Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Last Inspection conducted
-
Prepared by
-
Location
-
Inspection party
- Peter Tsoukalas, Senior Asset Planner Dams headworks
- Stewart Dahms, Acting Asset Plann Dams Headworks
- Eric Pepe, C&M Millbrook
- Alex Przygoda, C&M Millbrook
- Andrew Johanning, C&M Port Pirie
- Neil Mclean, Snr Construction and Mtce Wkr
- Mark Williams,Snr Construction and Mtce Wkr
- Peter Pavy, Mgr Land Mgmt & Reservoirs
- Dylan RIbbons, Acting Asset Plann Dams Headworks
Add member
-
Name
-
Position
-
Company
Operational Status at time of inspection
-
Dam Details
-
Consequence Category
-
Storage Level Gauge board (m), FSL=23.88
-
Storage Level mAHD, FSL = 364.27
-
Water in Storage ML, capacity at FSL = 3,150
-
release via spillway
-
Other Comments
-
Photos
-
Sketch
Conditions at time of inspection
-
Weather
-
Estimated Max Temperature degrees celsius
-
Sky
-
Wind
-
Rain
-
Days since last rain
-
Other Comments
-
Photos
-
Sketch
Dam Safety Management
-
O&M Manual on Site
-
O&M Manual Reviewed
-
Dam Safety Emergency Plan on Site
-
Dam Safety Emergency Plan reviewed
-
Drawings on site
-
Operator Knowledge
-
Operator training
-
Other Comments
-
Photos
-
Sketches
Crest
-
Guard fence
-
Concrete cracking
-
Concrete spalling
-
Concrete deterioration
-
Other observations
-
Photos
-
Sketch
Downstream Face
-
Concrete cracking
-
Concrete spalling
-
Concrete deterioration
-
Seepage on face
-
Seepage at toe
-
Toe protection
-
Other comments
-
Photos
-
Sketch
Upstream Face
-
Concrete cracking
-
Concrete spalling
-
Concrete deterioration
-
Photos
-
Other observations
-
Sketch
Abutments
-
Seepage
-
Cracks
-
Slides
-
Vegetation
-
Take any photos of abutment observations
-
Other deficiencies/comments for abutments
-
Sketch
Area Downstream of Dam
-
Seepage
-
Subsidence
-
Bulges
-
Vegetation
-
Comments
-
Photos
-
Sketch
Spillway
-
Crest
-
Training walls
-
Channel floor
-
Baffle blocks
-
Erosion
-
Underdrains
-
Seepage
-
Other comments
-
Photos
-
Sketch
Outlet works (upstream of tunnel plug)
-
Valve house
-
Screens
-
Offtake valves
-
Outlet pipe
-
Operating rods
-
Operating equipment
-
Security
-
Other comments
-
Photos
-
Sketch
Outlet tunnel
-
Rock stability
-
Pipework
-
Valves
-
Seepage
-
Lighting
-
Tunnel plug
-
Security
-
Other comments
-
Photos
-
Sketch
Outlet Works Operation
-
Valve Schematic
-
Top valve BL1 status
-
Top valve BL1 tested
-
Top valve BL1 last tested
-
Top valve BL1 test satisfactory
-
Other comments
-
Photos
-
Middle valve BL2 status
-
Middle valve BL2 tested
-
Middle valve BL2 last tested
-
Middle valve BL2 test satisfactory
-
Other comments
-
Photos
-
Lower valve BL3 status
-
Lower valve BL3 tested
-
Lower valve BL3 last tested
-
Lower valve BL3 test satisfactory
-
Other comments
-
Photos
-
Valves BL4 and BL5 downstream of bifurcation in the tunnel
-
Other comments
-
Photos
-
LHS Isolating valve downstream of portal BL6 status
-
LHS Isolating valve downstream of portal BL6 tested
-
LHS Isolating valve downstream of portal BL6 last tested
-
LHS Isolating valve downstream of portal BL6 test satisfactory
-
Comments
-
Photos
-
RHS Isolating valve downstream of portal BL7 status
-
RHS Isolating valve downstream of portal BL7 tested
-
RHS Isolating valve downstream of portal BL7 last tested
-
RHS Isolating valve downstream of portal BL7 test satisfactory
-
Comments
-
Photos
-
Overall comments
-
Overall photos
Inlet Works
Bundaleer Weir
-
Crest
-
Downstream face
-
Upstream face
-
Abutment blocks
-
Area downstream
-
Outlet gates
-
Outlet screen
-
Scour valve
-
Bundaleer channel
-
Bundaleer aqueduct
-
Comments
-
Photos
Freshwater creek Weir
-
Crest
-
Downstream face
-
Upstream face
-
Abutment blocks
-
Outlet works
-
Channel
-
Comments
-
Photos
Broughton Weir
-
Crest
-
Downstream face
-
Upstream face
-
Abutment blocks
-
Outlet works
-
Channel
-
Scour Valve
-
Comments
-
Photos
-
Other comments
-
Photos
-
Sketch
Access to Dam
-
Right Abutment
-
Left abutment
-
Other access to dam notes
-
Access to dam photos
-
Sketch
Reservoir
-
Landslips around rim
-
Boat Ramp
-
Other comments
-
Sketch
-
Photos
Communications
-
Telemetry
-
Telephones
-
Radios
-
Other comments
-
Sketch
-
Photos
Power Supply
-
Normal
-
Standby
-
Other comments
-
Sketch
-
Photos
Instrumentation
-
Survey marks
-
Survey pillars
-
Pneumatic piezometers
-
Concrete thermometers
-
Inverted pendulum
-
Tunnel seepage
-
Other comments
-
Photos
-
Sketch
Surveillance
-
Consequence Category
-
Rainfall
-
Rainfall observation frequency meets ANCOLD guidelines
-
Storage Level
-
Storage Level Observation frequency meets ANCOLD guidelines
-
Seepage
-
Seepage Observation frequency meets ANCOLD guidelines
-
Seepage Analysis
-
Seepage Analysis observation frequency meets ANCOLD guidelines
-
Pore Water Pressure
-
Pore water pressure observation frequency meets ANCOLD guidelines
-
Surface Displacement
-
Surface Displacement observation frequency meets ANCOLD guidelines
-
Internal displacement
-
Internal displacement observation frequency meets ANCOLD guidelines
-
Seismological
-
Seismological observation frequency meets ANCOLD guidelines
-
Telemetry
-
Telemetry observation frequency meets ANCOLD guidelines
-
Visual Inspections
-
Visual Inspection observation frequency meets ANCOLD guidelines
-
Other comments