Information
-
Type of dam: Earth with clay core
-
Dam height: 15.10 m
-
FSL gauge board: 11.06 m
-
FSL EL 68.35 mAHD
-
Capacity at FSL 475 ML
-
Type of spillway: Labyrinth weir in concrete channel
-
Conducted on
-
Last Inspection conducted
-
Prepared by
-
Location
-
Inspection Party
Operational Status at time of inspection
-
Dam Details
-
Storage Level Gauge board (m),
-
Storage Level mAHD
-
Water in Storage ML
-
release via spillway
-
Other Comments
-
Consequence Category
-
Photos
-
Sketch of deficincies
Conditions at time of inspection
-
Weather
-
Estimated Max Temperature degrees celsius
-
Sky
-
Wind
-
Rain
-
Days since last rain
-
Other Comments
-
Photos
-
Sketch
Dam Safety Management
-
O&M Manual on Site
-
O&M Manual Reviewed
-
Dam Safety Emergency Plan on Site
-
Dam Safety Emergency Plan reviewed
-
Drawings on site
-
Operator Knowledge
-
Operator training
-
Other Comments
-
Photos
-
Sketches
Crest
-
Cracks
-
Vegetation
-
Sink Holes
-
Subsidence
-
Overtopping
-
Wheel ruts
-
Other deficiencies/comments for the crest.
-
Take photos of any deficiencies found on crest
-
Sketch
Downstream Face
-
Cracks
-
Slips
-
Erosion
-
Vegetation
-
Animal Activity
-
Bulges
-
Subsidence
-
Seepage
-
Berm
-
Other deficiencies/comments for the downstream face
-
Take photos of any deficiencies found on downstream slope
-
Add drawing
Upstream Face
-
Cracks
-
Slips
-
Erosion
-
Vegetation
-
Subsidence
-
Animal Activity
-
Bulges
-
Wave Effects
-
Rock Facing
-
Take photos of any deficiencies found on upstream face
-
Other deficiencies/comments for the upstream face
Abutments
-
Cracks
-
Slips
-
Erosion
-
Vegetation
-
Subsidence
-
Seepage
-
Take any photos of abutment observations
-
Other deficiencies/comments for abutments
Area Downstream of Dam
-
Slips
-
Vegetation
-
Seepage
-
Comments
-
Photos
-
Sketch
Spillway
-
Labyrinth Weir
-
Training Walls
-
Channel floor
-
Joints
-
Erosion
-
Rockfall
-
Other comments
-
Photos
-
Sketch
Inlet/Outlet works
-
Valves
-
Screens
-
Pipework
-
Operating Mechanism
-
Other comments
-
Photos
-
Sketch
Outlet Works Operation
-
Valve Schematic
-
Top valve HD1 status
-
Top Valve HD1 tested
-
Top Valve HD1 last tested
-
Top Valve HD1 test satisfactory
-
Other comments
-
Photos
-
Bottom valve HD2 status
-
Bottom valve HD2 tested
-
Bottom valve HD2 last tested
-
Bottom valve HD2 test satisfactory
-
Other comments
-
Photos
-
300 diam scour gate valve HD3 status
-
300 diam scour gate valve HD3 tested
-
300 diam scour gate valve HD3 last tested
-
300 diam scour gate valve HD3 test satisfactory
-
Other comments
-
Photos
Catch Drain
-
Vegetation
-
Debris
-
Spillways
-
Catch Dam
-
Concrete channel
-
Access road
-
Other comments
-
Photos
-
Sketch
Access to Dam
-
Right Abutment
-
Left abutment
-
Other access to dam notes
-
Sketch
-
Access to dam photos
Reservoir
-
Landslips around rim
-
Boat Ramp
-
Other comments
-
Sketch
-
Photos
Communications
-
Telemetry
-
Telephones
-
Radios
-
Other comments
-
Sketch
-
Photos
Power Supply
-
Normal
-
Standby
-
Other comments
-
Sketch
-
Photos
Instrumentation
-
Standpipes
-
Vibrating wire piezometers
-
Seepage weirs
-
Survey Marks
-
Survey Pillars
-
Gauge board
-
Other comments
-
Photos
-
Sketch
Surveillance
-
Consequence Category
-
Rainfall
-
Rainfall observation frequency meets ANCOLD guidelines
-
Storage Level
-
Storage Level Observation frequency meets ANCOLD guidelines
-
Seepage
-
Seepage Observation frequency meets ANCOLD guidelines
-
Seepage Analysis
-
Seepage Analysis observation frequency meets ANCOLD guidelines
-
Pore Water Pressure
-
Pore water pressure observation frequency meets ANCOLD guidelines
-
Surface Displacement
-
Surface Displacement observation frequency meets ANCOLD guidelines
-
Internal displacement
-
Internal displacement observation frequency meets ANCOLD guidelines
-
Seismological
-
Seismological observation frequency meets ANCOLD guidelines
-
Telemetry
-
Telemetry observation frequency meets ANCOLD guidelines
-
Visual Inspections
-
Visual Inspection observation frequency meets ANCOLD guidelines
-
Other comments