Information
-
Document No.
-
Audit Title
-
NMI#
-
Conducted on
-
Prepared by
-
Location
-
Photo of site
-
Tech being audited
-
Audit type
-
Date/time of audit
-
Job type
pre-job assessment
-
Inspect site for possible hazards
-
Contact customer (if applicable)
-
confirm safe access to service point / meter board
-
Confirm meter serial number(s) match job sheet / palm pilot
Job completion
-
Read and record meter reading(s)
-
Put on low voltage glove(s), outer protective glove(s) & safety glasses
-
Use an approved fibreglass ladder and/or insulated mat (if required)
-
Remove service point cover seal
-
Remove service point cover
-
Remove fuse cartridge
-
Open fuse cartridge and remove service fuse
-
Close fuse cartridge and re-insert into service point
-
Replace service point cover and re-seal
Finish and vacate site
-
Tidy area including remove old seals from bottom of meter box
-
Complete "disconnection notice" and give to customer or place in letter box, under front door, in meter box
-
vacate site
-
Tech being audited
-
Auditor