Information

  • Document No.

  • Audit Title

  • NMI#

  • Conducted on

  • Prepared by

  • Location
  • Photo of site

  • Tech being audited

  • Audit type

  • Date/time of audit

  • Job type

pre-job assessment

  • Inspect site for possible hazards

  • Contact customer (if applicable)

  • confirm safe access to service point / meter board

  • Confirm meter serial number(s) match job sheet / palm pilot

Job completion

  • Read and record meter reading(s)

  • Put on low voltage glove(s), outer protective glove(s) & safety glasses

  • Use an approved fibreglass ladder and/or insulated mat (if required)

  • Remove service point cover seal

  • Remove service point cover

  • Remove fuse cartridge

  • Open fuse cartridge and remove service fuse

  • Close fuse cartridge and re-insert into service point

  • Replace service point cover and re-seal

Finish and vacate site

  • Tidy area including remove old seals from bottom of meter box

  • Complete "disconnection notice" and give to customer or place in letter box, under front door, in meter box

  • vacate site

  • Tech being audited

  • Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.