  • DGSS0013 SITE SAFETY AUDIT SHEET Rev 11 - 05/02/2019

STANDARD INFORMATION

  • BRANCH MANAGER

  • CONTRACT MANAGER

  • SITE MANAGER / SUPERVISOR

  • SITE ADDRESS

  • CLIENT

  • JOBNUMBER

  • Dodd Group Undertaking Principal Contractor Duties

  • Dodd Group Undertaking Contractor Duties

  • Direct employees

  • Agency/Sub-contractor staff employed by Dodd Group

  • Is there a separate Dodd Group site office or dedicated Dodd Group notice board

CDM CONSTRUCTION PHASE PLAN - DOCUMENT AUDIT

  • Is there an appropriate CPP and has it been reviewed and approved by the Contracts Manager & QHSE ?

  • Are details of any amendments correctly recorded ?

  • Have operatives and visitors signed the daily Attendance Log DGP0062

SECTION 1: DESCRIPTION OF PROJECT

1.1 Project Description and Programme

  • Does the Plan correctly address the Project Description & Programme ?

  • Does the Plan effectively address site access and egress ?

  • Does the Plan identify hours of working ?

  • Does the Plan identify the timescales of the project ?

  • Does the Plan indicate if an HSE F10 notification is required ?

  • Is a copy of the relevant F10 available (if required) ?

1.2 Duty Holders

  • Does the Plan correctly identify the relevant Duty Holders ?

1.3 Existing Records and Plans

  • Does the Plan effectively address any existing records and plans ?

SECTION 2: MANAGEMENT OF THE WORK

2.1 Management Structure and Site Management

  • Does the Plan correctly identify the Management and Site Management Structure ?

2.2 Project Health, Safety and Environmental Aims

  • Are the Aims of the Project documented ?

2.3 Temporary Works

  • Are Temporary Works applicable to this site ?

2.4 Site Rules

  • Does the Plan effectively address Site Rules including PPE requirements ?

2.5 Arrangements to Ensure Co-operation Between the Project Team

  • Does the Plan effectively address arrangements to ensure effective Liaison, Communication, Exchange of Information and Monitoring ?

2.6 Arrangements for Selecting and Involving Workers

  • Does the Plan effectively address Selection, Consultation and Training Requirements ?

2.7 Site Inductions

  • Does the Plan effectively address Site Inductions ?

2.8 Welfare Facilities

  • Does the Plan effectively address welfare provisions for the site ?

2.9 Accident / First Aid Arrangements

  • Does the Plan effectively address Accidents and First Aid arrangements ?

  • Does the Plan name Emergency First Aid Trained Personnel ?

2.10 Fire, Emergency and Security Arrangements

  • Does the Plan effectively address Fire, Emergency and Site Security Arrangements ?

  • Does the Plan provide details of the nearest Hospital with an A&E Department and details of how to get to it ?

SECTION 3: CONTROL OF SPECIFIC SITE RISKS

  • Does the Plan effectively address Control Of Specific Site Risks? Ensure that only those that are applicable to the project are included.

SECTION 4: SAFE SYSTEMS OF WORK

  • Does the Plan effectively address Safe Systems of Work ?

  • Does the Plan address Safe Electrical Isolation ?

  • Does the Plan effectively address which Permit to Work are required on site ?

PROJECT SHE FILE

Policy Documents

  • Is there a copy of the current Health & Safety Policy DGSS001 displayed or held within the file ?

  • Is there a copy of the current Quality Policy DGQMS0002 displayed or held within the file ?

  • Is there a copy of the current Environmental Policy DGES0002 displayed or held within the file ?

Section 1. Site Inductions

  • Does the Register of Subcontractors Form (DGSS124) list all subcontractors who are being utilised on site and their activity? Are the authorised & date columns being completed ?

  • Is there a Site Induction Record (DGSS015) for each operative (direct, agency and subcontractor) on site and is it filled out correctly (including CSCS card details) ?

  • Does the electronic Sub-Contract Induction Register & Training Record (DGSS104) list all operatives on site and shows their dates of training ?

  • Does DGSS104 monitor Subcontractors Plant & Equipment and their PPE ?

Section 2. Training

  • Is there a Safety Awareness Talk Programme (DGP063) that is appropriate to the project and is it being adhered to ?

