Information
-
Site Name
-
Installation engineer:
- Russell Benson
- Freey Makore
- Edward Blackwell
- Irtiza Mumtaz
- Abu Hassan
- Contractor
-
Company Name
-
Engineer 1
-
Engineer 2
-
Select date
Site InstallationDetails
-
Site Installation Work
- Rectifier system installation/Power cabling
- Tier III installation
- Microwave installation
- Router installation
- Switch Installation
Rectifier system installation
-
Rectifier type
- Enatel Compact
- Enatel Flexi
- 1 battery bank
- 2 battery banks
-
Rectifier photo
-
Battery photo
-
Battery Breaker Installation
-
Comments*
-
Add media
-
MCB Panel Installation
-
Comments*
-
Add media
AC/DC Installation Quality Check Sheet
-
AC mains checked and value at acceptable levels (220~240v)
-
Health check conducted for the rectifier and associated breaker panels. Output voltage levels etc
-
Rectifier, battery shelves are fastened properly in the rack
-
Breaker panels are properly installed
-
All cables terminated are properly sleeved and protected with heat shrinks
-
All power cables are properly labeled
-
Pictures of power cables termination, connectors, and labelling.
Tier III DMR installation
-
Repeaters
Repeater
-
Repeater model
-
Asset number
-
Serial number
-
Channel 1
-
-
Channel 2
-
-
Repeater photo(s) Front and rear
-
RF Installation - Antenna/Feeders
-
Description of work:
-
Add media
-
RF Installation - Combiner
-
Description of work:
-
Add media
-
RF Installation - Filters
-
Description of work:
-
Add media
-
RF cabelling
-
Description of work:
-
Add media
-
RF Filter tuning
-
Number of Channels tuned and the channel ID
Radio Installation Quality Check Sheet
-
Radios are fastened properly in the rack
-
All radios are properly labeled with correct channels
-
All BNC/N connectors are crimped and terminated correctly with proper tighthning
-
All cables are labelled
-
Pictures of BNC/N connectors on both sides, labelling,.
Switch Installation
-
Switch model
-
Switch model
-
Asset number
-
Serial number
-
Add media
Switch Installation Quality Check Sheet
-
Switch is fastened properly in the rack
-
IP diagram has been followed and all changes are recorded in red line diagram
-
Ethernet cabling is labelled for all connecting devices
-
Picture of ethernet cable connections on switch, labelling
Router Installation
-
Router model
-
Router Model
-
Asset number
-
Serial number
-
Add media
Router Installation Quality Check Sheet
-
is fastened properly in the rack
-
IP diagram has been followed and all changes are recorded in red line diagram
-
Ethernet cabling is labelled for all connecting devices
-
Picture of ethernet cable connections on switch, labelling
-
Comments
-
Additional pictures required Overview of the power rack Overview of the equipment rack Close-up of mains distribution Rectifier power socket Overview of the equipment room Outside building photo(s) Tower photo(s)