Information

  • Site Name

  • Far end

  • Survayor Name

  • Company Name

  • Engineer 1

  • Engineer 2

  • Installation Date and Starting time

Site Access Changes

  • Site Owner

  • Site owner name:

  • Access type

  • Key number example:AXO or L3A

  • Vehicle access

  • Are there any changes to existing site access details

  • Please provide details

  • General comments: like • Track conditions, any potential hazards) etc

  • Pictures (if required)

Line of Sight

  • Site Coordinates Note: Take coordinates as close as possible to the mast/pole/tower

  • Far end site name

  • Azimuth (heading from the site to the far end site)

  • Pictures in the direction of the far site. Take multiple pictures at different zooming levels starting from normal zoom to highest zoom availabel)

  • Line of site clear to far end from ground level?

  • Please give details of why the line of sight is not clear and the description of terrane. What obstacles in the way? i.e. trees, hills, structures etc Details of near and distant points of interest. i.e. buildings, hills, recognisable landmarks

  • Pictures of identified objectsblocking the line of sight

  • Suggest if survey at height could establish LOS?

  • Installing a new pole/mast/tower could establish a line of site?

  • Details of potential install locations on/near the site, incl distance from existing site buildings

  • Picture of suggested location for new mast/pole/tower with reference from the existing infrastructure.

  • Suggest other options to connect this site with the existing far end or a change in microwave plan etc

  • Take picture of site surroundings every 45 degree starting from 0 to 215 degrees

Deatails of existing structure on site

  • Type of structure

  • Conduct the following test/inspections: Does it pass all tests and conditions?<br>1. Tap/hammer test to assess the condition of the pole<br>2. The exterior surface condition of the pole (rot, wear, split, chunks, etc)<br>3. Lean of pole & direction of lean<br>4. Pole base installation condition

  • What test/condition did it fail?

  • Supporting pictures

  • 1. Potential for twist Action<br>2. Assessment of guy anchors<br>a. Condition<br>b. Angles<br>c. Number of and location relative to mounts

  • What test/condition did it fail?

  • Supporting pictures

  • Height of Tower/Pole/mast

  • General condition of mast/tower/pole ?

  • Is it safe for climbing?

  • Required method of Climbing?

  • Pictures of available climbing options on site

  • Resong why it's not safe to climb the site? Please give detailed desciption and alternatives to climb.

  • Supporting pictures

  • Pictures of mast/pole/tower from four sides

  • Antenna mounts available for the installation of MW dish?

  • Provide details: 1. At least two locations required, if possible 2. Height of each mount 3. Mounting types required 4. Identification of neighbouring antenna(s) to mount position(s) (Include Photos)

  • Pictures of existing mount(s)

  • 1. Assessment of cable run path for Coax cable (Trenches, ducts, overhead cable trays, etc, as relevant - Include Photos) o Length(m) o Angles/number of bends o Capacity/free space/Cable Entry

  • Picture of suggested cable route

  • Suggested type, height and location of new mpount to be installed.

  • Supporting pictures

  • 1. Assessment of cable run path for Coax cable (Trenches, ducts, overhead cable trays, etc, as relevant - Include Photos) o Length(m) o Angles/number of bends o Capacity/free space/Cable Entry

  • Picture of suggested cable route

  • General comments about site overall condition and any hazzards.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.