Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
PROJECT:
-
Job
-
LOCATION:
CHECKLIST
-
1. Correct pump for use .
-
2. Correct pump delivered
-
3. Damage to pump
MOUNTING OF PUMP
-
Pump location as per drawing
-
Correct mounting brackets used
-
Correct material used
-
Pipe brackets as required
-
All pipework completed in area
-
All pipe work pressure tested
-
Control panel mounted in accessible location
-
Control panel securely fixed
-
Power supply connected to panel
COMMISSIONING:
-
1. Pump commissioned by supplier
-
2. Water supply turned on
-
3. Electrical supply turned on
-
4. All valves in operation position
-
5. All pressure gauges working and visible
-
6. Pump operating correctly
-
CHECKED BY:
-
SIGNATURE:
-
Date