Information
-
Site Name
-
Installation Engineers(s)
- Russell Benson
- Freey Makore
- Edward Blackwell
- Irtiza Mumtaz
- Contractor
- Abu Hassan
-
Company Name
-
Engineer 1
-
Engineer 2
-
Installation Date and Starting time
Site Access Changes
-
Access type
- Card access
- Key access
- Others
-
Key number example:AXO or L3A
-
Vehicle access
- 2WD
- 4WD only
- Suitable for Trucks
-
Are there any changes to existing site access details
-
Please provide details
-
Pictures (if required)
Checklist
-
Co-Location Site Owner site log on
-
Health & Safety checks
-
Site cleanliness check (Please take pictures if there are any issues)
-
Clear pictures
-
Photos of pre-installation site condition taken
-
Pictures of a general overview of the equipment room
-
All required equipment on-hand and undamaged
-
All required documentation on-hand
-
Any issues identified that prevent installation? <br>Note: If yes, escalate to TeamTalk PM<br>
-
Installer's comments