Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Last Inspection conducted

  • Prepared by

  • Location
  • Inspection Party

Operational Status at time of inspection

  • Storage Level Gauge board (m) FSL = 44.16m

  • Storage Level mAHD FSL = 237.3m

  • Water in Storage ML

  • Releases via outlet

  • Release via spillway

  • Environmental releases ML/day

  • Other Comments

  • Photos

  • Sketch

Conditions at time of inspection

  • Weather

  • Estimated Max Temperature degrees celsius

  • Sky

  • Wind

  • Rain

  • Days since last rain

  • Other Comments

  • Photos

  • Sketch

Dam Safety Management

  • O&M Manual on Site

  • O&M Manual Reviewed

  • Dam Safety Emergency Plan on Site

  • Dam Safety Emergency Plan reviewed

  • Drawings on site

  • Operator Knowledge

  • Operator Training

  • Other Comments

  • Photos

  • Sketches

Crest

  • Cracks

  • Vegetation

  • Subsidence

  • Overtopping

  • Wheel ruts

  • Parapet Wall

  • Concrete Box

  • Guard Rail

  • Lighting

  • Other deficiencies/comments for the upstream face

  • Photos

  • Sketch

Downstream Face

  • Cracks

  • Slips

  • Erosion

  • Vegetation

  • Bulges

  • Subsidence

  • Seepage

  • Other Comments

  • Photos

  • Sketch

Upstream Face

  • Concrete Cracking

  • Concrete Spalling

  • Concrete Deterioration

  • Concrete Joints

  • Concrete missalignment

  • Right abutment block

  • Seal on parapet walls

  • Gravel mattress

  • Other comments

  • Photos

  • Sketch

Abutments

  • Slips

  • Cracks

  • Erosion

  • Vegetation

  • Subsidence

  • Seepage

  • Left Abutment block

  • 3D measurement TOP

  • 3D measurement SIDE

  • 3D measurement END

  • Other Comments

  • Photos

  • Sketch

Area Downstream of Dam

  • Seepage

  • Seepage Weir

  • Subsidence

  • Bulges

  • Other Comments

  • Photos

  • Sketch

Spillway

  • Crest

  • Ducts

  • Channel

  • Flip bucket

  • Training walls

  • Gallery

  • Excavation

  • Other Comments

  • Photos

  • Sketch

Intake Structure

  • Internal walls

  • Leakage

  • Pipework

  • Valves

  • Internal Access

  • Security

  • Superstructure

  • Sump pump

  • Bulkhead

  • Monorail

  • Ventilation

  • Screens

  • Other Comments

  • Photos

  • Sketch

Outlet tunnel

  • Access

  • Internal condition

  • Ventilation

  • Pipework

  • Valves

  • Sump Pump

  • Tunnel Plug

  • Stilling basin

  • Jib crane

  • Other Comments

  • Photos

  • Sketch

Outlet Works Operation - Intake Structure

Intake structure

Valve 1 (KC1) Scour

  • Valve 1 (KC1) Scour Status

  • Valve 1 (KC1) Scour tested

  • Valve 1 (KC1) Scour last tested

  • Valve 1 (KC1) Scour test satisfactory

  • Comments

Valve 2 (KC2)

  • Valve 2 (KC2) Status

  • Valve 2 (KC2) tested

  • Valve 2 (KC2) last tested

  • Valve 2 (KC2) test satisfactoy

  • Comments

Valve 3 (KC3)

  • Valve 3 (KC3) Status

  • Valve 3 (KC3) tested

  • Valve 3 (KC3) last tested

  • Valve 3 (KC3) test satisfactory

  • Comments

Valve 4 (KC4)

  • Valve 4 (KC4) status

  • Valve 4 (KC4) tested

  • Valve 4 (KC4) last tested

  • Valve 4 (KC4) test satisfactory

  • Comments

Valve 5 (KC5)

  • Valve 5 (KC5) status

  • Valve 5 (KC5) tested

  • Valve 5 (KC5) last tested

  • Valve 5 (KC5) test satisfactory

  • Comments

Valve 6 (KC6)

