Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Last Inspection conducted
-
Prepared by
-
Location
-
Inspection party
- Peter Tsoukalas, Senior Asset Planner Dams headworks
- Stewart Dahms, Acting Asset Plann Dams Headworks
- Eric Pepe, C&M Millbrook
- Alex Przygoda, C&M Millbrook
- Andrew Johanning, C&M Port Pirie
- Neil Mclean, Snr Construction and Mtce Wkr
- Mark Williams,Snr Construction and Mtce Wkr
- Peter Pavy, Mgr Land Mgmt & Reservoirs
- Dylan RIbbons, Acting Asset Plann Dams Headworks
- Andrew Johanning, DIstrict Leader Pt Pirie
Add member
-
Name
-
Position
-
Company
Operational Status at time of inspection
-
Dam Details
-
Consequence Category
-
Storage Level Gauge board (m), FSL=23.00
-
Storage Level mAHD, FSL = 117.25
-
Water in Storage ML, capacity at FSL = 6,140ML
-
release via spillway
-
Other Comments
-
Photos
-
Sketch
Conditions at time of inspection
-
Weather
-
Estimated Max Temperature degrees celsius
-
Sky
-
Wind
-
Rain
-
Days since last rain
-
Other Comments
-
Photos
-
Sketch
Dam Safety Management
-
O&M Manual on Site
-
O&M Manual Reviewed
-
Dam Safety Emergency Plan on Site
-
Dam Safety Emergency Plan reviewed
-
Drawings on site
-
Operator Knowledge
-
Operator training
-
Other Comments
-
Photos
-
Sketches
Crest
-
Cracks
-
Vegetation
-
Sink Holes
-
Subsidence
-
Overtopping
-
Wheel ruts
-
Other deficiencies/comments for the crest.
-
Take photos of any deficiencies found on crest
-
Sketch
Downstream Face
-
Cracks
-
Slips
-
Erosion
-
Vegetation
-
Animal Activity
-
Bulges
-
Subsidence
-
Seepage
-
Wave effects
-
Rock facing
-
Other deficiencies/comments for the downstream face
-
Photos
-
Sketch
Upstream Face
-
Cracks
-
Slips
-
Erosion
-
Vegetation
-
Subsidence
-
Animal Activity
-
Bulges
-
Wave Effects
-
Rock Facing
-
Take photos of any deficiencies found on upstream face
-
Other deficiencies/comments for the upstream face
Abutments
-
Cracks
-
Slips
-
Erosion
-
Vegetation
-
Subsidence
-
Seepage
-
Take any photos of abutment observations
-
Other deficiencies/comments for abutments
Area Downstream of Dam
-
Subsidence
-
Bulges
-
Seepage
-
Seepage trenches
-
Weir Waterhole
-
Segnit's waterhole
-
Comments
-
-
Photos
-
Sketch
Spillway
-
Upstream approach
-
Ogee crest
-
Flow splitter walls
-
Channel floor
-
Channel walls
-
Stilling basin weir
-
Downstream erosion protection
-
Road bridge
-
Vegetation
-
Seepage
-
Other comments
-
Plan of spillway
-
Photos
-
Sketch
Outlet works
-
Valve house
-
Pipework
-
Security
Valves
Top Valve
-
Valve
-
Screen
-
Operating Mechanism
Middle Valve
-
Valve
-
Screen
-
Operating mechanism
Bottom Valve
-
Valve
-
Screen
-
Operating mechanism
-
Other comments
-
Photos
-
Sketch
Outlet Works Operation
-
Valve Schematic
-
Top valve BT1 status
-
Top Valve BT1 tested
-
Top Valve BT1 last tested
-
Top Valve BT1 test satisfactory
-
Other comments
-
Photos
-
Middle valve BT2 status
-
Middle valve BT2 tested
-
Middle valve BT2 last tested
-
Middle valve BT2 test satisfactory
-
Other comments
-
Photos
-
Bottom valve BT3 status
-
Bottom valve BT3 tested
-
Bottom valve BT3 last tested
-
Bottom valve BT3 test satisfactory
-
Other comments
-
Photos
-
Outlet guard valve (BT4) status
-
Outlet guard valve (BT4) tested
-
Outlet guard valve (BT4) last tested
-
Outlet guard valve (BT4) test satisfactory
-
Other comments
-
Photos
-
Bypass valve (BT5) status
-
Bypass valve (BT5) tested
-
Bypass valve (BT5) last tested
-
Bypass valve (BT5) test satisfactory
-
Comments
-
Photos
-
Scour valve (BT9) status
-
Scour valve (BT9) tested
-
Scour valve (BT9) last tested
-
Scour valve (BT9) test satisfactory
-
Comments
-
Photos
-
Isolating valve (BT7) status
-
Isolating valve (BT7) tested
-
Isolating valve (BT7) last tested
-
Isolating valve (BT7) test satisfactory
-
Comments
-
Photos
-
Isolating valve bypass (BT8) status
-
Isolating valve bypass (BT8) tested
-
Isolating valve bypass (BT8) test satisfactory
-
Isolating valve bypass (BT8) last tested
-
Comments
-
Photos
Outlet tunnel
-
Concrete lining
-
Pipework
-
Valves
-
Tunnel plug
-
Lighting
-
Walkway
-
Downstream channel
-
Security
-
Drainage
-
Ventilation
-
Other comments
-
Photos
-
Sketch
Access to Dam
-
Right Abutment
-
Left abutment
-
Other access to dam notes
-
Sketch
-
Access to dam photos
Reservoir
-
Landslips around rim
-
Boat Ramp
-
Other comments
-
Sketch
-
Photos
Communications
-
Telemetry
-
Telephones
-
Radios
-
Other comments
-
Sketch
-
Photos
Power Supply
-
Normal
-
Standby
-
Other comments
-
Sketch
-
Photos
Instrumentation
-
Pnuematic piezometers
-
Vibrating Wire piezos
-
Standpipes
-
Survey targets
-
Seepage weirs
-
Other comments
-
Photos
-
Sketch
Surveillance
-
Consequence Category
-
Rainfall
-
Rainfall observation frequency meets ANCOLD guidelines
-
Storage Level
-
Storage Level Observation frequency meets ANCOLD guidelines
-
Seepage
-
Seepage Observation frequency meets ANCOLD guidelines
-
Seepage Analysis
-
Seepage Analysis observation frequency meets ANCOLD guidelines
-
Pore Water Pressure
-
Pore water pressure observation frequency meets ANCOLD guidelines
-
Surface Displacement
-
Surface Displacement observation frequency meets ANCOLD guidelines
-
Internal displacement
-
Internal displacement observation frequency meets ANCOLD guidelines
-
Seismological
-
Seismological observation frequency meets ANCOLD guidelines
-
Telemetry
-
Telemetry observation frequency meets ANCOLD guidelines
-
Visual Inspections
-
Visual Inspection observation frequency meets ANCOLD guidelines
-
Other comments