Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Operative being assessed
General requirements
-
Prior to commencing any work ensure that the following documentation is available and authorised where
appropriate.
1. Job instructions
2. Routine / Non-Routine operation procedures
3. Permit to work
Tools and equipment
-
Where there is a known back feed i.e. the main is two way fed:
-
2 No. Squeeze-off units – Hydraulic, or service type<br>for 63mm PE.
-
Bypass.
-
Pressure gauges
-
Metallic vent pipes, flame traps,<br>earthing straps and pressure points.<br>
-
Clean, damp, on-synthetic cloths, paper towelling<br>and water
-
Expanding pipe stoppers.
-
PE pipe cutters/saw.
-
Squeeze-off tape.
-
Re-rounding clamp.
Pipe & fittings preparation:
-
Thoroughly clean the main where the squeeze-off and joints are to be made
-
Check diameter, Standard Dimension Ratio (SDR). Material type – information will be printed along <br>the pipe barrel at 1m intervals on each side of the pipe. Check then pipe for ovalty and re-round as<br>required.
-
All equipment must be checked, prepared and available for the work to be undertaken.
-
Ensure the correct distance is maintained from the existing fittings, joints, squeeze-off applied<br>locations and any proposed future joints used for connection purposes.
-
Set out the squeeze-off operation by marking the exposed pipe with all positions for pressure<br>points, by-pass connections, vent points, rider points and location of squeeze-off.
Establish network pressure:
-
Install two pressure monitoring points on the PE main either side of the proposed flow stop section<br>of pipe
-
Attach and commission pressure gauges.
-
Confirm Network pressure as specified within range of single squeeze-off operation, 75mbr for main <br>up to and including 180mm diameter, and 2bar for mains up to and including 63mm diameter.
Assemble by-pass & by pass vents:
-
Construct the bypass in size and material as per written procedures.
-
Prior to tapping the main the bypass must be pressure tested with valves A and B in the open<br>position with the vent pipes capped off above the vent valves C and D, these vent valves must be <br>left in the open position. The bypass must be pressure tested to 350mbr, for 15 minutes. No <br>pressure loss is accepted. On successful completion of the test the vents C and D must be closed,<br>and the vent pipes erected. Close valves A and B, the main can now be drilled.
-
Vent pipes must be constructed as per Section H1, (SGN/WI/ML/2), and protrude 2.5m above the<br>ground level. Metallic vent pipes must be earthed using approved electrical earth rods and straps <br>from the metallic vent pipes to earth. Vent pipes must be adequately supported.
Commission bypass
-
It is important that the bypass is confirmed free from blockages by purging both ways. Check all <br>valves are closed, check network pressure.
-
Open vent valve C, then open bypass valve A,
-
Purge until two independent readings of 90% gas in air have been obtained from vent C, then close<br>vent valve C and bypass valve A.
-
Open vent valve D then bypass valve B.
-
Purge until two independent readings of 90% gas in air have been obtained from vent valve D. Close<br>vent valve D.
-
Open bypass valve A slowly and pressurise to network pressure.
-
Fittings not tested must be checked for soundness with approved leakage detection fluid, washing<br>off pipe and fittings with clean water afterwards
-
The bypass is now fully commissioned.
Squeeze-off preparation
-
Place squeeze-off units, 1 and 2, on the parent main at the marked positions.
-
Fit and connect vent E onto parent main upstream of squeeze-off 1 ensuring minimum distances <br>from squeeze-off position and future tie-ins.
-
Check squeeze-off units are in good working order.
-
Set the stops to the correct pipe size and SDR. If the SDR of the pipe cannot be found, then set the<br>stops to the size of pipe. For 90mm and 125mm SDR 17.6 pipe it is necessary to set the stops to one<br>size below i.e. 125mm to 90mm and 90mm to 63mm.
Squeeze-off PE main:
-
Re-check Network pressure to confirm mains operating pressure.
-
Re-check bypass is fully open.
-
Slowly apply downstream squeeze-off unit 1, until it reaches its maximum position, monitoring the<br>pressures at both mains pressure points to ensure the pressure is not falling. Monitor the pressure <br>gauges for 10 minutes before proceeding. If the pressure starts to fall below that stated on the <br>written procedure release squeeze-off and inform the Operational Manager
-
Apply squeeze-off safety stops.
-
Slowly apply upstream squeeze-off 2. Continuously monitor pressure.
-
Apply squeeze-off safety stops.
-
Open valve E and check at the vent between the squeeze-off units to establish whether there is any <br>gas passing.
-
If no gas is passing continue with the operation
-
If gas is passing, refer to Section E1, (SGN/WI/ML/2)
Cut out PE main:
-
Drape damp cloths around the pipe and ensure they are in contact with the ground on each side of <br>the cut to prevent a spark from static electricity.
-
Cut pipe section as specified in the work instruction, continually monitor the network pressure and<br>the atmosphere within the cut-out area. The cutting of PE mains must only be undertaken using <br>approved equipment. Should a guillotine be used a re-rounding clamp should be put on the main <br>prior to joining.
-
Install expanding stoppers whilst preparing fittings for installation.
-
Remove expanding stoppers.
-
Install new section as specified in the work instruction and in accordance with Appendix D,<br>(SGN/WI/ML/2) Electrofusion.
Re-commission main:
-
Remove squeeze-off safety stops.
-
Monitor pressure gauges, open valve E, slowly release upstream squeeze-off 2 and purge through<br>vent pipe until two independent readings of 90% gas in air is obtained.
-
Turn of valve E and allow section to pressurise to line pressure.
-
Test installed fitting with leak detection fluid and wash off with clean water.
-
Slowly release downstream squeeze- off 1.
Bypass and vent point de-commission:
-
Slowly close valve B whilst monitoring the pressure.
-
Monitor mains pressure for 10 minutes to ensure the new section is supplying gas downstream<br>without any blockages.
-
Slowly close valve A and vent down bypass through vent C,
-
Disconnect vent pipe valve at C
-
Connect air supply at valve C, open valve D and direct purge to air at vent D.
-
Note. Air pressure must not exceed 1/3 of mains pressure.
-
Remove caps from the top of the top tees and reinstate PE cutter into main<br>at bypass. Pressure point and vent connections. Check seal using leak detection fluid.
-
Remove bypass, pressure points and vents. Install electrofusion cap on to<br>the outlet of the saddle fusion tees. Raise integral PE cutest and fit completion cap. Test <br>electrofusion cap with leak detection fluid. Wash off with clean water
-
Recover squeeze-off units 1 & 2, re-round PE main and apply squeeze-off<br>tape.
Follow Section E1, (SGN/WI/ML/2). for squeeze-offs passing gas and for other fault finding
Sign off
-
Name of assessor
-
Pass or refer for further training