Title Page
-
Project Name
-
Job Number
-
DCU Number
- DCU 01
- DCU 02
- DCU 03
- DCU 05
- DCU 06
- DCU 07
- DCU 08
- DCU 11
- DCU 14
- Hire DCU
- Hire Modular Decontamination Unit (MSDU)
-
Date
-
Demo One Site Supervisor
Daily DCU Checks
Daily DCU AM Checks
-
The following daily operational checks MUST be carried out by a Demo One Site Supervisor before the beginning of the shift:
-
Inspection Time
-
Adequate supplies of water, gas and electricity
-
Take photo (optional)
-
Sufficient lighting to all areas and mirror in place
-
Take photo (optional)
-
Adequate shower pressure and temperature
-
Shower rosettes not blocked, system clear and water running at a constant temperature.
-
Shower holders are fit for purpose and allow for hands free decontamination and cleaning.
-
Take photo (optional)
-
Correct operation of heating system
-
Correct operation of air extraction NPU, including checks to the pressure gauge/warning device to ensure the HEPA filter has not become saturated
-
Take photo (optional)
-
Waste water filtration system working with clean filter and water disposed of correctly. Please note day and date of when the filter was last changed
-
Take photo (optional)
-
Functioning battery charger units and CO monitor
-
Take photo (optional)
-
Provision of sufficient waste bags in dirty end, shower gel, nail brushes and towels in clean end
-
Take photo (optional)
-
Cleanliness and correct signage of DCU
-
Take photo (optional)
-
The integrity of self closing doors and airlocks
-
Take photo (optional)
-
Confirm there are no environmental conditions that may affect the use of the DCU facilities e.g. frozen pipes, black ice on shower floor, stagnant standing water (legionella) etc.
-
Adequately earthed and testing of residual current devices (RCDs)
-
Visual check of electrical equipment for obvious defects e.g. damage, wear, overheating etc.
-
Take photo (optional)
-
Correct documentation on display and in date e.g. latest air test clearance, certificates for DOP test, electrical inspection and Gas Safe service
Daily DCU PM Checks
-
The following daily operational checks MUST be carried out by a Demo One Site Supervisor before the end of the shift:
-
Inspection Time
-
Adequate supplies of water, gas and electricity
-
Sufficient lighting to all areas and mirror in place
-
Adequate shower pressure and temperature
-
Shower rosettes not blocked, system clear and water running at a constant temperature.
-
Shower holders are fit for purpose and allow for hands free decontamination and cleaning.
-
Correct operation of heating system
-
Correct operation of air extraction NPU, including checks to the pressure gauge/warning device to ensure the HEPA filter has not become saturated
-
Waste water filtration system working with clean filter and water disposed of correctly
-
Functioning battery charger units and CO2 monitor
-
Provision of sufficient waste bags in dirty end, shower gel, nail brushes and towels in clean end
-
Correct operation of vacuum cleaner, supply of sponges and water baths/handheld sprayers in any transit airlock provided
-
The integrity of self closing doors and airlocks
-
Cleanliness and correct signage of DCU, transit route and airlocks
-
Confirm there are no environmental conditions that may affect the use of the DCU facilities e.g. frozen pipes, black ice on shower floor etc.
-
Adequately earthed and testing of residual current devices (RCDs)
-
Visual check of electrical equipment for obvious defects e.g. damage, wear, overheating etc.
-
Correct documentation on display and in date e.g. latest air test clearance, certificates for DOP test, electrical inspection and Gas Safe service
Site Supervisor Sign Off
-
If only one shift of checks was applicable then please tick the boxes for the other shift to confirm all was okay and secure on arrival/departure
-
Photo of the DCU in current location
-
Demo One Site Supervisor to sign on completion of the checks