumatic Piezometers

  • Standpipes

  • Vibrating Wire Piezometers

  • V notch weir

  • Other deficiencies/comments with the instrumentation

Surveillance

Surveillance

  • Rainfall

  • Rainfall observation frequency meets ANCOLD guidelines

  • Storage Level

  • Storage Level Observation frequency meets ANCOLD guidelines

  • Internal displacement

  • Internal displacement observation frequency meets ANCOLD guidelines

  • Seepage

  • Seepage Observation frequency meets ANCOLD guidelines

  • Seepage Analysis

  • Seepage Analysis observation frequency meets ANCOLD guidelines

  • Pore Water Pressure

  • Pore water pressure observation frequency meets ANCOLD guidelines

  • Surface Displacement

  • Surface Displacement observation frequency meets ANCOLD guidelines

  • Telemetry

  • Telemetry observation frequency meets ANCOLD guidelines

  • Visual Inspections

  • Visual Inspection observation frequency meets ANCOLD guidelines

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.