  • Are there copies of all Safety Awareness Talks (DGSS012) either in the Project SHE File or held separately ?

  • Is there a separate Attendance Record (DGQMS0113) for each Safety Awareness Talk given and have they been signed by the participating operatives ?

  • Are there photocopies of all relevant specialist training certificates for operatives on site (direct, agency and subcontractor), e.g. PASMA, IPAF etc. ?

  • Does the site have adequate fist aid cover ?

  • Are there First Aid certificates for all EFAW qualified personnel on site ?

Section 3. Accident and Incident Reporting

  • Is there a copy of the current Accident & Incident Reporting Policy (DGSS021) ?

  • Is there an Accident Record Form (DGSS044) and are accidents being correctly logged onto it ?

  • Is there an Accident Book / Pack on site and readily available ?

Section 4. Near Miss Reporting

  • Is there a copy the current Near Miss Reporting Policy (DGSS022) ?

  • Are Near Miss Incidents being recorded on the Reporting Form DGSS020 ?

Section 5. Plant and Equipment

  • Is there a Planned Maintenance / Inspection Schedule (DGSS028) ?

  • Are there any Portable Appliance Test Records (DGSS051 or equivalent) ?

  • If required, are there copies of Mobile Tower Inspection Records (DGSS030) and Mobile Access Tower Inspection Checklist / Report (DGSS026) ?

  • If required, are there copies of Podium Inspection Records (DGSS173 & DGSS084) ?

  • If required, are there copies of the Ladders, Stepladders & Hop-Ups Inspection Sheet for Construction Use (DGSS027A) ?

  • If required, are records of the statutory 6 monthly thorough examination available for MEWPS ?

  • If required, are there copies of the Weekly MEWPS Inspection Records (DGSS078) ?

  • If required, are all items of Lifting Equipment (and accessories) subject to the required statutory "Thorough Examination" with certification retained ?

  • If required, are records available to verify that Pressure Systems (air compressor / receivers) are subject to the required statutory "Thorough Examinations" or that a "Written Scheme of Examination" exists ?

  • If required, are records available to confirm that Local Exhaust Ventilation (LEV) systems are subject to the required statutory "Thorough Examination" at the required frequency ?

  • Is there a copy of the Hand Arm Vibration Safety Guide DGSS052 ?

  • If required, have Vibration and Noise Calculations been produced using the following:<br>HAV Daily Vibration Exposure Record DGSS076A and DGSS076B (instructions).<br>Hand Arm Vibration & Noise Assessment Tool (DGSS077) ?

  • If Harness & Lanyards are being used on site, have the following been completed:<br>Harness & Lanyard Register of Users (DGSS086) ?<br>Harness & Lanyard Inspection Sheet (DGSS085) ?<br>(Note: a copy of the users Work at Height Certificates must be included in section 2)

Section 6. Safe Systems of Work

  • Have suitable and sufficient Risk Assessments been produced for all work activities ?

  • Have appropriate COSHH Assessments been conducted ?

  • Is there evidence that risk assessments have been reviewed as necessary ?

  • Are Material Safety Data Sheets available for hazardous substances used on site ?

  • Are all Method Statements correctly identified on the Register, DGSS119 ?

  • Is there evidence that these Method Statements have been reviewed (Using document DGSS067 or similar) ?

  • Are copies of Method Statements available for inspection and are they suitable and relevant to the task ?

  • Have all personnel who are involved in the works relevant to a specific Method Statement acknowledged the safe system of work on form DGSS123 ?

  • Is there a copy of the current Electrical Safe Isolation Procedure (DGSS121) held within the file ?

  • Where appropriate, has an Appointed Person been appointed by Senior Management and recorded on the "Appointment Of LV Appointed Person Form" (DGSS127) ?

  • Where appropriate, has the Appointed Person appointed an Authorised Person(s) and have they been individually recorded on the "Appointment Of LV Authorised Person Form" (DGSS122) ?

  • If requested by a third party to provide an electrical power supply, has the Dodd Group Appointed/Authorised Person completed the "Request For Supply Form" (DGSS143) ?

  • If requested by a third party to Isolate an electrical power supply, has the Appointed/Authorised Person completed the "Request For Electrical Isolation Form" (DGSS103) ?

