Information
-
Type of dam: Concrete arch
-
Dam height: 34.9 m
-
FSL gauge board 24.40 m
-
FSL EL 220.08 mAHD
-
Capacity at FSL 4510 ML
-
Type of spillway: None
-
Conducted on
-
Last Inspection conducted
-
Prepared by
-
Location
-
Inspection Party
-
If the response is then show
- Peter Tsoukalas, Senior Asset Planner Dams headworks
- Stewart Dahms, Acting Asset Planner Dams Headworks
- Eric Pepe, C&M Millbrook
- Alex Przygoda, C&M Millbrook
- Dylan Ribbons, Acting Asset Planner Dams Headworks
- Lisa Blinco, SA Water Control Room
- Eric VonWielligh, Project Manager
Add Auditor
Operational Status at time of inspection
-
Storage Level Gauge board (m)
-
Storage Level mAHD FSL
-
Water in storage ML
-
Releases via outlet ML/day (treatment plant demand)
-
Other Comments
-
Photos
-
Sketch
Conditions at time of inspection
-
Weather
-
Estimated Max Temperature degrees celsius
-
Sky
-
Wind
-
Rain
-
Days since last rain
-
Other Comments
-
Photos
-
Sketch
Dam Safety Management
-
O&M Manual on Site
-
O&M Manual Reviewed
-
Dam Safety Emergency Plan on Site
-
Dam Safety Emergency Plan reviewed
-
Drawings on site
-
Operator Knowledge
-
Operator Training
-
Other Comments
-
Photos
-
Sketches
Crest
Concrete
-
Cracking
-
Dimension between monitoring pins position A RHS mm
-
Dimension between monitoring pins position B LHS mm
-
Spalling
-
Deterioration
-
Joints
-
Misalignment
-
Guard fence
-
Other comments
-
Photos
-
Sketch
Downstream Face
Concrete
-
Cracking
-
Gauge reading postion A (END) (Opening closing across crack) mm
-
3D Gauge reading postion B (TOP) (Vertical displacement across crack) mm
-
3D Gauge reading postion C (SIDE) (Transverse displacement US-DS) mm
-
Spalling
-
Deterioration
-
Joints
-
Misalignment
-
Seepage on face
-
Seepage at toe
-
Other Comments
-
Photos
-
Sketch
Upstream Face
Concrete
-
Cracking
-
Spalling
-
Deterioration
-
Joints
-
Misalignment
-
Other comments
-
Photos
-
Sketch
Abutments
-
Seepage
-
Cracks
-
Slides
-
Vegetation
-
Other Comments
-
Photos
-
Sketch
Area Downstream of Dam
-
Seepage
-
Subsidence
-
Bulges
-
Vegetation
-
Other comments
-
Photos
-
Sketch
Catch Drain
-
Embankment
-
Channel
-
Vegetation
-
Exit to Yettie Creek
-
Other Comments
-
Photos
-
Sketch
Inlet works
Barossa Weir
-
Date inspected
-
Crest
-
Downstream face
-
Upstream face
-
Abutment blocks
-
Area downstream
-
Scour valve
-
Upstream trashrack
-
Environmental flow valve
-
Pipework and valve
-
Comments
-
Photos
-
Sketch
Inlet tunnel
-
Date inspected
-
Comments
-
Photos
-
Sketch
Inlet Channel
-
Date inspected
-
headwall
-
Grille
-
Concrete channel
-
Comments
-
Photos
-
Sketch
Outlet Works
-
Inlet Screens
-
Screen Cleaning
-
Outlet pipes
-
Valves
-
Operation platform
-
Valve operating house
-
valve chamber
-
Scour dissipator
-
Cathodic protection
-
Other Comments
-
Photos
-
Sketch
Syphon outlet works
-
Inlet Screens
-
Pipework
-
Valves
-
Operation platform
-
Other Comments
-
Photos
-
Sketch
Outlet Works Operation
Top outlet valve (BS1)
-
Top outlet valve (BS1) status
-
Top outlet valve (BS1) tested
-
Top outlet valve (BS1) last tested
-
Top outlet valve (BS1) test satisfactory
-
Comments
-
Photos
Middle outlet valve (BS2)
-
Middle outlet valve (BS2) Status
-
Middle outlet valve (BS2) tested
-
Middle outlet valve (BS2) last tested
-
Middle outlet valve (BS2) test satisfactoy
-
Comments
-
Photos
Bottom outlet valve (BS3)
-
Bottom outlet valve (BS3) Status
-
Bottom outlet valve (BS3) tested
-
Bottom outlet valve (BS3) last tested
-
Bottom outlet valve (BS3) test satisfactory
-
Comments
-
Photos
Isolating valve (BS4)
-
Isolating valve (BS4) status
-
Isolating valve (BS4) MB2 tested
-
Isolating valve (BS4) last tested
-
Isolating valve (BS4) test satisfactory
-
Comments
-
Photos
Stop valve in chamber (BS6)
-
Stop valve in chamber (BS6) Status
-
Stop valve in chamber (BS6) tested
-
Stop valve in chamber (BS6) last tested
-
Stop valve in chamber (BS6) tested satisfactory
-
Comments
-
Photos
Scour valve (BS15)
-
Scour valve (BS15) status
-
Scour valve (BS15) tested
-
Scour valve (BS15) last tested
-
Scour valve (BS15) test satisfactory
-
Comments
-
Photos
Syphon valve (BS10)
-
Syphon valve (BS10) status
-
Syphon valve (BS10) tested
-
Syphon valve (BS10) last tested
-
Syphon valve (BS10) test satisfactory
-
Comments
-
Photos
-
Comments
-
Photos
-
Sketch
Instrumentation
-
Gauge board
-
Survey Pillars
-
Survey pins
-
Crack monitoring
-
Open standpipes
-
Comments
-
Photos
-
Add drawing
Reservoir
-
Landslips around rim
-
Boat Ramp
-
Other Reservoir observations
-
Photos
-
Sketch
Access to Dam
-
Left abutment
-
Right abutment
-
Access to dam photos
-
Other access to dam notes
Communications
-
Telephones
-
Radios
-
Telemetry
-
Other comments
-
Photos
-
Sketch
Power Supply
-
Normal
-
Standby
-
Other comments
-
Photos
-
Sketch
Surveillance
-
Rainfall
-
Rainfall observation frequency meets ANCOLD guidelines
-
Storage Level
-
Storage Level Observation frequency meets ANCOLD guidelines
-
Seepage
-
Seepage Observation frequency meets ANCOLD guidelines
-
Seepage Analysis
-
Seepage Analysis observation frequency meets ANCOLD guidelines
-
Pore Water Pressure
-
Pore water pressure observation frequency meets ANCOLD guidelines
-
Surface Displacement
-
Surface Displacement observation frequency meets ANCOLD guidelines
-
Internal stress
-
Internal stress observation frequency meets ANCOLD guidelines
-
Seismological
-
Seismological observation frequency meets ANCOLD guidelines
-
Telemetry
-
Telemetry observation frequency meets ANCOLD guidelines
-
Visual Inspections
-
Visual Inspection observation frequency meets ANCOLD guidelines
-
Other comments
-
Photos
-
Sketch