Information

  • Site Name

  • Installation Engineers(s)

  • Company Name

  • Engineer 1

  • Engineer 2

  • Installation Date and Starting time

Checklist

  • Do you have Clear and legible documentation of all Schedule 5 Acceptance Tests:

  • a) IP Router commissioning tests

  • b) Base Station commissioning tests

  • c) Radio Frequency tests

  • d) Microwave bitrate tests

  • e) 1-2 km distance call tests

  • Clear and legible documentation (photos/sketches) to provide details for the five requested designs:

  • a) Site Layout

  • b) Building Layout

  • c) Tower Layout

  • d) Rack Layout

  • e) Power Single Line Diagram

  • As-Built / Red-Lines supplied

  • a) IP Site Design

  • b) DMR Tier-3 Single Line Diagram

  • Co-Location Site Owner site log off

  • TeamTalk site log off

  • Installer's comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.