  • Are Permits to Work correctly controlled and filed ?

Section 7. Temporary Works

  • Is there a copy of the current Temporary Works Procedure (DGSS034) held within the file ?

  • Where appropriate, is there a completed Temporary Works Appointments form relevant to the works (DGSS162) ?

  • Where appropriate, are Temporary Works Design Briefs completed (DGSS165) ?

  • Where appropriate, is there a Record of Design Brief Check/Approval of Temporary Works (DGSS166) ?

  • Are there relevant Competency Assessments (DGSS164) ?

  • Is there a Register of Temporary Works and does it appear to be up to date (DGSS163) ?

  • Are Temporary Works Trackers completed for all applicable works (DGSS167) ?

  • Are Permits to Load/Use/Unload/Strike/Dismantle being used and are they being used correctly (DGSS168) ?

Additional Items

  • If required, is a copy the Companies Current Insurance Certificate available ?

  • Is there a current Health & Safety Law Poster prominently displayed ?

  • Is the Accident Reporting Flow Chart displayed in the site cabin ?

  • If applicable, have Dodd Group produced a Waste Management Plan ?

  • Is there a Site Plan identifying Site Wide Elements ?

  • Have actions arising from previous Paperwork Audit been completed ?

SITE INSPECTION

1. Welfare Facilities

  • Are toilet, urinal & washing facilities adequate for the number of persons on site ?

  • Is there an effective hot & cold running water supply ?

  • Is there a soap or hand wash dispensing station ?

  • Are there sufficient and adequate means for drying hands, face etc. i.e. towel or air dryer ?

  • Have adequate changing/drying areas been provided ?

  • Is there fresh drinking water available ?

  • Is there any means to boil water ?

  • Is there any means to heat a meal ?

  • Is the lighting & heating in the welfare area adequate ?

  • Are welfare areas kept clean & tidy ?

2. First Aid

  • Is there a first aid box suitable located ?

  • Is the First Aid Box adequately stocked and the contents in date ?

3. Plant & Equipment

  • Are all power tools 110 volt or below ?

  • Are all power tools in good condition and any safety devices operating correctly ?

  • Are cables, transformers & splitter boxes in good condition ?

  • Are machine / tool safety guards in good condition ?

  • Is it clear that the right plant & equipment is being used for the job ?

  • Is access equipment in good condition e.g. podiums, mobile towers, stepladders and ladders ?

  • Are all portable ladders classified to EN131 ?

  • Do all Podiums comply with either PAS 250 or BS 8620 ?

  • If applicable, are Podium Packs utilised correctly ?

  • Are operatives trained & competent to operate MEWPS, abrasive wheels etc. ?

  • Are visual & audible warning devices fitted and working on site plant ?

  • Are MEWPS switched off and keys removed from ignition when left unattended ?

  • When MEWPS are being operated in an area occupied with other workers or vehicles, is this area adequately barricaded and sufficient warning signs in displayed ?

  • Are battery operated MEWPS charged in a well ventilated area ?

4. Personal Protective Equipment

  • Are all operatives wearing mandatory PPE ?

  • Are other items of PPE being used when required ?

  • Are all items of PPE in good condition ?

  • Are operatives wearing suitable clothing ?

5. Fire & Emergency

  • Is there a means of raising the alarm, and does it work ?

  • Are there adequate escape routes and are they kept clear ?

  • Are there adequate fire exit signs ?

  • Are adequately suitable fire extinguishers provided and are they accessible ?

  • Are suitable fire extinguishers accessible within the vicinity of Hot Works ?

  • Has annual servicing of extinguishers been maintained ?

  • Are fire extinguishers fully charged ?

  • Is the area clear of combustible materials where hot works are being conducted ?

  • Is the area clear of flammable substances where hot works are being conducted ?

  • Are flammable liquids and gases stored correctly ? e.g. LPG & Acetylene

6. Housekeeping & Environmental

  • Is the site kept tidy ?

  • is the site free from trip hazards ?

  • Are materials stored safely ?

  • Is the site adequately lit in all areas ?

  • Have precautions been taken to prevent nuisance from dust ?

  • Is the area underneath and around cement silo's kept clean & tidy ?

  • Is there a bunded area around fuel bowsers ?

