Information

  • Viscore ID:

  • Address

  • Prepared by:

  • Company Name

  • Enter Name

  • Select date

Customer / Job Details

  • Customer or requester was available at the time of scope?

ROW Scope Check List & Decision Tree

  • Connection Type

  • How many houses down this ROW

  • MDU/ROW Class 1

  • MDU/ROW Class 2

  • MDU/ROW Class 3

  • Clearly mention all House numbers in the ROW

  • Select Main ROW Build Methodology

  • Take photo(s) clearly showing the property is an SDU

  • Additional Comments

  • How many houses are aerially fed?

  • Take photo(s) clearly showing the property has existing aerial connection

  • Check all aerial infrastructure is available. Is there any aerial network required? Are there any underground connections in this ROW to consider? Is it being fed from across the road? Do we need a RAT or RAT tail?

  • Check movement of existing copper cables. Are the pits clear of debris? Will there be any replacement, blockages or SH&E requirements etc. to consider?

  • Explain why? Have you considered the lowest impacting route? Are the transitions between surfaces possible, can the bending radius be maintained etc.

  • Explain why? Are there any surface mount options available? Why were they not used? Are the transitions between surfaces possible, can the bending radius be maintained etc.

  • Explain why? Are there any surface mount or soft surface options available? Why were they not used? Have you considered the lowest impacting route? Are the transitions between surfaces and changes in direction possible, can the bending radius be maintained etc?

  • Explain why you are not able to utilise any other option? Ensure any pilot, entry/exit holes are considered, planned and identified clearly. Have all other utility lay lines been identified for the proposed route?

  • Explain why you are not able to utilise any other option. Ensure the entire route has been identified clearly. Have all other utility lay lines been identified for the proposed route?

  • Explain why you are not able to utilise any other option. Ensure the entire route has been identified clearly. Have all other utility lay lines been identified for the proposed route?

  • Terminal installation required? (e.g IFDB. OFDCs, RATs etc)

  • Type of terminal? (e.g IFDB. OFDCs, RATs etc)

  • Aerial copper/fibre route available for Houses in ROW/MDU?

  • Number of houses fed aerially and their addresses. Take pictures for record

  • Check for existing ducts.<br>Existing ducts available? Visually check ducts at drop off location, hand holes, pits, ETPs and take pictures for record.

  • Number of houses connected with ducts and their addresses. Take pictures of ducts at both ends (if possible) and identify the location in aerial view

  • Fence available and suitable to build the new fibre infrastructure (e.g ruggedized duct, 20mm/32mm HDPE ducts)?

  • Fence Type

  • Fence Type

  • Soft surface available for trenching and installing new fibre infrastructure?

  • Drive way/ walk way available and suitable for micro trench?

  • Type of surface

  • Type of surface

  • Drilling/hard surface trenching required for new fibre infrastructure?

Scoping Details

  • NETMAP view available in job pack identifying the drop off location?

  • Drop off located as per NETMAP?

  • Take photo(s) of drop off clearly showing number of tubes & location relative to ROW landmarks.

  • Takes photos as required for possible drop off options, provide frontage & reinstatement measurements to consider new drop off lateral.

  • Step by step description of build. Format x-y, activity, distance, infrastructure; e.g. 1-2, T in grass 5m, 3xR Key: H -haul; SM – Surface mount; MT - microtrench; T - trench; LL - lift & lay; R - ruggedized; D - duct; FF - Fixed Fibre; G – Grass; GD – Garden; CS – Cobbles; S – Seal; C - concrete

  • Extensive outside boundary work required? (e.g creation of new drop off, extending existing drop off, extending pole to boundary network)

  • Explain Why? (e.g Extending the drop off from current location to communal driveway as no duct are available from current drop off to houses. Trenching for 10m in grass is required.

  • Attach pictures

  • Add Aerial view for planned work

  • Add photos for design. Blue - existing; Red - build; Purple - future or for provisioning.

  • Will the ROW be serviced via ABF, fixed fibre or aerially?

  • Take photo of servicing FAT or cabinet.

  • Where is the FAT/cabinet located? Distance from FAT or cabinet.

  • Is the POLE safe to climb?

  • Type of Pole

  • Explanatory notes identifying the condition of the pole and reasons for the pole to be unsafe.

  • Take photo of servicing OFDC or junction box.

  • Capture pole ID and where aerial feed is connected to.

  • Other requirements? I.e TMP, Arborist

  • Additional Notes

Health, Safety and Environmental Issues

  • Have existing utility corridors been considered using on site observations & plans as part of the scope?

  • Build work in close proximity to HV Electricity or HP gas equipment?

  • Working at heights?

  • Dogs on site?

  • Unprotected edge? e.g. Trench, depression or waterway

  • Enter further notes for HS&E risk elimination or mitigation, e.g chemicals or asbestos, confined spaces, gas detection requirements etc.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.