Information

  • Type of dam: Concrete arch

  • Dam height: 34.9 m

  • FSL gauge board 24.40 m

  • FSL EL 220.08 mAHD

  • Capacity at FSL 4510 ML

  • Type of spillway: None

  • Conducted on

  • Last Inspection conducted

  • Prepared by

  • Location
  • Inspection Party

  • If the response is then show

  • Add Auditor

Operational Status at time of inspection

  • Storage Level Gauge board (m)

  • Storage Level mAHD FSL

  • Water in storage ML

  • Releases via outlet ML/day (treatment plant demand)

  • Other Comments

  • Photos

  • Sketch

Conditions at time of inspection

  • Weather

  • Estimated Max Temperature degrees celsius

  • Sky

  • Wind

  • Rain

  • Days since last rain

  • Other Comments

  • Photos

  • Sketch

Dam Safety Management

  • O&M Manual on Site

  • O&M Manual Reviewed

  • Dam Safety Emergency Plan on Site

  • Dam Safety Emergency Plan reviewed

  • Drawings on site

  • Operator Knowledge

  • Operator Training

  • Other Comments

  • Photos

  • Sketches

Crest

Concrete

  • Cracking

  • Dimension between monitoring pins position A RHS mm

  • Dimension between monitoring pins position B LHS mm

  • Spalling

  • Deterioration

  • Joints

  • Misalignment

  • Guard fence

  • Other comments

  • Photos

  • Sketch

Downstream Face

Concrete

  • Cracking

  • Gauge reading postion A (END) (Opening closing across crack) mm

  • 3D Gauge reading postion B (TOP) (Vertical displacement across crack) mm

  • 3D Gauge reading postion C (SIDE) (Transverse displacement US-DS) mm

  • Spalling

  • Deterioration

  • Joints

  • Misalignment

  • Seepage on face

  • Seepage at toe

  • Other Comments

  • Photos

  • Sketch

Upstream Face

Concrete

  • Cracking

  • Spalling

  • Deterioration

  • Joints

  • Misalignment

  • Other comments

  • Photos

  • Sketch

Abutments

  • Seepage

  • Cracks

  • Slides

  • Vegetation

  • Other Comments

  • Photos

  • Sketch

Area Downstream of Dam

  • Seepage

  • Subsidence

  • Bulges

  • Vegetation

  • Other comments

  • Photos

  • Sketch

Catch Drain

  • Embankment

  • Channel

  • Vegetation

  • Exit to Yettie Creek

  • Other Comments

  • Photos

  • Sketch

Inlet works

Barossa Weir

  • Date inspected

  • Crest

  • Downstream face

  • Upstream face

  • Abutment blocks

  • Area downstream

  • Scour valve

  • Upstream trashrack

  • Environmental flow valve

  • Pipework and valve

  • Comments

  • Photos

  • Sketch

Inlet tunnel

  • Date inspected

  • Comments

  • Photos

  • Sketch

Inlet Channel

  • Date inspected

  • headwall

  • Grille

  • Concrete channel

  • Comments

  • Photos

  • Sketch

Outlet Works

  • Inlet Screens

  • Screen Cleaning

  • Outlet pipes

  • Valves

  • Operation platform

  • Valve operating house

  • valve chamber

  • Scour dissipator

  • Cathodic protection

  • Other Comments

  • Photos

  • Sketch

Syphon outlet works

  • Inlet Screens

  • Pipework

  • Valves

  • Operation platform

  • Other Comments

  • Photos

  • Sketch

Outlet Works Operation

Top outlet valve (BS1)

  • Top outlet valve (BS1) status

  • Top outlet valve (BS1) tested

  • Top outlet valve (BS1) last tested

  • Top outlet valve (BS1) test satisfactory

  • Comments

  • Photos

Middle outlet valve (BS2)

  • Middle outlet valve (BS2) Status

  • Middle outlet valve (BS2) tested

  • Middle outlet valve (BS2) last tested

  • Middle outlet valve (BS2) test satisfactoy

  • Comments

  • Photos

Bottom outlet valve (BS3)

  • Bottom outlet valve (BS3) Status

  • Bottom outlet valve (BS3) tested

  • Bottom outlet valve (BS3) last tested

  • Bottom outlet valve (BS3) test satisfactory

  • Comments

  • Photos

Isolating valve (BS4)

  • Isolating valve (BS4) status

  • Isolating valve (BS4) MB2 tested

  • Isolating valve (BS4) last tested

  • Isolating valve (BS4) test satisfactory

  • Comments

  • Photos

Stop valve in chamber (BS6)

  • Stop valve in chamber (BS6) Status

  • Stop valve in chamber (BS6) tested

  • Stop valve in chamber (BS6) last tested

  • Stop valve in chamber (BS6) tested satisfactory

  • Comments

  • Photos

Scour valve (BS15)

  • Scour valve (BS15) status

  • Scour valve (BS15) tested

  • Scour valve (BS15) last tested

  • Scour valve (BS15) test satisfactory

  • Comments

  • Photos

Syphon valve (BS10)

  • Syphon valve (BS10) status

  • Syphon valve (BS10) tested

  • Syphon valve (BS10) last tested

  • Syphon valve (BS10) test satisfactory

  • Comments

  • Photos

  • Comments

  • Photos

  • Sketch

Instrumentation

  • Gauge board

  • Survey Pillars

  • Survey pins

  • Crack monitoring

  • Open standpipes

  • Comments

  • Photos

  • Add drawing

Reservoir

  • Landslips around rim

  • Boat Ramp

  • Other Reservoir observations

  • Photos

  • Sketch

Access to Dam

  • Left abutment

  • Right abutment

  • Access to dam photos

  • Other access to dam notes

Communications

  • Telephones

  • Radios

  • Telemetry

  • Other comments

  • Photos

  • Sketch

Power Supply

  • Normal

  • Standby

  • Other comments

  • Photos

  • Sketch

Surveillance

  • Rainfall

  • Rainfall observation frequency meets ANCOLD guidelines

  • Storage Level

  • Storage Level Observation frequency meets ANCOLD guidelines

  • Seepage

  • Seepage Observation frequency meets ANCOLD guidelines

  • Seepage Analysis

  • Seepage Analysis observation frequency meets ANCOLD guidelines

  • Pore Water Pressure

  • Pore water pressure observation frequency meets ANCOLD guidelines

  • Surface Displacement

  • Surface Displacement observation frequency meets ANCOLD guidelines

  • Internal stress

  • Internal stress observation frequency meets ANCOLD guidelines

  • Seismological

  • Seismological observation frequency meets ANCOLD guidelines

  • Telemetry

  • Telemetry observation frequency meets ANCOLD guidelines

  • Visual Inspections

  • Visual Inspection observation frequency meets ANCOLD guidelines

  • Other comments

  • Photos

  • Sketch

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.