Inspection Party
- Peter Tsoukalas, Senior Asset Planner Dams headworks
- Stewart Dahms, Acting Asset Plann Dams Headworks
- Eric Pepe, C&M Millbrook
- Alex Przygoda, C&M Millbrook
Operational Status at time of inspection
Operational Status at Time of Inspection
-
Storage Level Gauge board (m)
-
Storage Level mAHD
-
Water in Storage ML
-
Volume taken by treatment plant in 24hrs to 8:00am
-
release via spillway
-
Environmental releases ML/day
-
Other Comments
-
Sketch of deficincies
Conditions at time of inspection
Conditions at time of inspection
-
Weather
-
Estimated Max Temperature degrees celsius
-
Sky
-
Wind
-
Rain
-
Days since last rain
-
Other Comments
Dam Safety Management
Dam Safety Management
-
O&M Manual on Site
-
O&M Manual Reviewed
-
Dam Safety Emergency Plan on Site
-
Dam Safety Emergency Plan reviewed
-
Drawings on site
-
Operator Knowledge
-
Operator Training
-
Other Comments
Crest
Crest (ensure photos are taken of any deficiencies)
-
Cracks ?
-
Vegetation ?
-
Sink Holes ?
-
Subsidence?
-
Overtopping ?
-
Wheel ruts ?
-
Take photos of any deficiencies found on crest
-
Other deficiencies/comments for the crest.
Downstream Face
Downstream face
-
Cracks?
-
Slips ?
-
Erosion ?
-
Vegetation?
-
Animal Activity?
-
Bulges
-
Subsidence ?
-
Wheel ruts in berm
-
Take photos of any deficiencies found on downstream slope
-
Other deficiencies/comments for the downstream face
Upstream Face
Upstream Face
-
Cracks?
-
Slips?
-
Erosion ?
-
Vegetation?
-
Subsidence?
-
Animal Activity ?
-
Bulges ?
-
Wave Effects ?
-
Rock Facing
-
Take photos of any deficiencies found on upstream face
-
Other deficiencies/comments for the upstream face
Abutments
Abutments
-
Slips ?
-
Cracks ?
-
Seepage ?
-
Erosion ?
-
Vegetation
-
Subsidence ?
-
Take any photos of abutment observations
-
Other deficiencies/comments for abutments
Area Downstream of Dam
Area Downstream of Dam
-
Seepage
-
Seepage Chamber
-
Subsidence
-
Bulges
-
Seepage Trench
-
Seepage pump Station
-
Catchdrain downstream dissipator area
-
Scour Channel
-
Drain at downstream toe maximum section
-
Spillway Gate
-
Downstream scour valve chamber
-
Lower Level outlet drain
-
Take any photos of downstream area observations
-
Other Deficiencies/comments for area downstream of dam
Northern Catch Drain
Northern catch Drain
-
Stormwater detention area
-
Concrete lining
-
Vegetation
-
Debris
-
Outlet from drain
-
Dissipator
-
Take any photos of Northern Catch drain
-
Other Observations for Northern Catch Drain
Southern Catch Drain
Southern Catch Drain
-
Concrete Lining
-
Vegetation
-
Debris
-
Outlet from drain
-
Dissipator
-
Photos of Southern Catch drain
-
Other Observations for Southern Catch Drain
Lower Level Outlet tower
Lower Level Outlet tower
-
Electrical
-
Internal walls
-
Leakage
-
Pipework
-
Valves
-
Internal access
-
External access
-
Security
-
Superstructure
-
Photos of lower level outlet tower
-
Other Observations for Lower Level outlet tower
Upper Level Outlet Tower
Upper Level Outlet
-
Hinged flange at scour channel
-
Chamber walls
-
Leakage
-
Internal access
-
Pipework
-
Valve
-
Security
-
Upper Level outlet tower Photos
-
Other Upper Level Outlet Tower observations
Inlet Works
Inlet Works
Gorge Weir
-
Scour Valves
-
Date Inspected
-
Weir level m gauge board
-
Weir Level mAHD
-
Crest
-
Downtstream Face
-
Upstream Face
-
Abutment blocks
-
Area Downstream
-
Outlet Gates
-
Trashrack
-
Photos of Gorge Weir
-
Other Gorge Weir Observations
Aqueduct
Inlet Tunnel
-
Aqueduct Photos
-
Aqueduct Observations
-
Inlet Tunnel observations
-
Other Surveillance observations
Outlet Works Operation
Outlet Works Operation
Upper Level Outlet
-
Upper Level Outlet Valve Status
-
Upper Level outlet tested
-
Upper Level outlet last tested
-
Last Upper Level outlet test satisfactory
-
Photos of Upper Level Outlet
-
Upper Level Outlet Operation comments
Lower Level outlet
-
Lower Level Outlet Valve Status
-
Lower Level Outlet tested
-
Date Lower Level Outlet last tested
-
Last Lower level outlet test satisfactory ?
-
Photos of Lower Level outlet
-
Lower Level outlet operation comments
Downstream Valve
-
Downstream valve tested
-
Date downstream valve last tested
-
Downstream valve Status
-
Last dowsntream valve test satisfactory ?
-
Downstream valve photos
-
Downstream valve observations
-
Outlet works Operation Comments
Access to Dam
Access to dam
-
Right Abutment
-
Left abutment
-
Access to dam photos
-
Other access to dam notes
Reservoir
Reservoir
-
Landslips around rim
-
Boat Ramp
-
Reservoir photos
-
Other Reservoir observations
Communications
Communications
-
Telemetry
-
Telephones
-
Radios
-
Communications photos
-
Other communications observations
Power Supply
Power Supply
-
Standby
-
Normal
-
Power Supply Photos
-
Other Power supply comments
Instrumentation
Instrumentation
-
Take photos of any deficiencies found with the instrumentation
-
Survey Marks
-
Survey Pillars
-
Pneumatic Piezometers
-
Standpipes
-
Vibrating Wire Piezometers
-
V notch weir
-
Other deficiencies/comments with the instrumentation
Surveillance
Surveillance
-
Rainfall
-
Rainfall observation frequency meets ANCOLD guidelines
-
Storage Level
-
Storage Level Observation frequency meets ANCOLD guidelines
-
Internal displacement
-
Internal displacement observation frequency meets ANCOLD guidelines
-
Seepage
-
Seepage Observation frequency meets ANCOLD guidelines
-
Seepage Analysis
-
Seepage Analysis observation frequency meets ANCOLD guidelines
-
Pore Water Pressure
-
Pore water pressure observation frequency meets ANCOLD guidelines
-
Surface Displacement
-
Surface Displacement observation frequency meets ANCOLD guidelines
-
Telemetry
-
Telemetry observation frequency meets ANCOLD guidelines
-
Visual Inspections
-