  • Valve 6 (KC6) status

  • Valve 6 (KC6) tested

  • Valve 6 (KC6) last tested

  • Valve 6 (KC6) test satisfactory

  • Comments

  • Comments

  • Photos

  • Sketch

Outlet Works Operation - Outlet Tunnel

Outlet Tunnel

Valve 1 (KC7) LHS tunnel plug

  • Valve 1 (KC7) Status

  • Valve 1 (KC7) tested

  • Valve 1 (KC7) last tested

  • Valve 1 (KC7) test satisfactory

  • Comments

Valve 2 (KC8) RHS tunnel plug

  • Valve 2 (KC8) Status

  • Valve 2 (KC8) tested

  • Valve 2 (KC8) last tested

  • Valve 2 (KC8) test satisfactoy

  • Comments

Valve 3 (KC9)

  • Valve 3 (KC9) Status

  • Valve 3 (KC9) tested

  • Valve 3 (KC9) last tested

  • Valve 3 (KC9) test satisfactory

  • Comments

(KC10) 30 inch stop valve

  • (KC10) status

  • (KC10) tested

  • (KC10) last tested

  • (KC10) test satisfactory

  • Comments

Valve 4 (KC11) butterfly valve LHS

  • Valve 4 (KC11) status

  • Valve 4 (KC11) tested

  • Valve 4 (KC11) last tested

  • Valve 4 (KC11) test satisfactory

  • Comments

Valve 5 (KC12) butterfly valve RHS

  • Valve 5 (KC12) status

  • Valve 5 (KC12) tested

  • Valve 5 (KC12) last tested

  • Valve 5 (KC12) test satisfactory

  • Comments

Valve HJ1 (KC13) LHS Hollow Jet

  • Valve HJ1 (KC13) Status

  • Valve HJ1 (KC13) tested

  • Valve HJ1 (KC13) last tested

  • Valve HJ1 (KC13) test satisfactory

  • Comments

Valve HJ2 (KC14) RHS Hollow Jet

  • Valve HJ2 (KC14) status

  • Valve HJ2 (KC14) tested

  • Valve HJ2 (KC14) last tested

  • Valve HJ2 (KC14) test satisfactory

  • Comments

  • Comments

  • Photos

  • Sketch

Instrumentation

  • Gauge board

  • Survey pins

  • Survey Pillars

  • Survey Walkways

  • Seepage weir

  • Earthquake recorder

  • Comments

  • Photos

  • Add drawing

Access to Dam

  • Right Abutment

  • Left abutment

  • From downstream access road

  • Access to dam photos

  • Other access to dam notes

Reservoir

  • Landslips around rim

  • Boat Ramp

  • Other Reservoir observations

  • Photos

  • Sketch

Communications

  • Telephones

  • Radios

  • Telemetry

  • Other comments

  • Photos

  • Sketch

Power Supply

  • Normal

  • Standby

  • Other comments

  • Photos

  • Sketch

Surveillance

  • Rainfall

  • Rainfall observation frequency meets ANCOLD guidelines

  • Storage Level

  • Storage Level Observation frequency meets ANCOLD guidelines

  • Seepage

  • Seepage Observation frequency meets ANCOLD guidelines

  • Seepage Analysis

  • Seepage Analysis observation frequency meets ANCOLD guidelines

  • Pore Water Pressure

  • Pore water pressure observation frequency meets ANCOLD guidelines

  • Surface Displacement

  • Surface Displacement observation frequency meets ANCOLD guidelines

  • Internal displacement

  • Internal displacement observation frequency meets ANCOLD guidelines

  • Seismological

  • Seismological observation frequency meets ANCOLD guidelines

  • Telemetry

  • Telemetry observation frequency meets ANCOLD guidelines

  • Visual Inspections

  • Visual Inspection observation frequency meets ANCOLD guidelines

  • Other comments

  • Photos

  • Sketch

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.