Site Name
-
Installation Engineers(s)
- Russell Benson
- Freey Makore
- Edward Blackwell
- Irtiza Mumtaz
- Abu Hassan
- Contractor
-
Company Name
-
Engineer 1
-
Engineer 2
-
Installation Date and Starting time
Checklist
-
Do you have Clear and legible documentation of all Schedule 5 Acceptance Tests:
-
a) IP Router commissioning tests
-
b) Base Station commissioning tests
-
c) Radio Frequency tests
-
d) Microwave bitrate tests
-
e) 1-2 km distance call tests
-
Clear and legible documentation (photos/sketches) to provide details for the five requested designs:
-
a) Site Layout
-
b) Building Layout
-
c) Tower Layout
-
d) Rack Layout
-
e) Power Single Line Diagram
-
As-Built / Red-Lines supplied
-
a) IP Site Design
-
b) DMR Tier-3 Single Line Diagram
-
Co-Location Site Owner site log off
-
TeamTalk site log off
-
Installer's comments