  • If required, is there a spill kit available and is it accessible and adequate ?

  • Have precautions been taken to prevent contamination of ground & water sources ?

  • Is there a designated waste area on the site ?

  • Is waste segregated and disposed of in appropriate skips/containers ?

  • Are skips/containers identified with appropriate waste stream signage ?

  • Are Waste Transfer Notes/Consignment Notes for the waste being kept ?

7. Static & Mobile Tower Scaffolds

  • Are static scaffolds erected, altered & dismantled by competent persons ?

  • Are all uprights provided with base plates & where necessary timber sole plates ?

  • Are all uprights, ledgers, braces & struts in position and in good condition ?

  • Is the scaffold tied to the building or structure to prevent collapse ?

  • Are upper & mid guard rails fitted at every edge to prevent falls ?

  • Are adequate toe boards fitted at every edge ?

  • Are additional brick guards provided to prevent materials falling from scaffold ?

  • Is there safe access to the scaffold platform ? i.e. Scaffold staircase system or a tied ladder extending 1m or 5 rungs above landing point

  • Are work platforms fully boarded & are boards arranged to avoid tipping or tripping ?

  • Are scaffold platforms free from debris & materials ?

  • Are there effective barriers or warning notices in place to stop operatives using an incomplete scaffold ?

  • Is the Maximum Safe Working Load (SWL) displayed on scaffold loading bays ?

  • Are loading bays fitted with swing gates or other edge protection to prevent falls ?

  • Does a competent person inspect the scaffold at regular intervals ?

  • Are mobile tower scaffolds erected, altered and dismantled by competent persons ?

  • Do mobile tower scaffolds have scafftags or similar means to identify inspection ?

  • Are these inspections being carried out by a PASMA qualified person ?

  • Have mobile tower scaffolds been correctly erected ?

  • Are incomplete mobile tower scaffolds suitably identified to prevent use ?

8. Site Security & Public/Site Operative Safety

  • Is the site securely fenced from the public with hoarding or other suitable barriers ?

  • Are site safety notices prominently displayed ?

  • Is the site adequately protected from trespass ?

  • Is there a site speed limit? Is it enforced & being adhered to ?

  • Are pedestrian & vehicle routes segregated as far as reasonably practicable ?

  • Has robust fall protection been provided across dry riser openings ?

  • Has robust fall protection been provided across lift shaft openings ?

  • Are there adequate barriers or edge protection to stop operatives or materials falling from roofs ?

  • Are operatives & members of the public protected from falling material ?

  • Have hearing protection zones been marked ?

  • Are holes barricaded and marked to prevent falls ?

  • Are energised circuits, panels and other conductors properly guarded or secured ?

  • Are temporary 415 volt sub-main enclosures securely locked ?

  • Have operatives been informed of any potential Asbestos Hazards ?

9. Excavations

  • To reduce the risk of collapse, have adequate precautions been taken to ensure that excavations are made safe by the use of trench supports or sloped/battered back to a safe angle ?<br>(Depending on the soil properties, be aware that there is No Safe Minimum Depth of excavation).

  • Is there a safe means of access & egress into and out of the excavation, e.g. sufficiently long, secured ladder ?

  • Are there barriers or other methods of protection to stop people & vehicles falling in ?

  • Is the excavation safe in relationship to the stability of neighbouring structures or services ?

  • Are materials, spoil and plant stored away from the edge of the excavation to reduce the risk of collapse ?

  • Is the excavation regularly inspected by a competent person ?

10. Safe Method of Working

  • Are Temporary Works carried out in a safe and proper manner ?

  • Are the wheels of mobile tower scaffolds & podiums locked when in use ?

  • Are the platforms of mobile tower scaffolds & podiums empty when they are moved ?

  • Are operatives accessing and egressing mobile tower scaffolds correctly ?

  • Are operatives closing the gate when working on podiums ?

  • Are MEWPS being operated safely ?

  • Has a suitable Permit to Work system been implemented ?

  • Is there a safety barrier around portable pipe threading machines ?

  • Have welding screens been erected where arc welding is being conducted ?

  • Are warning notices displayed when welding works are in process ?

  • Are operatives following Method Statements ?

Audit Observations

  • ADDITIONAL COMMENTS

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.